Construction of Boundary wall for transformer protection in pump canal of OL-44 Ex-Km 94.200 of CLMC
INSTALLING NEW 10inch DELIVERY OF 3000 GPM PUMP OF LAKURKA SIDIDNG 400 METER AT AKWMC UNDER KATRAS AREA
Complete Repairing of 6UP3 Pump Kirloskar make of Filter Plant Moonidih, WJ Area. SL.No. MND/6UP3/FP/01
Repairing of 5 Stage pump, 600GPM Size 6inch x 5inch make Maxflow at Jogidih Colliery under Govindpur Area
Complete Repairing of PV-2 6 Stage Pump Make Mather and Plate of Chandmari Colliery under Bastacolla Colliery.
Ultra-High Pressure Two-speed hand pump for Pinion removing device, as per spcification Annexure 'A' BRAND-:KRIJANS
Transformer Oil Cooling Pump with Motor (MPH) as per CLW's Spec. No. CLW/ES/O-1 (Alt. - L).
Hiring and operation of Diesel pump of 10HP or above rating with supply of HSD for 06 months
Repairing and heightening of open well shayara and pump room shed at shiv mandir SBC under Sijua Area
Repair and Overhauling of Engine, Pump Device and Radiator Cleaning of EX-350 Excavator at Moonidih Coal Washery.
Repairing of Air-Conditioning System and Unit Injector Hydraulic Pump of CAT Dumper model 773E, SI. No. - 900
Drilling and commissioning of 01 nos. Hand pump at Lal Bagicha near Gangasagar rehab site under Rajmahal Area.
Complete repairing and full overhauling of TWO Nos of KIRLOSKER make 150 mtr head, 500 GPM, 5CHR, 125 x 150 mm size, multistage, MLA-5 Pump, Sl.No- 04, 07 assembly of IWSS,CCD for row water supply from river site to central colony of Dhori Area.
CABLE HARNESS APS feed pump PNEUMATIC BALL VALVE ASSLY KIT HEAD LIGHT, 24 VOLT SPIDER BEARING UJ KIT TAPE;2IN, FLURSCNT SOCKET WRENCH SET;22-50MM, 3/4IN
Making and providing glands coupling bolts bushes gland studs base bolts repair kit and gland packing for day to day requirement for pumps along with associated motors installed at Kalyani filter plant Karipani filter plant and Turiyo colony smoothly
Complete repairing and reconditioning/overhauling of 3 Nos of pumps at Site capacity 150LPS, Head 100, Make Sykes Tag No-6922( Part A), Tag No P1( Part B) and Tag No P3(Part C) under Ask OCP PPR Area.
Fabrication, painting and commissioning of two number pontoons for two number of pumps of capacity 1000 GPM each to run in the quarry sump for quick dewatering in the upcoming monsoon 2023 at Tapin North OCP under Hazaribagh Area
Shifting, dismantling and laying of pipe line 8 and 10 dia of various pumps installed at Patch A as per requirement for meeting day to day requirement for duration of 6 months(during monsoon) under Ashok OCP PPR Area.
Repair and fabrication of portable rest shelters, including sheeting for its roofing and internal electric wiring meant for deployment of manpower and upkeeping of tools and material to be used at the Pumps location under Karo OCP, BnK Area
Repair and maintenance of different type of 5 nos DOL starter and one no LT control panel of 630 Amp 440 V ACB type of different places attached with pumps of different capacities for colonies water supply under SDOCM
Interconnection of Kargali and Bokaro water supply pipeline at different points and replacement of two(02) nos. of damaged suction and delivery pipelines with 6inch dia pipeline of Kargali supply dedicated pumps along with repairing of base frames of
Fabrication of MS Bend and short pieces of 4inch, 6inch and 10inch dia required for different places of delivery line of pumps, fabrication of pontoon balancer and repairing of base frame and coupling at Phularitand, AMPC under Barora Area.
Repair and maintenance of 2 nos. 3.3 kV D.O.L. Starter, make Prot India, first Sr. No. H096 and second H186, installed in Mine for control of 1000 G.P.M. and 2000 G.P.M. Pumps in Mine under Karo OCP, BnK Area.
Revival of Defunct IM II Hand Pumps by Changing their Rotten Riser Pipes, damaged connecting rods, damaged C.I. Cylinders and other spare parts (wherever required) in Kisko Block of Lohardaga District under D.W. and S. Division, Lohardaga (Gr. 5)
Revival of Defunct IM II Hand Pumps by Changing their Rotten Riser Pipes, damaged connecting rods, damaged C.I. Cylinders and other spare parts (wherever required) in Kuru Block of Lohardaga District under D.W. and S. Division, Lohardaga (Gr. 4)
Revival of Defunct IM II Hand Pumps by Changing their Rotten Riser Pipes, damaged connecting rods, damaged C.I. Cylinders and other spare parts (wherever required) in Bhandra Block of Lohardaga District under D.W. and S. Division, Lohardaga (Gr. 3)
(A)Part repairing casting machining molding and new making or supply and fixing of spares and parts of MLA5 Pump Kirloskar Make Project SN GVP/Pump/01 500GPM 150m head and (B)Part repairing casting machining molding and new making or suppl
(A) repairing of SD15 Kilburn make OCB switch SI.No NA 32 for controlling of DSM3 pump Domestic water supply south Govindpur 09 No. Chanak (B)Repairing of 200amps SD15 Kilburn make OCB switch SI.No.NA for 4UP3 pump south Govindpur Colliery (C) PandF
Complete repairing and overhauling of PL-III 1000 GPM 200 Mtr Head 5 Stage M and P make turbine pump 1 no. for pumping having SL No. BCCL/JG/PUMP/1000 GPM/03 of Amal. NT-ST-JG OCP Under Lodna Area.
1) Shifting of Golepahari pump for the purpose of mine dewatering and repairing of damaged pipeline near DDU ( 2) Shifting of 8 inch dia pipeline and pump for dewatering for mining activity at Golepahari sump, AADOCM of Dhori Area for six month
Alteration , remaking and fabrication of motor n pump foundation base frame for running 168HP, 550V motor and DSM-6 pump on the existing base frame including repairing of valves of different sizes and providing of tyre coupling at raw water side and
Repairing and overhauling of 1000 GPM Pump make Mather and Platt CME 6x8, Head 80m, Sl. No. 8131396/10 (Local Sl. No. PND/EnM/Pump/100/02) installed at Old Sarna Patch/Hospital patch engaged for dewatering of mine under under Purnadih Project
Repairing of 03 Nos. Induction motor (A) 3.3KV, grade, 335HP, 1480 RPM, Crompton greaves make induction motor attahed with 1000 GPM pump installed at 3P Quarry (B) 435 HP, 3.3 KV, grade, 1485 RPM, GEC make induction motor attached with 1000 GPM pump
Supplying and fixing of 6 inch dia non return valve , sluice valve, tire coupling set, foundation bolt (HT), suction and delivery nipple, suction and delivery bend, coupling guard etc. to start one additional pump of 1000 GPM pump at Tapin North OCP
Repairing of 361-T vertical pump of unit no. 522 (RLB Tail drum) in Hydro Cyclone Section And Repairing and overhauling of pedestal for PSP make HD 12x10 pump of unit no. 672 of return water in Hydro Cyclone Section at Kathara Washery
(A) Repairing of OCB switch of maker, GEC ,400A,550V Si.No.30/1763 at Hadhadiya pump station (B) Repairing of OCB switch of Make GEC, 8-00A,550V Si.No.40/0292 at Hadhadiya Pump Station of new Akashkinaree Colliery under Govindpur Area
(A)for part repairing casting, machining, molding and new making or supply and fixing of spares and parts of 6CHR pluro vane-II multistage pump MnP make 500 GPM 180mtr head stand by pump of 21no.E/L Sawang C incline at Govindpur Project.
A.re organisation of 8 dia pipeline with dismantling and shifting of 2000GPM pump two times for dewatering near main sump patch to outside of the Mine, w.r.t. konar exp.OCP, BnK Area, B.Re organization Extension of 8 dia pipeline and 1000 GPM pump
laying and jointing of 4 inch delivery pipe range, of length 900 m of M.S 10inch pipe from Hired zpatch-H Pump station to Hadhadiya pump station via cliff and beside of STG DECO campus of new Akashkinaree Colliery under Govindpur Area
Supplying and fixing of 6 inch dia. Non return valve, sluice valve, tire coupling set, foundation bolt (HT), suction and delivery nipple, suction and delivery bend, coupling guard etc. to start one additional pump of 1000 GPM pump at Jharkhand OCP, H
Onsite electrical repair and maintenance of three (03) nos. Circuit breaker switchgears OCB type 3.3KV grade, 400 Amps engaged for control of various feeders i) PNM no. 71 currently idle, ii) PNM no. 56 for pump feeder at DD mines pump station
Repair and replacement of damaged delivery pipeline of 6 inch dia for DSM VI pump along with making of new base plate and installation of pump for domestic water supply near shiv mandir of KSP phase II wrt konar Exp. OCP, BnK Area
Fabrication of Suction and delivery pipelines, matching, moving flange and nipple etc for installation of 2000GPM Flow more pump and 1000GPM 150 mtr head of 3 CHR pump of Mand P make for dewatering of mine water at Karma project under Kuju Area.
(1) 2000 GPM AMPL pump and 10UPH6 6000 GPM pump installation with delivery range diversion in DECO east new coal face (2) 6UPH8 - 2000 GPM and 10UPH4, 4000 GPM installation at Dragline bottom side with delivery diversion coverred W/L in crasin mansoo
(A)Complete Repairing of Rotating unit of 10 UPH8 and 4000 GPM 150 Mtrs Head Kirloskar Make Pump Local Id. No.JG/ Pump/400GPM/01 and Sl.Noo. 1734421003 . (B) Complete Repairing of Rotating unit of 10 UPH8 and 4000 GPM 150 Mtrs Head
Complete repairing and converting 5 stage to 6 stage and fitting of pump of MAke Mather and Platt, 6 stage , PV-II, 180m head , 550GPM, SI.No.NAKC/Pump/PV-II/06 of UG mine 2 seam of new Akashkinaree colliery of Govindpur Area
Supplying and fixing of 6 inch dia. non return valve, sluice valve, tire coupling set, foundation bolt (HT), suction and delivery nipple, suction and delivery bend, coupling guard etc. to start one additional pump of 1000 GPM pump at Jharkhand OCP, H
Fabrication of Pontoon size 21 ft x 3 ft Support Structure for suction and delivery, cutting of companion flange, fabrication of reducer, bend and short pieces, shed making for pump and motor and installation of pump and motor including suction and d
Laying of 8 dia pipe line for providing delivery range of pump at BKB old sump 2) Installation of pump over the Skid with provision of suction delivery and recovery of pipe and cable at quarry 2 sump under Ask OCP,PPR Area.
150 H.P. MOTOR AND PUMP TAKING DOWN FROM SURFACE TO 2 SEAM INCLINE U/G PUMPING SITE 34L DIP AND ONE 150 H.P. MOTOR AND PUMP TAKING OUT FROM 2 SAM INCINE U/G PUMPING SITE TO SURFACE AT AKWMC UNDER KATRAS AREA