Loading…
Loading…
13,263 results • Best match
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S- 9301-1990 with latest amendment
REPAIRING OF PV-II TURBINE PUMP SL.NO.BCCL/KATRAS/AWS/P V-II/P2 AT AREA WORKSHOP, KCC UNER KATRAS AREA
Repairing and Maintenance of 25 Nos. Hand Pump, Changing of damaged Pipe and accessories at different place of NT-ST
Repairing and overhauling of 2000 GPM Make-type RKB250 -46K, 3 stage Sl. No. 12972150005 pump installed at Kathara Colliery
Repairing and Maintenance of Jet pump accessories at Sector-II, III and different places of NT-ST under Lodna Area
Complete repairing and reconditioning of pump no 02 6Up3 Kirloskar make of water filter plant Sudamdih under ASP Shaft Colliery.
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S. 9301-1990 with latest amendment.
Provision of Garland drain, Provision of pump shed and float controller under monsoon preparation works under Gidi-C, Argada Area.
Making of L bend and T bend nipple and installation of 2000 GPM pump of under KDH OCP, NK Area.
Provision of deep tube well, Hand Pump & water Tap at KSHR, CBH, DSME, PSB, SMND, HRE & YDD under ADEN/GJD.
Repairing of 02 Set (4 Nos.) C.I. Coupling for Operation of Mine Pump and motor under Dakra Project, NK Area.
Complete repairing and maintenance of DSm-3 pump ,Kirlosker make for water supply at Kurpaniya shiv mandir under ,Bokaro colliery
Complete repairing of 6 stage 600 GPM Make MnP pump Sl. No BH N MnP 02 of Bhowra North Colliery
Repairing of iron Max make, 1000GPM, 100Mtr head Pump SI no. P1, installed at Patratu water works, Sayal-D Project.
Repairing of 400Amps GEC Make 550 Volt OCB with Busbar SL No 250 Controlling of Old Quarry Pump of RCOP
Repairing of two nos. single stage VT pump at Loading section of Madhuban Coal Washery under Block-II Area, BCCL.
Complete repairing of DSM 65 by 32A 22KW Pump of Kirloskar Make of Parbatpur Central Coal Mine E. J. Area.
Complete repairing and overhauling of 2000GPM pump, 150 meter head, 3CHR, Make MnP in respect of Karo OCP, BnK Area.
Diversion of Pipe line for water supply from VT pump to Kalimati Reservoir of Chapapur-II Colliery under Mugma Area.
Complete repairing and fitting of 2000 GPM, 8inch X 8inch size, MandP make H.T. Pump of NAKC under Govindpur Area.
DIVERSION OF FEEDER IV 6.6 KV OVER HEAD LINE FROM OB DUMP TO AMPL PUMP OF AKWMC UNDER KATRAS AREA
Complete repairing of RMQ-4 stage Pump (125x300) of Moonidih Mine, WJ Area.Qty.-01 No. (Sl.No.-WS/RMQ-4/01)
Repairing and re-conditioning at bearing assly. for PSP pump of unit no. 274(B) main plant of Kedla Washery
Repair and Maintenance of 316 Nos Hand Pump in Sindri Ward No. 34 to 55 under Dhanbad Municipal Corporation, Dhanbad
Laying of dia 200 mm pipe line for 2000 GPM pump for mine dewatering of Karma OCP under Kuju Area.
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S- 9301-1990 with latest amendment
Repair and Maintenance of 161 Nos Hand Pump in Dhanbad Ward No. 27 to 33 under Dhanbad Municipal Corporation, Dhanbad
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S- 9301-1990 with latest amendment
8(EIGHT) NOS FANS, REWINDING AND REPAIRING , 1 H.P. TULLU PUMP ,1050 VA INVATOR AND ELECTRICAL WIRING OF KATRAS AREA
DIVERSION OF FEEDER 1 3.3 KV OVER HEAD LINE FROM 79 MACHINE TO AMPL PUMP OF AKWMC UNDER KATRAS AREA
Providing of portable shed for pump operator and electrical switch gears at Pumping station of Rajpura OCP under Mugma Area.
Repairing of roof with tarfelt of Gaslitand filter plant pump room, mining Rest Shelter Gaslitand, survey office under Katras Area
Fabrication and making of 5nos tapper and 3no of short piece in old Ghutway patch3 pump face at Damoda Colliery
Complete rewinding and rotor repairing of 180HP, 550V Motor utilised for operation of Turbine Pump at Phularitand underground, AMP Colliery
Repairing of roto make 5 stage ,120 HP GPM -500 size 5x5 inch SI.No.79 pump of area unit workshop
Transporting and laying of 8 inch Ms pipe for installation of split casing pump at J-Patch of ADI Colliery
Making 05 no. foundation for installation of pump near outsource site and departmental sump at Kabribad mine of Giridih Project
Complete repairing and fitting of 40HP , 2 stage pump polish make SI.No AWS/12 of Area Workshop under Govindpur Area
Making, fabrication and fitting of M.S. Foot Valve Size 12 inch for 4000GPM pump of A.S.P. Colliery under E.J. Area.
Partial Repairing of 4 Stage 2000 GPM FLOW MORE Make Pump at NT-ST OCP at Site under Lodna Area.
LEAKAGE REPAIR REPAIRING OF NRV,SLUICE VALVE 06inch(03 NOS.)8inch(03 NOS.) 10inch(03 NOS.) MAINTENANCE OF ALL PUMP
Supply of Spare parts of deep well hand pump India Mark-II Conforming to I.S- 9301-1990 with latest amendment
Installation of Hand Pump near Santosh Ganjhu in Tumang Panchyat under CSR Scheme 2020-21 under GM Unit, NK Area.
Manufacturing of complete rotating unit of 75 HP pump No.2 BEACON WEIR Make of JWTP under Block-II Area
Complete repairing and fitting of pump of Make MAMC, 2 stage, 90m head, 700Gpm of kharkharee colliery of govindpur Area
REPAIRING OF 6UP-3 KIRLOSKAR PUMP OF JOGIDIH COLLIERY UNDER GOVINDPUR AREA III. SI NO.- JC/6UP-3/P/23
Repairing of damaged platform of grease pump side and cracked platform near engine side of Shovel No. G10120 BE-1000
REPAIRING OF COUPLING GEAR AND PINION OF STEERING HYDRAULIC PUMP OF CAT 773E DUMPER SL NO 1102 OF KDH PROJECT
Pump shifting, pipeline shifting, breakdown rectification work at 1T patch and Box cut-II under ABOCP mine Block-II Area
Fabrication and casting of steel coupling for Flowmore 2000 GPM pump and Motor of ABOCP Mine under Block-II Area