Loading…
Loading…
13,239 results • Best match
SPL REP TO BLDG NO E-46 AND 44-45/A AT NAMKUM POCKET, PROVN OF 02X BOREWELL INCL PIPE LINE AND ALL CONNECTED WORKS AT OLD ILP AND 01 X BORE WELL WITH SUBMERSIBLE PUMP WITH ACCESSORIES IN UNIT LINE AREA OF 23 INF DOU AT NAMKUM MIL STN UNDER GE RANCHI
Complete repairing rewinding of induction motor 120 KW induction motor RPM 1485 Volt 550 Make Indian SI No. RS 02 55 KW induction motor RPM 1485 Volt 415 Make Indian SI No. CnD Colony Pump House 01 under Kathara Colli
Electrical Wiring, internal and outdoor lighting of pump house line no.01 and 04 at shivpur railway siding and arrangement of power supply to 07 Nos. of RO plant coolers installed at different places of Amrapali OCP under A-C Area
Carriage of accumulated slurry / coal from the surrounding area of fresh water pump house and its approach drains by manual labour including loading unloading and stacking and loading of stacked material to nearby suitable place for a lead less than
AMC for various pipelines rep.,maint. work for IWSS/Filter plant, KT-Bishrampur and other works related to laying,extn and dismantling of different delivery ranges for shifting and installation at Khilawan Dhaura A Block Pond pump house for colonies
(A) Repairing overhauling of old DST 1000 GPM, 150/200 installed at river side pump house with replacement of worn out internal parts and welding grinding, machining of upper lower casing with monor base plate repairing as per required under Kathara
Providing and fixing of 40 Nos .of hoarding boards of (Size 4 X 3) for displaying safety slogans, instructions, pictures etc across Excavation workshop ,MTK room, Manager office ,EnM office ,sub station ,pump house and in some Electric poles beside
Partial electrical repairing of DG set 32.5 KVA 3 phase 415V, Sl.no. HA-494 at G.M. Banglow Asnapani colony and rewinding of 18.5 kw motor 3 phase 415V sl.no. FLD189 make Kirlosker at CandD pump house under G.M. Unit,Kathara
Wiring of Newly built Kitchen Room at Re-creation Club, Sangam Vihar and Repairing and maintenance of electrical wiring and providing of lighting accessories in CCL Guard Room and CISF check post at Sangam Vihar, Pump House and Santri Room
Repair and maintenance of HT line 11 KV destination free location in lieu of the monsoon preparation of domestic overhead line regional Sub-Station to IBM colony and Bandh colony, industrial supply and river side pump house under Kathara Washery
Protection of tower leg at location 91 and 92 of Line 201 and 202 with some miscellaneous civil maintenance work in switch room, pump house MADA valve chamber and water supply works at Putki substation colony under GOMD IV DVC Putki
Installation of flow meters for monitoring, measuring and recording of water drawn from Damodar river in river side intake pipelines at raw water side pump house n installation of pressure gauges in delivery pipelines of Kargali n Bokaro water supply
Dismantling and Erection of 440/220 Volts Overhead Lighting Line of Jagankocha Basti having Approx. length 1680 Mtrs and Dismantling of 550 Volts Durga Mandir Pump House O/H Line of Bhulan Bararee Having Approx. Lenght 1080 Mtrs at Bararee Colliery
Replacement of low height poles, old , rusted and damaged OHL structure, erection of cradle guards along with conversion of two wire into four wire and providing,fixing of Lightining Arrestor in LTOHL existing between Pump House(Intake No.2)under PND
Carriage of already accumulated slurry coal from the back side of light vehicle workshop drain to new culvert ner Bhareja Pump House by manual labour including loading unloading and stacking and loading of stacked material to nearby belt / chute/ su
Repair and maintenance of H.T line 11KV destination free location in lieu of the monsoon preparation of domestic overhead line 2 No. Sub-Station to IBM Colony and Bandh Colony, industrial supply and river side pump house under Kathara Washery
Complete repairing and overhauling with wiring of 11KV HT OCB, GEC Make, 400AMP, KAD type, SL.No. M-2422 for controlling main power supply to 1000 KVA transformer installed at 35 No Pump House Substation of Bhimkanali Township under Block-II Area
Repair and maintenance of 11KV/550Volt overhead line and erection of stay sets, insulators, pole cement concreting, pole painting etc. and providing of 11 KV, 800 A GOAB Switch near River Side Pump House under colony maintenance (9.0) under Kathara C
Detailed survey DD RCC Intake Well-Cum-Pump House RCC Gang Way 5.50 MLD Capacity WTP 04 Nos ESR Staff Quarter RW CW CPW AR HC and 05 Yr O and M Jirwakhurd and Adjoining VWSSS RPWSS On Turnkey Basis
Dismantling / dislocating, shifting and laying of one No. PVC insulated PVC sheathed armored power cable size 240 Sq.mm , 1.1KV grade on the O/H cable trench from ETP Plants to H Pole near light vehicle and pump house of Rajrappa Washery
Detailed survey designing and drawing Construction of Intake Well Pump house Gangway WTP 3 Nos ESR Staff Quarter Compound wall and five year OM etc all complete for Khutta Nawadih Angar Donaiya RPWSS under DWS Div Jhumritelaiya on Turn Key Basis
Entire Plumbing and Sanitary work for the service buildings at Old & new filter House, river side pump house including sanitary & Plumbing work of zone No.1 to 4 under SSE/W/WS/KPA. i) Sanitary & Plumbing Work in CPWD DSR 2021;
ARC of routine/preventive/breakdown maintenance of entire equipment of BOP section viz Cooling Towers, CW pumps, WTP,ETP,PT plant, DM plant and Intake/Reservoir Pump House
Please refer to the NIT document
Procurement of Hydrazine/NaOH and Ammonia dosing pumps for NTPC NorthKaranpura TPP
Repair, Fabrication and erection of 256 vertical pump delivery line damaged portion flange, bends diverting line to heavy media and dilute media pumps with replacement of controlling valve flanges in HMS Section of Kathara Washery
Shifting 4000GPM Pump 3rd patchsump from damaged pontoon and installation groundlevel and maintenance abovepump andpipe line, recovery of 10inch 8inch dia pipe old deliveryrange 3rdpatch sump, maintenance of 03No pumps and other work of AMPC.
Dismantling and changing of damaged base structures of slurry pumps 655-1,2,3 and sump pump along with their motor bases and their proper alignment at (-3) M floor of Washery Building of Moonidih Coal Washery.
Dismantlingoverhaulinrepairinassemblinerection, alignmenttesting of recirculating n fresh water 4 Nos. Metso Pumps Model HM 300 250 Sl 100119901 1001106909 cap500 M3/H H-45 M n 6 No DSM5DSM4 n Hyderabadi fresh waterpumpsKirloskarmakeverticalpump
Complete repairing/reconditioning of two 500GPM pumps. 01 no 5CHR, 125/100 MnP make and 01 no DSM 12/40, Kirlosker make pumps at Topa Project under Kuju Area
Maintenance, operation of VT pumps-motor 02 nos, 250 hp and security of pumping house and associated substation in all three shift including routine maintenance of pumps and motors
Maintenance, operation of VT pumps-motor 02 nos, 250 hp and security of pumping house and associated substation in all three shift including routine maintenance of pumps and motors
Maintenance, operation of VT pumps-motor 02 nos, 250 hp and security of pumping house and associated substation in all three shift including routine maintenance of pumps and motors
Providing, fixing, installation and testing of ICDP and ICTP switches at DAM main control, mines pumps, barwabeda pumps, offices, store and lighting control w.r.t. Konar exp OCP, BnK Area
Repairing of 1. Air Compressor set model TC 1500/3 Cylinder and TC 500/2 cylinder ELGI make 02nos., 2.)Air Power Pneumatic grease pump set ELGI make 02 nos. and 3. Rewinding of Welding Machine AC/arc/440 V. /450 amp. 02 nos. of Dakra OCP, NK Area.
Carrying laying and joining of 6 inch dia MS Pipe. A delivery range of Kujama Quarry sump to G-Patch (Approx.-1200 Mtrs) full length pipes 200 Nos. Bends 14 Nos. and Short piece pipe 10 Nos. and installation of 1000 GPM pump set for dewatering work o
A) Dismantling,Erection, B.D. repairing of 6.6 KV D/L Feeder power supply drill M/c. shovel M/c. and motor pump of JOCP, B) Maintenance of 11KV F. No. 3 near coal dump, JOCP. C) B.D. repairing of 440 V LT O/H line 5 wire system power supply of Drill
MOEI and fans, RMO pump sets, RMO DG set, for CPWD office building RCD and Guest House at Hinoo, Ranchi during 2023-24. (SH: Providing clerk cum office attendant for multidiscipline/multitasking official works in O/o EE(E)-II and AE(E)-II office, Ranchi) Subwork/Packages: Providing clerk cum office attendant for multidiscipline/multitasking official works in O/o EE(E)-II and O/o AE(E)-II office, Ranchi
INSTALLATION OF SIX NO HAND PUMPS IN DHADHU PANCHAYAT LATEHAR UNDER CSR
complete repairing, overhauling, maintenance with spares of three nos 500 GPM pumps
Complete Repairing of 4UP-3 Pumps of Filter Plant under Kuya Colliery.
Fabrication of 02 nos of base for 2000gpm pumps running under KOCP
Supply of Vertical Pumps 36 inch n 48 inch for Rajrappa Washery.
Replacement of pipes of 603 and 564 pumps section of Rajrappa Washery
Supply of Eaton Vickers make Hydraulic Pumps, Control Valve and its spares
Repairing and maintenance of hand pumps at Budora Colony under Phularitand Colliery
Supply of Spare parts of Deep Well Hand Pumps India Mark-II
R/M of pumps in r/o of AADOCM Siding, Dhori Area
I-13114. Procurement of SPARES FOR CLP AND TP PUMPS FOR MOSABONI
Repairing of motor rotor shaft and pumps long bush and bush bearing