Loading…
Loading…
13,263 results • Best match
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. RRP Connecting rod C.I Cylinder (wherever required) etc. in Rural Area within the jurisdiction of D.W and S. Div. No. 2, Dumka for the year 2026-27 (RRP-RAM-1)
Day to day repair and maintenance of 3.3KV OHTL and 440V OHTL by dismantling, erection, extension for supplying power to HEMMs, Mine dewatering pumps and lighting installations for one year as and when required as per the advancement of mine under Da
Dismantling, laying, pipe cutting, jointing (welding) etc. of 6 inch dia, 8 inch dia and 10 inch dia pipeline for the shifting of pumps at Main Sump and Jehlitand Sump as and when required for one year under KDH OCP, NK Area
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. RRP Connecting rod C.I Cylinder (wherever required) etc. in Rural Area within the jurisdiction of D.W and S. Div. No. 2, Dumka for the year 2026-27 (RRP-JAR-2)
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. RRP Connecting rod C.I Cylinder (wherever required) etc. in Rural Area within the jurisdiction of D.W and S. Div. No. 2, Dumka for the year 2026-27 (RRP-JAR-1)
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. RRP Connecting rod C.I Cylinder (wherever required) etc. in Rural Area within the jurisdiction of D.W and S. Div. No. 2, Dumka for the year 2026-27 (RRP-JAM-2)
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. RRP Connecting rod C.I Cylinder (wherever required) etc. in Rural Area within the jurisdiction of D.W and S. Div. No. 2, Dumka for the year 2026-27 (RRP-SAR-1)
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. RRP Connecting rod C.I Cylinder (wherever required) etc. in Rural Area within the jurisdiction of D.W and S. Div. No. 2, Dumka for the year 2026-27 (RRP-SAR-2)
Fabrication of middle chamber (including partition plate and guide vanes) for the 600 GPM and 150m/180m MnP-make pump at SB workshop under Sijua Area
Repairing and maintenance of coolant system and cooling pump, wiring and piping repair of lathe and milling machines at RRS Tapin Hazaribagh area
150 H.P. MOTOR BRINGING FROM KESHALPUR COLLIERY TO WMC NEAR CHP SAME 150 HP MOTOR AND PUMP TRANSPORTING TO 2 SEAM INCLINE AND LOWERING TO U/G 35 LEVEL BY MANUALLY AND INSTALLATION AND OTHER 150 H.P. MOTOR AND PUMP TAKING OUT TO SURFACE 150 MOTOR N
Diversion including extension of 10 inch dia 120 Mtr pipe near Jeenagora railway crossing of 8 No Coal depot and interchaning of 80 Mtr pipe delivery range of No.-1 4000 GPM pump with No.-3 4000 Gpm pump at Jeenagora Quarry Amal. NT-ST-Jeenagora
Complete repairing, full overhauling maintenance with spares of two Nos of kirlosker make split casing DSM-4( R)M pump No-01 and DSM-4(M) pump No-02 as stand by assembly installed at Sharda Colony and Kalyani river site for water supply under SDOCM
A) Dismantling, Erection, Breakdown repairing damaged by blasting bolder power supply DM-3/521, DM-3/522, 4000 GPM pump Jocp of ABOCP. (B) Erection, Breakdown repairing of 220V L.T O/H line lighting for JOCP face 4000 GPM pump and haul road JOCP of A
Shifting of one pump of 1000 GPM, make Kirloskar Oil Engines oil engines Itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Lowering of 02nos of HT 4000gpm pump of Muraidih Jharna sump due to decreasing of water level and diversion of 10inch by 8inch dia MS pipe line of 4000gpm pump supplying water to SOCP filter plant near view point due to safety purpose of Muraidih und
Complete repairing full overhauling maintenance with spares of two nos of Kirloskar make split casing DSM-4 (R)M pump No 02 and DSM -4(M) pump No-1 as stand by assembly installed at Sharda Colony and Kalyani river site for water supply under SDOCM
A)Fabrication of bed plate structure for operation of 2000 GPM, Make- Flowmore pump at face sump under Dakra Project. B) Providing and fixing of CI N.R Valve 8 INC Dia for installation of 2000 GPM flowmore pump at coal face under Dakra Project C)Prov
A. re-organization/Extention of 8inch dia pipelines for shifting of 1000 GPM pump at new location for dewatering of Mines Sump to outside of the Mine (BOQ 1-13), B. laying of 8inch dia pipelines and installation of one 2000GPM pump at new location f
A. Complete Repairing and reconditioning of 500 GPM 150Mtr Head 4 stage pump, Model IPBT 80 make MnP 100 -150 Sl No Missing B. Complete Repairing and reconditioning of 500 GPM, 100 Mtr Head 1 stage pump make SDC Sl No Missing of KUGP Hazaribagh A
Onsite repairing cum overhauling and maintenance of One(01) no. of 500 GPM, DSM-4 pump assembly WNP, make-Kirloskar having punch sl. No. BnK/ IWSP/ DSM4/ DS/01 and One(01) no. of 800GPM pump assembly WNP, make-Beacon Weir having punch sl. No. BnK/ IW
Shifting, diversion cum extension of 6 inch dia G.I. pipes required for shifting of 500 G.P.M. Pump and 1000 GPM pump at the Coal Face and main sump, due to displacement of water accumulation area and dismantling of one range 6inch and 4 inch dia pip
(A) Diversion of 6.6KV SF No-1 near keshargarh school power supply Jocp 4000 GPM pump (B) Breakdown, repairing of 6.6KV D/L feeder power supply 3200 GPM pump Jocp patch (C) Erection of 6.6 KV benidih feeder power supply DM-3/522 (D) Breakdown, repair
Repairing /overhauling of (A). 6 CHR Pump 150HP, 180 Mtr. Head, 500 GPM, Sl.No.-19013910, make-Flowmore Ltd for water supply at filter-bed (B). Multi stage pump, 500 GPM, 180 Mtr. head, make Bareja Sl. No. 12111018 for water supply at filter-bed of G
shifting of 2nd pump of 1000 GPM, Make - Kirloskar oil engines Itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also Laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive
complete Repairing overhauling of 500 GPM Pump 5 Stage RKB/ MLA of KUGP Make KBL Head 150 meter Sl No.29V2AB670/0040 and B) 500 GPM Pump 4 Stage RKB. MLA of KUGP Make KBL Head 150 meter LOCAL Sl No.KUGP.RKB003 at KUGP under Hazaribagh Area.
Making nipple delivery band L-type pump shed, lifting arm and other miscellaneous work in mine at Ashok OCP under PPR Area.
Repairing cleaning and painting of rest shelter for Pump operators in quarry 1 and quarry 2 under Piparwar Project, Piparwar Area.
Complete Repairing/ Overhauling of Make-Max Flow Pump, 600G.P.M,6Stage,Sl.No.BH(S)/Max Flow/0463 of Water Treatment Plant
REPAIRING OF GEAR AND PINION OF STEERING AND HOISTING HYDRAULIC PUMP OF BH85 DUMPER SL. NO. 8356 OF KDH PROJECT
Repairing, New Making of end cover Dala (D.E) and repairing of Rotor bar of 132kW induction Motor, volts- 440, RPM 1480, Make Marathon, Sl. No. T3444249 to be installed (new installation) at Konar riverside New Pump house under Kathara Collie
Cleaning and Sweeping of Control Room Building G - 1, including of cleaning of bathroom etc., Fire Fighting Pump House, Parking shed area, Store Shed and along its premises help of two (02) nos. of unskilled sweeper and three (03) nos. Unskilled
253060581030, 253060481076, 253060661035, 253060601034, 253060511035, 253060521002, 253060441003, 253060561002, 253060631003, 253060631015, 253060601038
253091060010, 253091060015, 253091060019, 253091060013, 253091060020
253054150001, 253054150023, 253054150022, 253054150024, 253054150026, 253054150027, 253054150006, 253054600026, 253054590069, 253054620018, 253054620077, 253054620011, 253054620007, 253054620013, 253054630015, 253054630019, 253054630043, 253054700018, 253054700017, 253054700028, 253054700032, 253054700037, 253054700002, 253054700003, 253054700004, 253054700030, 253054660056, 253054660017, 253054670007, 253054620034, 253054590028, 253054600037, 253054590026, 253054620030, 253054600013, 253054700043, 253054700040 Bid Number ( ) : GEM/2025/B/5799203 Dated : 15-01-2025 Bid Document 1/41
ITEM SL NO 1, ITEM SL NO 2, ITEM SL NO 3, ITEM SL NO 4, ITEM SL NO 5, ITEM SL NO 6, ITEM SL NO 7, ITEM SL NO 8
SHAFT SLEEVE - PART NO - 53.6 - MATERIAL - SS 316, SHAFT SLEEVE - PART NO - 53.43 - MATERIAL - SS 316, SHAFT SLEEVE - PART NO- 53.43 - MATERIAL- AISI 410, SHAFT SLEEVE - PART NO-524 - MATERIAL - AISI 410, SHAFT SLEEVE - PART NO- 53.6 - MATERIAL - AISI 410, SHAFT SLEEVE - PART NO- - 12 - MATERIAL - ASTM A 743 CA15
Unbranded 2 Cylinders Petrol Engine Large Fire Fighting High, Unbranded 2 Cylinders Petrol Engine Large Fire Fighting High Pressure Portable Pump
Repairing of PV-II 4 stage,MnP make Pump of ADI Colliery of Kusunda Area)Asset Book page 48 sl.no.03)
Overhauling, repairing of booster pump sl no. 01 at PS-9 section of madhuban Coal Washery under Block-II Area, BCCL.
Shifting of 8 inch dia pipeline and installation of 2000 GPM pump at 9 seam under ABOCP Mine, Block-II Area
MAKING OF 02 NOS. SHED WITH SITTING ARRANGEMENT (SIZE 10meterX08meterX10 meter) FROM OLD AND SERVICEABLE MATERIALS FOR PUMP OPERATORS AT AKWMC
Complete repairing of 4000GPM, 10UPH-8, KIRLOSKAR make pump no. 40013753 used for dewatering of mine water at Phularitand, AMP Colliery.
Pump shifting pipeline shifting, breakdown rectification work at IT patch and Box cut-II under ABOCP Mine under Block-II Area
Repairing of 200 mtr head Flowmore make 1000GPM pump 200 mtr head Sl No 141220175002 at Damoda Workshop under Barora Area
Installation of Hand Pump at Vinod Bhuiyan House in Lapra Panchyat under CSR Scheme 2020-21 under GM Unit, NK Area.
Complete Repairing of Flow more make pump 5 stage of Moonidih Work Shop, W.J.Area. Sl. No.MND/CWS/Flow more/05stage/01
Repair work of Diesel Fuel Injection Pump and Nozzle Assy. of Hyva Reg.No-JH10AE-0309 of Area Auto Workshop, Kusunda Area
Repairing and Rewinding and Overhauling of 7.5 HP 440 Volts 2900 RPM Summersible Motor and 10 Stage Summersible Pump at Murlinagar
3000 GPM PUMP MAINTENANCE VALVE CHANGING MAIL MAKING AND FITTING OF OCP SUMP EAST SIDE OF WMC, AKWMC, and KATRAS AREA