Loading…
Loading…
4,204 results • Best match
MANSOON ACTION PLAN 2018 S.NO.16 OF 109 REMOVAL OF SILT WET SILT IN EXISTING OF OUT FALL DRAIN IN DRM OFFICE AND THROUGH RAILWAY TRACK IN DIV. NO. 31
Custom Bid for Services - Upper Gear passenger amenity attention works in railway coaches at Visakhapatnam Coaching Depot during primary and secondary maintenance of coaches for a period of 02 years
Construction of ROB At Yellamanchili in lieu of L.C.No. 475-A at Railway Km 723/8-10 at Km 332/8 of old NH5 road in Visakhapatnam district (Balance Work).
Construction of CC Road from the Temple to the Railway Gate at Lankapatnam in ward no.01 in Vizianagaram Municipal Corporation Under 14th FINANCE Funds 2019-20. (Est.cost : 5.00 Lakhs).
Providing BT Road to Old RR peta main road from Yarrakatta Junction to Railway gate at 49th division (Developmental works for improvement of Civic amenities.Rs.100 Cr Grant).(3rd call)
Providing CC Road from Ele. Pole No: SS/88/6A to D.No: 31-6 at Enugupalem Road Railway gate in Railpeta in 10th ward in Vinukonda Municipality. (Under SDS Grant)
Providing New Center Lighting with Erection of New Poles at M.G Road Anjuman Street Circle to Railway Community Hall Pole No F/3/2-1 to SB/10 under BPS
De-silting of outfall drain to East side of IRR from R and B Culvert to 33 vents and west side of IRR from Nunna road to Gunadala railway track
MANSOON ACTION PLAN 2018 S.NO.16 OF 109 REMOVAL OF SILT WET SILT IN EXISTING OF OUT FALL DRAIN IN DRM OFFICE AND THROUGH RAILWAY TRACK IN DIV. NO. 31
Providing CC Road from Krishna Bhavani hospital 1st and 2nd cross street (Near Vattam Ganesh House) gorintada canal junction to west side railway boundary in 23rd ward in Palacole Municipality.
Re-routing of existing chakali gedda (kutcha drain) by RCC drain towards Navy compound wall in view of providing railway siding in vacant land west of ESSAR near RCL junction
Removal of wet silt from Railway new colony circle to Rajamandry Slik house SW drain in ward no.41, Zone-V(A), GVMC.(Reserved for STSC Vaddera /SAGARA (Uppara) Societies)
Construction of CC Road from Railway Gate to NTR Statue in Dasarigudem Hamlet of Kokkirapadu Village Pedapadu Mandal 1/220 to 1/342 Estimate cost. Rs. 10.00 Lakhs 23 % ZPGF
Laying of CC Road, Footpath and Parking Tiles on back side of Science Park parallel to Railway track in Magunta Layout in Nellore Municipal Corporation under 14th FCG (2nd call)
Desiltation of Major drain Gundlakamma channel from Ramalingapuram railway Under bridge to mini bypass via karnalamitta High school including connected medium drain in Division no. 45 in Nellore Municipal Corporation
Providing CC Roads and Drains at sai nagar in Venkatapuram, Nagendra colony, venkatadri gardens, Venkatapuram Railway Under Bridge in Venkatapuram, Padmanabha nagar, chandra nagar, Appalanarsayya colony in ward no.66
CONSTRUCTION OF ROB IN LIEU OF L C NO 134 IN KAMALAPURAM TOWN LIMITS AT RAILWAY KM 283/3-4 OF RENIGUNTA GUNTAKAL SECTION IN YSR KADAPA DISTRICT (3rd Call)
MANSOON ACTION PLAN 2018 S.NO.16 OF 109 REMOVAL OF SILT WET SILT IN EXISTING OF OUT FALL DRAIN IN DRM OFFICE AND THROUGH RAILWAY TRACK IN DIV. NO. 31
Recarpeting the B.T road with 40mm B.C and providing road marking paintings, Zebra crossings, studs from Railway underpass to Rama Krishna Rythu Bazar junction (Bowdara road) in ward No.29
Providing sewer network major gaps at Gavarakancharapalem, R.P. Peta, Railway gate, Old ITI Junction, Urvasi Junction, Swarnabharathi Indoor Stadium, gnanapuram inside trunk main covered under JNNURM Package- II (3rd Call)
Construction of CC Road from Railway Gate to NTR Statue in Dasarigudem Hamlet of Kokkirapadu Village Pedapadu Mandal 1/342 to 1/464 Estimate cost. Rs. 10.00 Lakhs 23 % ZPGF
Providing Path Way for construction of Storm Water Outfall Drain from Kadakatla Railway Gate towards Uppakapadu Drain in Tadepalligudem Municipality under Non Plan Grant 2013-14 unspent Amount. (4th call)
REMOVAL OF WET SILT AT CIRCLE-8 (27,28B,29A WARDS) IN RAILWAY DRAIN JYOTHULA VARI STREET TO WARD ROAD, PEDDA MARKET TO WARF ROAD VIA OLD POST OFFICE OF KMC.
Laying of CC Road from D.No: 26-13-670 to D.No: 26-13-270 at BV Nagar near Railway Track in Division No. 22 of Nellore Municipal Corporation (22/1)
Providing Fisher Boats for desilting work in the major outfall drains from Gandhi hill to Vehicle depot under railway track in 54th & 35th divisions in circle-1 area (1st call)
Construction of CC Road from Railway Gate to NTR Statue in Dasarigudem Hamlet of Kokkirapadu Village Pedapadu Mandal 1/220 to 1/342 Estimate cost. Rs. 10.00 Lakhs 23 % ZPGF
PROVIDING PRECAST CC DRIVER BLOCK FRO PROVIIDNG ONE WAY TRAFFIC AND TO REGULATE THE TRAFFIC FLOW UDER SAFETY MEASURES ACHUTHAPURAM RAILWAY GATE AND MUNSIF JUNCTION OF KAKINADA MUNICIPAL CORPORATION. (RECALL)
PROVIDING ADDITIONAL FILLING AND LEVELLING WITH BARROWED EARTH IN BLOCK -3 SOUTH BIT OF AC 45.12 CENTS IN LOW LAYING AREAS IN PEDALANDARIKI ILLU HOUSING LAYOUT NEAR DUMMULAPETA RAILWAY TRACK.
Laying of CC Road from existing road ( E Pole No.MP14/A70 to Muthyalapalem Park near Railway track (E Pole No.MP5/B7) in Division No.19 of NMC Under 15th FCG
De-silting of Irrigation canal Storm Water Drain including both side drains from Railway Culvert to NTR Junction in ward no 83 in Anakapalle Zone of G.V.M.C. (Reserved for society )
Construction of CC Road from Railway Gate to NTR Statue in Dasarigudem Hamlet of Kokkirapadu Village Pedapadu Mandal 0/976 to 1/098 Estimate cost. Rs. 10.00 Lakhs 23 % ZPGF
Construction of CC Road from Railway Gate to NTR Statue in Dasarigudem(H)of Kokkirapadu (V) Pedapadu (M) 0/854 to 0/976 Estimate cost. Rs. 10.00 Lakhs (23 % ZPGF)
Removal of Silt from D.No. 73/121 to 73/142-1 in Ramarajupalli and D.NO. 55/78-1 to Railway Bridge in Chowtapalli in 48th Division of Kadapa Municipal Corporation
Laying of CC roads and CC drains from D.no.44-18-28 to 44-19-1 and Paradesamma Temple opp street at Railway new colony in ward no.42 (GGMP)
Construction of CC Out Fall Drain to Nehrunagar Main road (Donka Road) from Nehrunagar 9th line to Nehrunagar Railway tarak (East Side) in Div No.56 Under AE-12 Section.
Construction of CC Road from Railway Gate to NTR Statue in Dasarigudem Hamlet of Kokkirapadu Village Pedapadu Mandal 1/342 to 1/464 Estimate cost. Rs. 10.00 Lakhs 23 % ZPGF
Construction of Welcome Arch as Permanent Infrastructure in layout of YSR Jagananna Housing Colony of Divipalem Railway Track west (098341LA107406) Layout in Gudur (U) Mandal (Size of Arch 30 feet)
CONSTRUCTION OF HALTING AREA (STEPS AND RAMP) AT RAILWAY CROSSING CULVERT NO.08 FOR FISHERMAN TO HALT SMALL BOATS AT BACKWATERS OF SEA ALONG THE KHUMBABHISHEKAM ROAD IN KAKINADA. (RECALL)
Construction of CC Road from Railway Gate to NTR Statue in Dasarigudem Hamlet of Kokkirapadu Village Pedapadu Mandal 1/098 to 1/220 Estimate cost. Rs. 10.00 Lakhs 23 % ZPGF
Supply and fixing of Temporary mobile toilets on hire basis at East side of Somagundam pond and Railway compound for Karthika Masam 2025 in 10th and 17th ward Bhimavaram Municipality
Construction of Compound wall For Railway Reservation Office at Arundelpet Area For Road Widening in View of Sankar Vilas Fly Over Construction in Div No.52 of Guntur Municipal Corporation
Providing Centre Lighting from Balaji Peta Junction near Railway SChool to Balaji Peta Newly constructed culvert and side lighting from Culvert to fly over of RMC. (Under SCSP Grant Work)
Engaging of Hydralic Excavator for removal of silt in outfall drain from R&B Culvert to Vejendla Railway crossing Culvert at Budampadu in div no.16 under AE-15 section.
Construction of CC road from Railway track road to BKL road in Sankarmatam Road (from Ele.Pole No. SS56/718/Z-2 to SC No.35592/Z-2) in 34th division
Providing New Center Lighting with Erection of New Poles at M.G Road Anjuman Street Circle to Railway Community Hall Pole No F/3/2-1 to SB/10 under BPS
Restoration and Improvements of 600 mm CC Drain from Apollo Pharmacy to K.K. Rao Hot and Chips Center to Railway under Bridge in Ashok Nagar in ward no.46 (RECALL)
SUPPLY OF UNDERGROUND RAILWAY JELLY FILLED 06 QUAD CABLE 0.9 mm DIA AS PER IRS SPECIFICATION No IRS:TC 30/2005 (Ver-1) (Amd 1 to 5) OR LATEST, IF ANY
Supply of Laser Wheel Profilometer (Advanced Version) specifically designed to work as per Indian Railway Standards. (Detailed technical specifications attached). (Warranty Period : Upto 36 months from the date of delivery.)
PVC INSULATED, ARMOURED, UNSCREENED, UNDERGROUND RAILWAY SIGNALLING CABLE [COPPER CONDUCTOR] SIZE 19 Core X 1.5 Sq mm TO RDSO SPECIFICATION No IRS:S:63/2014 (Rev 4.0) OR LATEST, IF ANY.
1) Mirror-LH for LHB Coaches 2) Mirror- RH for LHB Coaches 3) Mirror without Frame, Size: 406 x 254 x 5.5 mm with two Railway Monogram on Opposite Corner