Loading…
Loading…
4,925 results • Best match
Supplying, laying, fitting, fixing and jointing of HDPE pipeline of distribution system with allied works and providing FHTC (Functional House Hold Tap Connection) for Mukutmanipur, Khatra and Ranibundh (Zone-II/A) Water Supply Scheme
Supply delivery construction commissioning and completion of all civil works including all allied related and enabling works for Chandal Bandi piped water supply scheme
Supply delivery construction commissioning and completion of all civil works including all allied related and enabling works for Bhat Puskarani piped water supply scheme.
Supply delivery construction commissioning and completion of all civil works including all allied related and enabling works for Atra piped water supply scheme
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SAPNA) at different habitation and extention of distribution pipe line for Augmentation of (Zone-I) Manbazar W/S Scheme of Purulia Sadar Sub_DiV
Laying distribution system including allied works for Augmentation of RAMPUR Piped W/S. Scheme of Sonamukhi block of Bankura District under Bankura Division, PHE. Dte.
Water supply Tap Connection Arrangement for 43 nos School upto 200 Students, within Bandwan Block (Part-B) of Purulia District under Purulia Division, PHE Dte.
Supply delivery construction commissioning and completion of all civil works including all allied related and enabling works for Ranibandh piped water supply scheme.
Water supply Tap Connection Arrangement for Sourceless 4 nos School upto 200 Students within ARSHA Block ,16 nos School upto 200 Students, 1 nos School for 201-500 Students within BAGHMUNDI Block, 10 nos School upto 200 Students within JHALDA-I Block
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF (i) Widening /Improvement to 2 Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to km 30.970 of NH 202 in the State of Manipur on EPC mode.
Consultancy Services as AE for Supervision of Consultancy Services as Authority Engineer for Supervision of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0.00 to Ch. 53.04 Total Design Length 53.04 Km of Tato to Manigong
Consultancy Services as Authority Engineer for Supervision of Construction of Intermediate Lane of Pango to Jorging Road from Design Km 0 to Design Km 40, Total Length 40 Km, Pkg-I, Greenfield Alignment) in the State of Arunachal Pradesh
Survey, Study, Investigation, Detailed Project Report, DNIT, Construction Supervision and Contract Management, for the work relating to Water Supply, Sewerage, Storms, Septage management, Sewerage Treatment Plant.
KIIFBHILLHIGHWAY PLACHERY KARINKALLUMOOZHY ROAD CH 0000 TO CH 7500Urgent Rectification Works for Sabarimala Identified Roads in connection with Sabarimala Makaravilakku Festival in Pathanamthitta District Under KRFB-PMU PTAKTM Divisi
KIIFB-Premonsoon work- 2022- 23- Clearing choked culvert and drains, lowering side berms, clearing grass and cutting down dangerously overhanging branches of trees under KRFB-PMU,Kozhikode/Wayanad Division
Providing Construction Supervision Consultancy (CSC)(Third party) services for 2 No. of approved works Construction of CC road to Taranagra By pass road via S.Gangalapura, V.Nagalapura, Bannihatti check post in Sandur Taluk from ch 0.00 to 5.10 & from Narayanapura to connecting SH-131 near Rajapura Cross from Km 0.00 to 5.30 and 8 culverts in Sandur taluk (Work indent numbers.23267, 29120) in mining affected areas of Sandur taluk under CEMIZ - KMERC Grant.
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for the balance work of 13 km length on Helwak - Patan - Karad section Km 85.000 to 133 . 417 of NH
Consultancy services for Authority Enginee for Rehabilitation and Up gradation of from Bhokardan to Kumbhari Fata Km. 13.500 to Km.17.00 and Rajur to Jalna Km. 39.850 to Km. 62.420 Existing Carriageway to 2 lane 4 lane with
Consultancy Services of Authority Engineer for Improvement Construction To 2-Lane with Paved Shoulder of old NH-40 new NH-206 from Km 37.550 to Km 45.760 Design Km 0.000 to Km 7.760, Package-III Pynursla Bypass on EPC mode
Consultancy service for Authority Engineer for Improvement and Widening to two lane with paved shoulder of road from km 101.300 Khowai to km 236.213 Harina Total length 134.913 km of NH 208 in the State of Tripura under JICA ODA Loan
Request for Proposal (RFP) for appointment of Authority Engineer(s) for providing project management services for Project-1: Construction of new Broad Gauge line between Mid section (km:5.72) and Kuppam (incl.) (km:23.869) under Marikuppam - Kuppam new line project (23.7km) including Civil & Track works, Signal & Telecommunication works, Railway Electrification and Electrical general services (EPC) and for Project-2: Construction of a New Broad Gauge Railway line between Maluguru (chainage (-) 1906.6 (Ch: 108125 of YNK-PKD)) to Palasamudram (chainage 17/150) including 02 new yards (Chalivendala & Palasamudram) and existing Maluguru yard modification with a route length of 19.057 km including Signal & Telecommunication, Electrification & Electrical general service works (EPC).
BLDC Motor, Kamikaze drone electronic stack includes fight controller, esc, pcb, GPS Module, Remote Detonation Module with Ammunition Filling Compartment, Transceiver Air Unit, Day and Night Camera, RTK Ground Control Station with Master and Slave ... Validation, Project Management Consultancy and
Annual maintenance and repair of all Computers,Printers, Plotter and Copier Machine including peripherals installed at the offices of the Project Director (Headquarter) PMU, SERP of the Irrigation and Waterways Department
Short Term Maintenance Contract (STMC) for maintenance and repair of NH 06 from Km 133 to Km 147.8 on single percentage rate basis under PMU Kolasib in the state of MIZORAM
Invitation of Bid for Hiring of 3 (Three) Nos. of Vehicles (01 No. Innova Crysta / Equivalent, 01 Scorpio / Equivalent and 01 Bolero / Equivalent) for office of NHIDCL, PMU Jorhat.-5th Call
(ii) Construction of two lane Fatehpur Bypass,Mandawa Bypass and Jhunjhunu Bypass on EPC Mode (iii) Construction of Balance work 2 lane ROB and its existing level crossing no.A-142 at km 1.0 of NH-709 near Sadulpur Railway Station Churu on EPC Mod
of Rajasthan on EPC Mode (ii) Construction of flyover at Indira Circle along with LVUP a with provosion of RE walls in approaches in the State of Rajasthan on EPC Mode.
Selection of Authority engineer for supervision of civil construction works of (I) (i) Construction an up gradation of existing road to 2lane with paved shoulder from existing Chainage Km 504.871 to Km 508.610 of NH-07 (Old NH-58) (Lambagarh to Ben
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-A, Design chainage from Km 0.000 to Km 117.560) on EPC Mode in the State of Arunachal Pradesh under Arunach
E-Tender-24/EE/PMU/PBVR/ 2020-21/ PBVR-04/17.12.2020 (Re Tender of Rerouting 11kV line from MV Alias transformer to Thanimolem for interlinking Pattimattom and Kadayiruppu feeders under Ele.section, Pattimattom
Based on the intimation received from Execuitve Engineer KRFB PMU Palakkad Malappuram vide Letter No KRFB PWD016 BRPU3 dtd 312 2021.Tis estimate is prepared to conduct Total station survey Subsoil investigation
This project comes under Pathanapuram constituency in Kollam. The project road has 14km, out of which the patch work is to be done from km 5/000 to 14/000. Estimate includes pothole filling, levelling course, mix seal surfacing etc.
The work schedule included are scarifying the damaged bitumin surface.. excavation..... filling abnd compacting with wmm...applying tack coat and then close graded MSS
Rehabilitation and up-gradation to 4-lane configuration of Kashipur to Ramnagar road from km 5.735 to km 24.00 of NH-121 (km 64.735 to km 83 New NH-309 18.265 km on EPC Mode in state of Uttarakhand.
Engagement of an Agency for Construction Supervision and Consultancy, providing assurance of conducting / verification of necessary appropriate testing including documentation, submission of reports for the fabrication erection of steel structure
Engaging Consultancy Firms / Consultants for survey, studies, investigation, preparation of feasibility report, detailed project report, detailed notice inviting tender, construction supervision and contract management for works relating to water su
ELECTRONIC COMPONENTS FOR FLIU AND PMU MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Bid Number ( ) : GEM/2024/B/5144742 Dated : 13-07-2024 Bid Document EMD Detail 1/7 Required No ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 14 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : DS Advanced Systems Laboratory Hyderabad, Department of Defence Research & Development, Office of DG (MSS), Ministry of Defence (Director) Splitting
AMtc of EPHS in Sector 7 Urban Estate Ambala City Supply of Stand by 10BHp Non clog Sewage Submersible Motor pump MS pipes Cable Nut Bolt Panel board and PMU complete in all respect
Construction of partition wall with Aluminium profile and particle board and supply of chair, table, almirah at DPMU office at 1st floor of Superintending Engineer-I, PMU office building under Purulia Division, PHE Dte.
Constructing 2.7 km HT/LT line for inter linking 10 th ACRE FEEDER (Edamon S/S ) to Thenmala Town Feeder (Thenmala S/S ) from RPL factory to Thekkumala on PMU 2018-19 under Ele.section, Kulathupuzha.
Monthly Basis Cab & Taxi Hiring Services - Premium SUV; 3000 Km x 364 hours; Outstation 24*7
Selection of bona fide Chartered / Cost Accountant Firms for Internal Audit for Financial Year 2024-25 of PMU and DMUs of Project for Forest and Biodiversity Conservation for Climate Change Response in West Bengal (WB-FBCCCR).
KIIFB Project Chengannur bypass road in Chengannur constitutency in AlappuzhaDistrict Planting boundary stones phase 2 3 4 Topographical Survey Work
Engagement of 01 no. Computer Operator / Data Entry Operator (Category - C) for the office works of Superintending Engineer, PMU, WBDWSIP (ADB), PHE Dte. under Executive Engineer, South 24-Pgns. W/S Division-I, PHE Directorate (w.e.f. 01.04.2024)
AS_FDR_RFP_01 RFP FOR SETTING UP OF A PMU FOR PREPARATION OF DPR, TENDER DOCUMENT (BOQ), QUALITY CHECK AND PROGRESS MONITORING FOR ROADS PROPOSED FOR UPGRADATION WITH NEW TECHNOLOGIES LIKE FULL DEPTH RECLAMATION AND STABILIZATION UNDER PMGSY-III
RFP FOR APPOINTMENT OF CONSULTANT FOR ESTABLISHING A PMU UNDER SPR WING OF DoWR, RD AND GR, MoJS FOR DESKTOP MONITORING AND MANAGEMENT OF PROJECTS COMING UNDER STATE PROJECTS (SPR) WING OF DoWR, RD AND GR MoJS
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local
Manpower Outsourcing Services - Minimum wage - Semi- skilled; High School; Admin
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin