Loading…
Loading…
14,275 results • Best match
Taking out Handpump Providing Single phase motor pump Jointing and laying of Pipe line , Provding Tap connection and Construction of Platform in 38 School and Anganwadi for Water supply arrangement in Various school in Block GHODADONGARI Dist Betul
Drilling of 175 mm dia tube well with M.S. Casing Pipe Motor Pump Installation with riser pipe and tee connection/Milan work complete and etc. work 02 nosa at site ward no. 54 file NO. 193/19x9/1
Estimate of Drilling of 175 mm dia Tube well with MS Casing pipe Motor Pump Installation with Riser Pipe and Tee Conection/Milan Work Complete with labor and Material of ward No. 20 file No. 250/25X9/1
Taking out Handpump Providing Single phase motor pump Jointing and laying of Pipe line Provding Tap connection and Construction of Platform with Electric connection in 200 School and Anganwadi for Ws arrangement in various school in BLOCK BHIMPUR
Taking out Handpump , Providing Single phase motor pump , Jointing and laying of Pipe line , Provding Tap connection and Construction of Platform in 38 Nos. School and Anganwadi for Water supply arrangement in Various school in Block PRABHAT PATTAN
New Motor Pump 8000 LPM 60 Meter Head 125 KW 170 HP Suction Delivery not less than 200X150 Bronze Impeller Couple Base Frame including supply installation and testing complete work as shown in the estimate sheet and conditions
Transportation of safety materials and EnM materials like pit props, cogs, wooden sleeper, steaming materials, motor, pump gas cylinder, welding machine, fabricated, and SDL and UDM parts etc. in UG at Umaria Colliery, Umaria Sub Area, Johilla Area
Balance work for Piped Water Supply Scheme under Jal Jeevan Mission at Village Garhi Padariya Block Panna district Panna based on Tube well including installation of electric submersible water motor pump and distribution pipe line system, household t
Taking out Handpump Providing Single phase motor pump ointing and laying of Pipe line Provding Tap connection and Construction of Platform with Electric connection in 200 School and Anganwadi for Ws arrangement in various school in BLOCK SHAHPUR
Construction of Piped Water Supply at Village Doke Block WARASEONI District Balaghat based on Tube well including installation of electric submersible centrifugal water motor pump construction of 20 KL R.C.C. Sump well, construction of 75 KL RCC OHT
Providing Single phase motor pump Jointing and laying of Pipe line Provding Tap connection and Construction of Platform with Electric connection in 200 No School and Anganwadi for Water supply arrangement in various school in Block PRABHAT PATTAN
Taking out Handpump Providing Single phase motor pump Jointing and laying of Pipe line Provding Tap connection and Construction of Platform in 75 Nos. School and Anganwadi for Water supply arrangement in Various villages in Block PRABHAT PATTAN
PROVN OF CERTAIN MINOR WORKS MW 02 22 TO 26 CERTAIN REVENUE WORKS REV 04 TO 06 08 01 AND SPECIAL REPAIR TO PUMP MOTOR AGAINST BER SRW INSTALATION 01 AT SI LINES AND BAIRAGARH UNDER GE BHOPAL
Providing and Fixing of gear box 1No Repairing and alignment of pedals bridge all items equipped in Clariflocculator at filter plant Nayagaon and Providing and Fixing of 60 HP booster pump spare parts at Nayagaon and Narmada pump house Lalpur MPPMCL
Operation of pumps, regulation of control valves of pumps installed and running maintenance of pumps and pipe line installed for dewatering of mine at Block-B project
Operation of pumps, regulation of control valves of pumps installed and running maintenance of pumps and pipe line installed for dewatering of mine at Block-B project
Operation of pumps, regulation of control valves of pumps installed and running maintenance of pumps and pipe line installed for dewatering of mine at Block-B project.
MOEI and Fans sub station Equipment compound Lights and water supply Pump sets DG sets and Firefighting system at ICMR Residential and Non- Residential Complex at Jabalpur for the year 2026-27 SH- Providing Accfessories for 33 KV Substation Subwork/Packages: Providing Accessories for 33 KV Substation
MOEI AND FANS SUB STATION EQUIPMENT COMPOUND LIGHT AND WATER SUPPLY PUMP SET DG SETS AND FIRE FIGHTING SYSTEM AT ICMR RESIDENTIAL AND NON RESIDENTIAL COMPLEX AT JABALPUR FOR THE YEAR 2024-25 Subwork/Packages: MISCELLANEOUS WORK
MOEI and fans, street light i/c RMO pump set, DG set, Substation and ACs at CGO Building, Nirman Sadan, Bhopal. SH:- Hiring of Taxi Vehicle for AEE-1 office for the year 2022-23.
MOEI & fans i/c street light RMO of Pump set, RMO DG set, Sub Station and AC at Nirman Sadan, CGO building, Bhopal. |(SH:- Servicing and repairing of glow sign board at CGO Nirman Sadan).
MOEI and fans, street light i/c RMO pump set, DG set, Sub Station at CGO building Nirman Sadan, Bhopal. (SH:- Providing split AC and networking switch and servicing of existing split and cassette ACs).
MOEI and fans i/c street lighting RMO Pump set, RMO DG set, Sub station and ACs at AG Office building, Bhopal during the year 2022-23. SH: Comprehensive maintenance of RO plant & Water Coolers.
MOEI and Fans, Street Lighting i/c RMO Pump set, Sub Station, DG set at GPRA Colony, Bhopal. (SH:- Decoration of miniature lighting for Independence Day (15 August, 2025) on CBI, GSI & GPRA Bldg., Bhopal).
MOEI & Fans i/c Street Light RMO Pump set, RMO DG set, Sub Station & AC at Nirman Sadan, CGO Bldg., Bhopal. (SH: - SITC of IP based telephone and LED Light fittings at CGO Building, Bhopal).
Portable Pump Set for Fire Fighting Conforming To IS 942? (Q3) MSE Relaxation for Years Of Experience Yes | Partial | Experience - 3 year (s) Startup Relaxation for Years Of Experience Yes | Partial | Experience - 3 year (s)
Portable Pump Set for Fire Fighting Conforming To IS 942? (Q3) MSE Relaxation for Years Of Experience Yes | Partial | Experience - 3 year (s) Startup Relaxation for Years Of Experience Yes | Partial | Experience - 3 year (s)
FOR THE WORK OF REPAIR OF C.I. SLUICE VALVE 21/2, 3, 4 n 6 DIA FOR WATER SUPPLY ARRANGEMENT AT PUMP HOUSE NO. 1 n 2 BARGI NAGAR
Shri Singaji Thermal Power Project Stage-I 2x600 MWKhandwa- Construction of pakka drain, sump and pump house etc. to control seepage in the adjoining agriculture fields of ash dyke.
Running Maintenance of EI and Fans Pump Set Street Light Sub Station and DG Set at the Premises of IISS Nabibagh Bhopal SH :- Installation of VCB Panel and Associate HT Works Subwork/Packages: Installation of VCB Panels and Associate HT works
RUNNING MAINTENANCE OF EI AND FANS COMPOUND LIGHT AND WATER SUPPLY PUMP SET AND DG SET AT INCOME TAX RESIDENTIAL AND NON RESIDETIAL COMPLEX AT REWA FOR THE YEAR 2025-26 Subwork/Packages: OPERATION AND MAINTENANCE OF E/M SERVICES
RUNNING MAINTENANCE OF EI AND FANS COMPOUND LIGHTS AND WATER SUPPLY PUMP SET AND DG SET AT INCOME TAX RESIDENTIAL AND NON RESIDENTIAL COMPLEX AT KATNI FOR THE YEAR 2025-26 Subwork/Packages: OPERATION AND MAINTENACE OF E/M SERVICES
Running maintenance operation of EI and fans compound light water supply pump set at SIB Resdl and Non Resdl Complex at Civil line Jabalpur, Rewa, Balaghat for the year 2022-23 Subwork/Packages: Operation and Maintenance of E/M Services
PWSS under JJM at Village karhaiaya, salaiay, khairy Block Chavarpatha Distt. Narsinghpur based on Tube Well submersible motor pump, laying and jointing distribution pipe line,Const. OHT, household tap connect., 90 Days trial run
Retrofitting of Piped Water Supply Scheme under Jal Jeevan Mission at Village Badarkha Block Pichhore Distt. Shivpuri including installation of electric submersible motor pump, laying, jointing distribution pipe line system, household tap conn. etc
Retrofitting Of PWSS under JJM at Village Pipariya Barodiya, Barhachota , Gowargaon , Block Kareli, Dist.Narsinghpur based on Tube Well submersible motor pump, laying and jointing distribution pipe line, household tap connect,90 Days trial run
Retrofitting Of PWSS under JJM at Village Bhama, Bikor Block Chawarpatha, Dist. Narsinghpur based on Tube Well submersible motor pump, laying and jointing distribution pipe line, household tap connect., 90 Days of trial run
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 NAHARA 2 PARSONA Block BHIND Distt. BHIND based on Tube.Well including installation of electric submersible motor pump
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 IMLAHA 2 NOUDHA Block ROUN Distt. BHIND based on Tube.Well including installation of electric submersible motor pump,
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 DANG 2 CHANDHARA Block GOHAD Distt. BHIND based on Tube.Well including installation of electric submersible motor pump
Retrofitting Of PWSS under JJM at Village Kashikhairi, Bandha Block Chawarpatha, Dist. Narsinghpur based on Tube Well submersible motor pump, laying and jointing distribution pipe line, household tap connect., 90 Days of trial run
Retrofitting Of PWSS under JJM at Village Iswarpur , Dobhi Block Chawarpatha, Dist. Narsinghpur based on Tube Well submersible motor pump, laying and jointing distribution pipe line, household tap connect., 90 Days of trial run
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 KHARIKA 2 NIWARI Block ATER Distt. BHIND based on Tube.Well including installation of electric submersible motor pump,
Retrofitting of piped Water Supply Scheme Under Jal Jeevan Mision at Village SETHAN, Gram Panchayat DETPON, Block SAIKHEDA , Distt. Narsinghpur MP based on Tube well including imsatallation of electric submersible motor pump ,laying jointi
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 AAROLI 2 KHERA Block MEHGAON Distt. BHIND based on Tube.Well including installation of electric submersible motor pump
Construction and Execution of Retrofitted Piped Water Supply Scheme under Jal Jeevan Mission at Village Naugai, Ratanpurwa, Sailwar, Naikahwa, Kulakwar, Block Chitrangi, Distt. Singrauli based on Tube Well including of electric submersible Motor Pump
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 BADERA 2 CHEKURI Block GOHAD Distt. BHIND based on Tube.Well including installation of electric submersible motor pump
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 AKON 2 JAMSARA Block ATER Distt. BHIND based on Tube.Well including installation of electric submersible motor pump,
Construction and Execution of Retrofitted Piped Water Supply Scheme under Jal Jeevan Mission at Village Dauadol, Bhaisahund, Shivgarh, Charki, Nayatola, Block Deosar, Distt. Singrauli based on Tube Well including of electric submersible Motor Pump
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 KOT 2 PAROSA Block MEHGAON Distt. BHIND based on Tube.Well including installation of electric submersible motor pump,