Loading…
Loading…
13,262 results • Best match
Complete repair/full overhauling of 2nos 2000 GPM,10/12PLURO X3CHRS,150 m head,MandP make,multistage pumps received from Giridih W.Shop in breakdown condition required for mine dewatering including fabrication works of base plate with bolts,coupling
Revival of Defunct IM II Hand Pumps by Changing their Rotten Riser Pipes, damaged connecting rods, damaged C.I. Cylinders and other spare parts (wherever required) in different block of Lohardaga District under D.W.and S. Division, Lohardaga (Gr.2)
Erection of Poles and Laying of Conductor for 3.3 KV Line extension work required at Joriya side to facilitate relocation of electric Pumps to be used for dewatering purpose at Kujama Section of Kujama Colliery under Lodna Area.
Cutting and welding of 6 inch and 8 inch dia G.I. pipes to make short pieces and reducers required for changing the location of pumps as and when required in D.D. Mines, w.r.t. Bokaro Colliery, under BnK Area
Repairing of 05 Nos. of 6.6kV DOL Starter, Make Sait Mine Line Pvt. Ltd and 02 Nos. 6.6kV DOL starter, Make Prot India for operation of pumps at Jehlitand sump and Main Sump under KDH OCP, NK Area
Day to day running repairing, mechanical maintenance work with suction and delivery attachment for operation of 1000/2000 GPM pumps along with associated motor installed at open cast mines for mine dewatering in respect of AADOCM, Dhori Area
Supply, providing, testing and commissioning of 8 inch dia Jetting Hose Pipes and all allied arrangements with the delivery side of the two nos. of 2000 G.P.M. Pumps in operation, in Mine, w.r.t. Karo OCP, under BnK Area
Major and Minor Routine Repairing of IM II Hand Pumps in rural areas of District Dumka for the month april-2025 to march-2026 under Drinking Water and Sanitation Division No.1, Dumka. Group No. SKP/RM-02
Revival of Defunct IM II Hand Pumps by Changing their Rotten Riser Pipes, damaged connecting rods, damaged C.I. Cylinders and other spare parts (wherever required) in Pesrar Block of Lohardaga District under D.W.and S. Division, Lohardaga (Gr 7)
Revival of Defunct IM II Hand Pumps by Changing their Rotten Riser Pipes, damaged connecting rods, damaged C.I. Cylinders and other spare parts (wherever required) in Kairo Block of Lohardaga District under D.W.and S. Division, Lohardaga (Gr 6)
(A) Diversion of 6.6kv O/H line utilized for operation of Pumps at Jarlahi and (B) Diversion of LT 220V O/H line for lighting purpose due to advancement of OB dump under Muraidih, AMP Colliery, Barora Area,
Revival of Defunct IM II Hand Pumps by Changing their Rotten Riser Pipes, damaged connecting rods, damaged C.I. Cylinders and other spare parts (wherever required) in Lohardaga Block of Lohardaga District under D.W.and S. Division, Lohardaga (Gr 1)
Custom Bid for Services - Day to day operation of mine dewatering pumps installed at Khoon Section of mines for 183 days at Chitra Colliery SP Mines Area For 02 Shifts per Similar Category Manpower Outsourcing Services - Minimum wage
Day to day running repair and mechanical maintenance work including suction and delivery attachments and operational spares of 05 nos. 500 GPM and 300 GPM axially split case pumps along with associated motors installed at different locations of SDOCM
(2) Construction of a bathing ghat at Bauri Dhaura under Mandra Panchayat.
Repairing/Rewinding of 0.55 KW 220V Motor SI. No. DFA 62252 Make Ansons of Diesel Pump at Potanga under Urimari OCP.
Installation of 03(Three) nos. tube wells with hand pump at Tilodih, Singhpur and Budhidih village under CSR - DVC Tilaiya Dam
Repairing/overhauling of complete welding set generator Engine F I Pump nozzle like piston with pin, liner, main bearing
Complete repairing over hauling of 2000GPM, 150 m head, 2CHR 10/12 pluro pump, make MnP in respect of AKK OCP, BnK Area.
Misc. mechanical work of welding flange 6 inch dia G.I. Pipe, sluice valve 6 inch complete repairing, Motor and pump coupling repairing, providing reduceres (8 inch to 6 inch) clamp for 500 GPM and 1000 GPM pump running in D. D. Mines
Complete Repairing and Overhauling of Pullen Make 150HP 2900 RPM Submersible 6 Stage Pump of Victory Colliery Bastacolla Colliery
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Electrical System or Installation, Installation and commissioning of 66KV overhead line from Simra Sub Station to DMZ pump house at Rajmahal OCP; Service Pro..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Making repairing of 16 nos earth pit at pit office 6600V 440V substation coal testing lab and pump house near main gate; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Erection dismantling reorganization of lighting line in Taljhari OB face OB face OB dump pump house and haul road in Rajmahal OCP; Service Provider
DOUBLE ROW ANGULAR CONTACT BALL BEARING -3222 C3, DOUBLE ROW, SPHERICAL ROLLER BEARING-22224, CYLINDRICAL ROLLER BEARING-NU328, DOUBLE ROW ANGULAR CONTACT BALL BAERING-3312, SINGLE ROW DEEP GROOVE, STEEL CAGE, BALL BEARING- 6408 C3
Cat. No: 08808501002 Bearing Housing for RMP Pump Moc: C. I. Gr FG 260 Part No: 350 Model: WK-100/4 H, Cat. No. 08808701014 Protection sleeve (suction & Delivery side) for TPP Pump (01 set= 02 nos. ) Moc, Cat. No. 08808701013 Shaft with key & check ... TPP Pump Moc: ... TPP Pump Moc: ... TPP Pump Moc: ...
Installation of 15 (Fifteen) nos. tube wells with hand pump in Gomia Block under CSR, DVC, Konar Dam.
New installation and operation 2000gpm MnP make pump marathon make motor set and other related work under KGOCP
Repairing of main pump of TATA HITAICHI EX-350 at Madhuban Coal Washery under Block-II Area, BCCL.
Cleaning and Repairing of Water tank and Pump room near South Balihari Magazin at Bhagabandh under PB Area
Erection of 3point3KV overhead line with pole for feeding power supply to Jarlahi pump at Phularitand AMP Colliery
Construction of Foundation for 150 HP, Make -MAMC Pump at River side, Bhowra (South) Colliery under E.J. Area.
Erection of 6.6 KV Benidih feeder supply 8 seam DM-31/521,4000GPM pump DECO patch of ABOCP Mine
Finish wall outside wall at Burragarh Siding of Office Shed, toilet, Challah and Pump room under Bastacolla Area
Drilling and commissioning of 08 nos. Hand Pump at different place of Balia rehab site, under Rajmahal Area.
Supply and installation of 05 nos. earthpits in Makoli pump substation and Gunjardih Magazine under SDOCM, Dhori Area
Complete repairing of 4000 GPM, 10UPH-8, KBL make pump running at ABOCP Mine under Block-II Area
Installation of lightning arrester at all substations, mines premises, pump stations, etc. of Topa OCP under Kuju Area.
Fabrication and casting of impeller CI of 4000 GPM type 10 UpH8 pump Kirloskar make of ASP Colliery.
Repairing of Reyroll England make 100A-550V switch, sl.no.FSF-952, controlling of 6UP3 pump at Laikdih filter plant
Repairing and replacement of radiator core and water pump of ACE12XW crane 647 at site of Dakra project
Repairing/overhauling of split cashing pump 2 Impeller, 400 GPM,DSM-2 of officers Banglow of Gopalichak Colliery.
Repairing of 02 Nos. main pump assly of hydraulic Shovel BE1000 SL. NO. G10123 at ADIC Kusunda Area
Repairing replacement of 8 inch dia PVC suction pipe line and its accessories for 2000GPM pump at KOCP
Providing four (04) nos. concrete slab for pump foundation at Karo mines under Karo OCP of BnK Area
Repairing of Generator, Grease pump and compressor of Maintenance van Reg. No.JH10V-3268 of Dahibari OCP, CV Area.
EXTENSION OF 3.3 KV OVER HEAD LINE NEAR THE EAST SIDE PUMP AT AKWMC OCP UNDER KATRAS AREA
Repairing of 1000 GPM, axial split casing single stage 8/8 DME, MnP make pump of Sirka OCP.
Installation of pressure filter pump room Raw water clear water tank at Dakaita village and Lohandia rehab site.
Repairing of base frame and laying of pipeline for starting of new pump at Kedla Open Cast Project.