For repairing of 4000 GPM Pump 10UPH8 Kirloskar ar SB Workshop 150 Mtr Head S.No.BCCL/SJA/P4000/N1 at Sendra Bansjora workshop under Sijua Area
Slime Transfer Pump (Bare Shaft) with accessories CAP- 300m3/hr, H-50M as per specification attached
Repairing of pnumatic grease pump assy of EKG 493 shovel of ABOCP of Block-II Area
Complete repairing and full overhauling of TWO Nos of 500 GPM, 150 mtr head multistage type, 5 stage pump make KBL, Model- MLA-125x150, Sl. No - 01 and 10 of IWSS,CCD for row water supply from river site to central colony, Singh Nagar filter plant
For towards fabrication of (i) pontoon of size 21 x 21 (ii) manual pontoon of size 8 x 6 (iii) installation of 3000 GPM Pump Motor Set with base plate on pontoon Basdeopur Colliery under Sijua Area
Procurement of spares of LT motors (lub oil motors of CM PA Fan ID Fan FD Fan coal feeder clinker grinder Recovery ash water pump motor etc) pertaning to ESI section of 1X500MW Unit of DVC BTPS
Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set and high yield Drilled Tube well 200mm x165mm x 200.0 M deep for Block-Karown, Panchayat-Dindakoli, Village-Tikaitbandh Budhwatanr, Tola- Budhwatanr
Construction of rural water supply Scheme with 1.0 HP DC Solar motor pump complete set and high yield Drilled Tube well 200mm x165mm x 200.0 M deep for Block-Karown, Panchayat-Birangariya, Village-Sonabank, Tola- Ray Tola.
New manufacturing, supply and fitting pump shaft (5m3/min. pump), size of raw materials OD-5 inch/127 mmX length 3000mm, grade SS 410 of Moonidih Workshop, WJ Area
Screw Pump Flow rate- 250-300 kg per min, FLP Motor, Pressure switch etc. for Singrauli, The Progressive pump of the RM series used for loading the silos from the tanker for Kathara, Electrical Panel VFD for Motor and the instrument display along ... for pumps and ...
Complete repairing of Unit Injector Hydraulic Pump of caterpillar 506 and and 585 of ABOCP mine of Block-II Area
For repairing/overhauling of 5 stage, 1000GPM,180 mtr head pump, make-Kirloskar of Nichitpur Colliery under Sijua Area.S.No.126288170003
Procurement of SAM MAKE DEBRIS FILTER BACK WASH PUMP, MODEL NO. : WPM 150/250 for BTPS 500 MW
Repairing of Steering pump (2191964) of CAT 773D Dumper sl. no. 255 of ABOCP of Block-II Area.
Repairing and modification of New base plate 6UP4 pump Sl. No 12 at damodar
Diversion of 6MS pipe line supplying water to B-Type pump house sump due to extension of departmental OCP in north-east side at NOCP under Sijua Area
Complete Repairing of SD-15 300 Amps, Star Delta Starter 550Volt 09 No. Pump House Sl.No.300A/550V/KNC/03 Make Kilburn of Kankanee Colliery under Sijua Area
Repairing of main pump(left) of RECP 750E Drill sl no. 602 of ABOCP Mines.
Repairing of DSM4RM Pump installed at Filter plant of Check post colony under Urimari OCP.
Set of Bottom ash overflow transfer pump (BAOTP) make: SAM TURBO, Model150/400+ TCN+ N
Supplying installation testing and commissioning of V T pump set and associated works at Raw water pumping plant Urawan Reorganization for urban water supply Scheme Jhumaritilaiya under D W and S Mech Division Hazaribag.
Installation of Drinking water facility through pipe line and provision of over head PVC tank by drawing water from deep bore through submersible solar pump set at Chilgo village under CSR, DVC Konar Dam.
Installation of Drinking water facility through pipe line and provision of over head PVC tank by drawing water from deep bore through submersible solar pump set at Nawatand village under CSR, DVC Konar Dam.
Installation of Drinking water facility through pipe line and provision of over head PVC tank by drawing water from deep bore through submersible solar pump set at Garmurgi village under CSR, DVC Konar Dam.
Complete Repairing/ Rotating unit Sl.No. 10 UPH8 4000 GPM 150 Mtrs Head Kirloskar Make Pump Sl. No. BCCL/JG/Pump /4000 GPM/09 of Amal.NT-ST-JG OCP under Lodna Area.
Shifting of Double story pump from old position to newly made base foundation and Laying of suction, Delivery pipeline 8 inch dia for installation of 2000GPM pump at IWSP, BnK Area
Supply and fitting 8 inch sluice valve, strengthening of damage steel Bed structure of RKB pump, Suction side pipe line accessories fabrication of DSM 4 pump at Kabribad Mine, GRD Project
CASTING AND MACHINING OF PHOSPHOR BRONZE BEARING OF PV- II PUMP AND SLEEVE BUSH OF ROTOR MAKE PUMP AT AREA WORKSHOP SL.NO.BCCL/KA/AWS/PV-II/P-5) UNDER KATRAS AREA
Complete Repairing /Overhauling of 4 Stage 120 H.P. 120 Mtrs head 800 GPM MAX FLOW Make Pump Sl.No. BCCL/NT/GPM800/ Pump/18 of Amal.NT-ST-JG Colliery under Lodna Area. .
Repairing work of 4UP-3 Pump,500GPM,60 Mtrs. head make Kirloshker to upper and lower make-Kirlosker, Project Sl.No-pump/FB/02 for filter-bed of GVP Ph-II OCP.
Converter Pump flange gasket as per ELS/TATA Drg. No. - TATA/RS/MISC/1108 attached for M/s BHEL make IGBT Converter Pump. Material-Permanite (metallic ) as per IS-2712-1971.
Part Repairing of 500 GPM Pump make-willo Malter and platt pump, Head 90 m, type 100/150 GST OA No. 81269156/80/1 at Quarry No. 2 under Kathara Colliery.
Repairing of steering, hubs, air cooler, radiator, water pump of engine/fitting of radiator assy. water pump assy. of Generator of Service Van SI. No.JH10VE-3268 of Dahibari OCP, CV Area.
Repairing and reconditioning/overhauling of 2000GPM,150M Head pump Make Flow more pump under Ashok project, PPR Area. (Transportation of materials from designated place to work site in mines is included )
Repair and Maintenance of Water Tanker (28 KL) WS-28015 at Bokaro OCP. A) Overhauling of water pump assembly including replacement of mechanical seal, impeller shaft bearing and pump shaft seal.
Complete repairing/ reconditioning of 4000 GPM 10 UPH8 150 Mtrs Head Kirloskar Make Pump Local Id.JG/Pump/10 UPH8/11 of Amal. NT-ST-JG OCP under Lodna Area.(Sl.No.-1734421006)
HAULING UP OF 2000 GPM PUMP AND PV III PUMP WITH DIVERSION OF 10INCH DELIVERY INCLUDING SHIFTING OF 10 NRV AND SLUICE VALVE (SECOND TIME) AT AKWMC, OCP UNDER KATRAS AREA
Shifting of pump along with dismantling and erection of 10inch dia M.S.Pipe range due to displacement of pump and pipeline from existing position during blasting at Jarlahi patch, Phularitand, AMP Colliery.
Complete repairing/reconditioning of 80 Mtrs Head 800 GPM Mather and Platt Make Pump Local id-BCCL/NT/Pump/800 GPM/05 of Amal. NT-ST-JG OCP under Lodna Area.
Repairing of both steering cylinders eye, its mountings holes, pins, bushes, shims and repairing of main hydraulic pump and pilot pump of forklifter sl no L4 at Ashok open cast project.
Fabrication of coupling set with matching and alignment of one 3CHR 2000 GPM pump and another 2000 GPM split casing pump with motors of capacity 435 KW in r/o AADOCM.
Repairing of complete gear box assly complete clutch system assly pump coupling like gear with hub , pump coupling U.J Cross Kit, Yoke with flange requires replacement fitting etc for ACE Crane
Custom Bid for Services - Day to day operation of mine dewatering pumps installed at Girja Section of mines for 183 days at Chitra Colliery, S P Mines Area For 2 shifts per day Similar Category Manpower Outsourcing Services - Minimum wage
Making of Nipples, Bends, and Short Pieces needed for extension of the 8 inch dia M.S. delivery pipeline of the Pumps, in operation in Mine, w.r.t. Karo OCP, under BnK Area
Different type of pumping and pipe line works in departmental (dragline) coal face, during monsoon season, shifting installation of 3200 GPM/4000 GPM pumps of ABOCP Mine under Block-II Area
ROUGH CASTING OF PHOSPHOR BRONZE COMPONENTS FOR DIFFERENT PUMPS BY RECYCLING PHOSPHOR BRONZE DUST/CHIPS SL.NO.BCCL/KA/AWS/6UP3/02, AWS/PV III/P-3 FROM AREA WORKSHOP UNDER KATRAS AREA
Electrical repair/maintenance of HT and LT overhead lines, service cables and other associated peripherals related to domestic power supply and water supply pumps at Dugdha T/ship, Block-II Area
Complete Repairing and Re-winding of 20 Nos. of 2 HP Jet pumps at workers colony and officers Colony at different places of Amal. NT-ST-JG Colliery under Lodna Area.
Repairing of 02 nos. induction motors, 435HP, 3.3KV, 1485RPM GEC make and 125KW, 3.3KV, 1484RPM marathon make attached with 1000GPM pumps installed installed at A and B patch of Tarmi OCP.
Laying and fixing of 6 inch and 8 inch dia pipe line for installation of three pumps at new pumping station at Sump 01 in respect of Rohini Project, NK Area