Loading…
Loading…
2,308 results • Best match
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6306783 Dated : 04-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Provn of plinth with overhead roof of galvanized corrugated sheet of 20/25 feet height on iron frame for storage of hay baled and one static water tank with water pump pipeline and nozzle for firefighting at 488 (I) Sup Pl ASC at Mil Stn Gaya
PROVN OF 10 KVA SERVO STABILIZER AND LIGHTING ARRESTER FOR IT SERVER ROOF AT OTA GAYA PROVN OF LIGHTING CONDUCTOR FOR KERB SIDE PUMP (KSP) AT OTA GAYA SPL REPAIR AND REPLACEMENT OF SECURITY LIGHTS AND TIMER PANELS AT CENTRAL PARK AT MIL STN GAYA PROV
Construction of 125mm X 40mm X 61 M Deep Tube Well IM-II Hand pump with 1.0M dia. X 2.0M Deep Circular Soakpit for Providing water in blocks of Gogri,Beldaur, Chautham And Parbatta in khagaria district under P.H Division,Khagaria for the year of 2025-2026.
Construction of 125mm X 40mm X 61 M Deep Tube Well IM-II Hand pump with 1.0M dia. X 2.0M Deep Circular Soakpit for Providing water in blocks of Khagaria,Alauli and Mansi in khagaria district under P.H Division,Khagaria for the year of 2025-2026.
M3755050001 SUCTION STRAINER, OIL FILTERATION UNIT, Delivery Days M3755050004 SUCTION PUMP, OIL FILTERATION UNIT, M3755050011 DELIVERY PUMP, OIL FILTERATION UNIT, M3755050015 SEAL, GSKT & O-RNG, OIL FILTERATION UNIT ( 10 set )
PROCUREMENT OF INT BRG BUSH THRODON OFSTG2 AWRS LIFT PUMP FOR KAHALGAON
Procurement of Spares of 12 10 FFAH ModModel Pump for 3x500MW Units
Arthroscopy system with camera and shaver, Arthro pump and recording device (Q3)
Miscellaneous Civil works of Designing, fabrication and Erection of Shed over pumps/UG tanks/ETP, Provision of Security Cabins, Retaining walls, Drains, Area Development and landscaping and other allied works at Motihari Terminal
SUPPLY AND INSTALLATION OF RUBMBLE 18000 CMH AIR COLLER (WHITE MODEL) WITH TOTAL SECURITY PROTECTION BOX FOR MOTOR AND WATER PUMP GI DUCT BAND AIR GRIL AUTO SWING FABRICATION STAND WITH SHEEL. MAKE- AIRCONE AIR COLLER SYMPHONY, BAJAJ, SAHARA OR SIMILAR. AS PER TECHNICAL SPECIFICATION ATTACHED IN ANNEXURE-A.
Construction work of 30 nos. new IM-II hand pumps [125 mm/115 mm 70 m deep D.T.W. ? 10 nos. and 125 mm dia 45 m deep gravel packed T/W ? 20 nos.] with 30 nos. soak pits of 1 m diameter and 2 m depth, including provision of platform and drain, under Natural Disaster (Drought) Relief for drinking water supply due to heatwave, extreme summer conditions, disaster situations, and declining groundwater levels in Rohtas District under P.H. Division, Sasaram, for the year 2026?27.
CONTRACT FOR JUNGLE CUTTING INSIDE PLANT AREA AND GANGA MAKE UP PUMPHOUSE FOR THE YEAR 2023 24 All parts O n M Area PART 5
CONTRACT FOR JUNGLE CUTTING INSIDE PLANT AREA AND GANGA MAKE UP PUMPHOUSE FOR THE YEAR 2023 24 All parts O n M Area Part 2
CONTRACT FOR JUNGLE CLEANING INSIDE PLANT AREA AND GANGA MAKE UP PUMPHOUSE PART- 6
Single Tender
CONTRACT FOR JUNGLE CUTTING INSIDE PLANT AREA AND GANGA MAKE UP PUMPHOUSE FOR THE YEAR 2023 24 All parts O n M Area PART 4
CONTRACT FOR JUNGLE CUTTING INSIDE PLANT AREA AND GANGA MAKE UP PUMPHOUSE FOR THE YEAR 2023 24 All parts O n M Area PART 6
CONTRACT FOR JUNGLE CUTTING INSIDE PLANT AREA AND GANGA MAKE UP PUMPHOUSE FOR THE YEAR 2023 24All parts OnM Area PART 08
CONTRACT FOR JUNGLE CUTTING INSIDE PLANT AREA AND GANGA MAKE UP PUMPHOUSE FOR THE YEAR 2023 24 All parts O n M Area PART 7
Energy Audit Services - Detailed; Commercial Building, Industry, Industrial unit, Institutions, Pump houses Hospitals
BATTERY OPERATED COMBI-TOOL, TELESCOPIC HYDRAULIC RAMSET WITH MATCHING FOOT PUMP, HYDRAULIC SPREADER
Annual repair, Shifting, installation, operation & maintenance and restoring of Pump at Temporary Drainage Pumping Stations Gr-09 (A) Big Hospital, 09 (B) As per Order Azimabad, 09 (C) As per Order Kankarbagh under Patna East (Mech.) Works Division, Buidco, Pahari, Patna for the Period of done before monsoon 2026 for the year (2026-27).
Screwdriver Insulated, Heavy Duty Screwdriver insulated, Electrician Screwdriver thin stem insulated handle, Punch Centre, Steel Rule Graduated both in Metric and English Unit, Pincer, Chisel Cold, Allen Key alloy steel, Grease Gun, Scissors blade, ... Appliances- Motor Pump set , ...
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6553516 Dated : 08-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 500000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6553542 Dated : 08-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 500000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6551818 Dated : 08-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 500000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6553602 Dated : 08-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 500000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6553575 Dated : 08-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 500000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Procurement of LT Motor for Stage-1 Cooling Tower Fans and Vacuum pumpfor NTPC Barauni Thermal.
Procurement of Condenser Vacuum Spares for Dadri Talcher Barauni andKudgi
Bidders are requested to submit the required documents.
Mechanical Seal complete Assembly Of Condenser Vacuum Pump and CEP atBRBCL (250 MWX 4)
CCTV, Dome Camera, CAMERA, Pawar Supply, Pump, Handwash, Dustbin, Chest Press BOQ Title OFFICE1
Vapour in Air Diffusion Apparatus, Solid In Air Diffusion Apparatus, Absorption in Wetted Wall Column, Simple Batch Distillation Column, Sieve Plate Distillation Column, Liquid Liquid Extraction in Packed Bed, Forced Draft Tray Dryer, Humidification ... Reactor-Peristaltic Pump Feed ... Peristaltic Pump Feed ... Peristaltic Pump Feed ... Peristaltic Pump Feed ... Peristaltic Pump Feed ... Peristaltic Pump Feed ... Peristaltic Pump Feed ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Service Provider Premise; Refurbishment of Double MECHANICAL SEAL of M/s Eagle Burgmann Make which is compatible with M/s KEPL make LPG Pumps; Service Provider
Upgradation of IGIMS Patna (Bihar) (Under PMSSY Phase-VB) SH:- Upgradation of Regional Institute of Ophthalmology and Upgradation of department of Nephrology & Kidney Transplant including Ramp, Water supply, Sanitary Installation, Internal Electrical ... Booster Pumps etc. ...
Construction of 23 Nos 125/115mm dia x 61m deep Drilled T/wells and 26 Nos 125mmdiax45m Gravel Packed T/Wells with India Mark II Hand Pump Platform and drain and with 49 Nos of soakpit during summer seasons in the water scarce area under P.H.Division, Jamui for the year 2025-26.
Construction of 22 Nos 125/115mm dia x 61m deep Drilled T/wells and 25 Nos 125mmdiax45m Gravel Packed T/Wells with India Mark II Hand Pump Platform and drain and with 47 Nos of soakpit during summer seasons in the water scarce area under P.H.Division, Jamui for the year 2025-26.
Facility Management Services - LumpSum Based - Providing, Supply and installation of hand pump with all accessories at various sites; Providing, Supply and installation of hand pump with all accessories at various sites; Consumables to be provided by..
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7150288 Dated : 25-01-2026 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7077613 Dated : 06-01-2026 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7077581 Dated : 06-01-2026 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7077556 Dated : 06-01-2026 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
deepwell hand pumps as per IS 15500 (Part 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7150290 Dated : 25-01-2026 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Custom Bid for Services - CALIBRATION AND TT FILLING ASSISTACE, Custom Bid for Services - ASSIST TT FILLING GANTRY SHIFT BASIS SEMI S, Custom Bid for Services - ASSIST PUMP HOUSE OPERATION, Custom Bid for Services - OFFICE ASSISTANT, Custom Bid for Services - DEPOT OPERATION ASSISTANT SS, Custom Bid for Services - FIRE FIGHTING O AND M, Custom Bid for Services - EXTENDED HOURS, Custom Bid for Services - EXTENDED HOURS OFFICE ASSISTANT, Custom Bid for Services - MAN POWER SUPPORT AFTER 8 HOURS, Custom Bid for Services - DEPOT OPERATION ASSISTANT 1EACH SKILLED AND 1 UNSKILLED, Custom Bid for Services - ETHANOL UNLOADING
Procurement of spares for M/s MBPL make 65 TPH Clinker Grinder, Jet Pumpand Feed Gate of Bottom ash handling system for NTPC Barauni
ISO VG 1000 Hydraulic oil, for pinion di [ISO VG 1000 Hydraulic oil, for pinion dismounting arrangement suitable for 3200 BAR PTG pump. As per specification: Kinematic viscosity - CST @ 40 degree C 980-1050, Viscosity index min - 80, Flash point (COC), degree C min - 220 degree C, Pour Point degree C max -6 degree C.]
Comprehensive operation and maintenance, routine repairs and Special repairs of a. Rural Piped Water Supply Scheme (PWS), b. Ward level Piped Water Supply Schemes in non quality affected wards (WLS Non Quality) based on item rates; constructed by ... the pump operators, ...
Annual repair, shifting, installation & maintenance and restoring of pump after monsoon of drainge pumping station 11(1)AIIMS Hospital TDPS, 11(2) Isopur Brahmsthan TDPS, 11(3) Police Colony TDPS, 11(4) Walmi Gate TDPS under Patna West (Mech.), Works Division, Buidco, patna for the period done before monsoon' 2026 for the year 2026-27