Cable power 6 core 1.5 Sq MM copper conductor PVC Insulated Armored, Unscreened, Underground Railway Signaling Cable Spec: IRS:S-63/2014 (Rev.4.0) or latest (for use in JAG line No-3)
Pillow cover handloom bleached white superior quality size: 65 x 38 cms. with screen printing of "Northeast Frontier Railway" Month & year of manufacturing in English and Hindi script in strip of size
Pillow cover handloom bleached white superior quality size: 65 x 38 cms. with screen printing of "Northeast Frontier Railway" Month & year of manufacturing in English and Hindi script in strip of siz
Queue Manager - Material : Stainless Steel Premium model, ii) Pole length 970 mm, iii) Retractable belt length : 03 Mtr, iv) Weight: 10 Kg iv) Railway Protection Force and Loco Printing in multi c
Supply, Installation, Testing & commissioning of 2x25 kV OHE system in existing 1x25 kV OHE between doubling of PKA - SDBH - PEH section and SDBH - SNMY section under Dhanbad division of East Central Railway.
Formation and Railway track execution
PAIR OF PRESSURE GUAGES [100 MM] FOR FEED PIPE AND BRAKE PIPE WITH TEST CERTIFICATE TO RDSO DRG. NO. WD-83062-S-05, ALT-3 AND C. RLY. ALT-a, FOR FEED PIPE AND RDSO DRG. NO. SK-73553, ALT-5 FOR BRAKE PIPE. MATERIAL AND SPECIFICATION : RDSO SPEC. NO. 02-ABR-02 WITH AMDT. NO.4 OF SEPT-2016 , APPENDIX-H.
P. V. expansion (Cover) moulding size- 20 x 20 x 6 x 6 x 2 x 2000 mm long to N. E. Rly. Drg. No. SK-1457/C Alt. 2, Fig. 5 item 1, colour as per Drg. Material testing should be done as per RDSO Specn. No. RDSO/2015/CG - 02 (Rev. 1) with Amndt. 01 of Nov 17.
Re-routing of existing 12.75in HBPL and 18in PHBPL M/L, L/L pipeline sections at PHBPL Ch. 482.5 and 483 KM due to proposed double BG railway track by M/s IRCON
Diclofenac Diethylamine 1.16% w/w + Linseed Oil/Oleum Lini + Menthol + Methyl Salicyclate Gel - minimum 30 gm[Product should be available in the Manufacturing firm's approved product list of Railway Board] AI 26-27
At NJP- Upgradation of Capacity and Improvement of Electrical Power Distribution System in Railway Colonies for facilitation use of Electrical Equipment under "Improvement of various Staff Amenities in Staff Quarters" in Phase-I.
Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts; Consultancy Package for Detailed Feasibility Study (FSR/FR) for Augmentation of Railway siding Infrastructure & Systems including Over Head Electrification and S&T for Bara..
Construction Of RCC Bridge at NH31 Pul Se Railway Pul ke Nichey Hoke Guide Bandh Hute Hue Katriya Ke Taraf Katriya Wat Briksh ke Bay Taraf Se Sangam Asthal tak Path Pul Nirman
Supply and Installation of Ultrasonic leak detector machine for leak detection from pipe line of air brake system in all type Wagons of Indian Railway, with Head Phone probes, Probe holder. Each machi
Refrigerant Gas R-410a on returnable empty cylinder basis, make- Freon or similar in all respects. Note:-R410 gas of 60 KG refilling in railway given cylinder only. Empty cylinder should be provided
Laptop-Notebook (Q2) ( PAC Only )
Power Bank for Mobile and Laptops (V2) (Q3) MSE Exemption for Years of Experience and Turnover
Entry and Mid Level Desktop Computer (Q2) MSE Exemption for Years of Experience and Turnover
At Zone No. 1A:Maintenance and repair of staff quarters, service building, Roads, drains and Railway Track : O.T. Para including Railway Hospital, Children park, RPF 'C' Company, Yard Office, Manihari terminal, Yard FOB, Mangal Bazar ROB, SSE(W)/W office, AMM Store, Electrical Sub station, Kosi Pump Station etc. at Katihar and all assets between Katihar-Teznarayanpur section, (Km 0.00 to Km 34.73) under SSE/W/W/KIR from 01.07.2026 and upto P.E 30.06.2028.
Custom Bid for Services - Manning of Railway owned traction sub stations at Bajpatti Raxaul Bairgania & Hasanpur outcome based of SPJ Division for two years through outsourcing Similar Category Manpower Outsourcing Services - Man-days based
Supplying and stacking of 50mm size Pakur variety machine crushed track ballast for New B G Line from Jaynagar to Bardibas Nepal Railway project for Nepal portion only from Km 34800 to Km 52336.
T01-NH 57 Narhiya To Sarauti Supaul Sima Tak Via Parasa Railway Halt Construction of RCC Box Bridge At Ch 14 475 k.m in NH-57 Narhiya To Sarauti Supaul sima via Parasa R
Construction of Rail Viaducts on Pile foundation with composite steel girders and Deck Slabs and allied other civil engineering works on the South end approach of proposed Railway Bridge on River Ganga at Mokama
Water control and fishing right in the section Mansi (in) - Pasraha (ex.) from km. 116/00 to 92/10 on Railway Land under jurisdiction ADEN/THB for the period 36 months (01.04.2026 to 31.03.2029)
Supply of three compartment good quality durable Canvas Tool bag with shoulder strap. size of bag around width 18'' approx. X Height 15'' approx. X depth 6'' approx with Indian railway logo. Make- Din
Supply, installation, testing, and commissioning of automatic fault locator (AFL) for 2x25 KV AC traction system of latest RDSO specification in GHD-MHDA section of Dhanbad Division under Project Danapur of East Central Railway".
Safety Footwear For Railway Workshop (Q1) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6895347 Dated : 15-11-2025 Bid Document 1/8 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Electrical boom barrier for railway crossing
Provision of parallel Server and CMU setup as per RDSO guidelines at Data Logger in S&T Control room and strengthening of existing datalogger network & COA of divisional headquarters at Danapur under East Central Railway.
Construction of RCC Retaining wall near TAL junction to retain embankment slope for provision of future track on Delhi Howrah Main line in connection with Mokama Bridge project in Danapur Division of East Central Railway
Maintenance of new BG DN Track between station Ex. Hajipur-HJP-Sahdei Buzurg SDG for a period of six months in Sonepur Division of EC Railway in connection of doubling of Hajipur Bachhawara rail line
Anti erosion work cum embankment protection including toe protection of vulnerable formation of newly commissioned BKP ROR rail line and Surface Triangle rail line between Mankatha to Karotapatner under Danapur Division of East central Railway.
ENVELOPE SE-4, SIZE : 13X10 CM. TO BE PRINTED ON TOP "ON INDIA GOVERNMENT SERVICE" "EASTERN RAILWAY, " IN HINDI AND ENGLISH. THE ENVELOPE SHOULD BE MADE OF 60 GSM BUFF MANILA/ KRAFT PAPER. PACKING 10
Spare parts of CCTV as per specification ICF/MD/SPEC-269, ISSUE STATUS -02, REV-00, 8 channel DS-MP7608HN network video recorder parts must be complatible with CCTV fitted in coaches of Indian Railway
Computer stationary Blank , Size: 12"x12"x3 Part 6 0 GSM Machine CONFORMING TO IS: 12766/1997, with IR Logo printing matter : 10 monogram Diaram 9 Cm. the monogram of Indian Railway shpuld be printed
Petroleum Cutting Gas in lieu of dissolved acetylene to be used with oxygen in cutting Railway Wheels Hub at hub cutting stations. The hub size is 190 mm diameter and 200 mm thickness. Petroleum cut
FORM OF DAILY DIARY FOR RAILWAY PROTECTION FORCE IN BOOK OF 1 TO 100 PAGES IN DUPLICATE SERIALLY NUMBERED (ROZNAMCHA) OF 70 GSM OF A4 SIZE PAPER as per Tech Specification and Sample enclosed. Accepte
Design, Supply, Installation, Testing and commissioning of EI System conforming to spcn No RDSO_SPN_192_2005 with latest amnd, Indoor, Outdoor SnT works at Tal Jn, Rajenderpul, Hathidah, Rampur Dumra station of Danapur Division of EC Railway
Shifting of underground 33KV HT cable crossing the Railway track which is passing through the alignment of PP2 location of Punpun arm of ROB in lieu of LC-79A and LC-1SPL at Mithapur, Patna, Bihar
Construction of 3.0 M wide New Foot Over Bridge FOB and Dismantling of Old FOB at Shahpur Patoree Station SPP in connection with Doubling work of Hajipur-Bachhwara Section of Sonepur Division of E C Railway
Statutory Testing of 03 nos. of Mounded Storage Vessels of capacity 600 MT at LPG Bottling Plant, Muzaffarpur and 2 Nos of 30 MT over ground LPG Vessels at Railway Cast Wheel Factory, Bela, Saran, Bihar
Supply and stacking 53900 cum of Pakur range or Sahibganj Loop area machine crushed track ballast as per RDSO specifications IRSGE1 of June 2004 with uptodate correction slip for Doubling of Hajipur Bachwara Railway line Project
Pillow cover Polyvastra 65 cm x 38cm(white) The following printed information should be available in one corner of one side of the Pillow Cover: (a) N.F. Railway (b) Year & month of Mfg. (c) Name and
BOOK RULED 1 QUIRE SIZE: 21CMS X 29.7CMS (TRIMMED) (50 LEAVES PER BOOK) PRINTING (1) ON COVER FRONT COVER SHOULD BE PRINTED WITH THE FOLLOWING (i) INDIAN RAILWAY LOGO OF SIZE 70MM DIAMETER TO BE PRINT
Removal of infringement of 800 KV HVDC transmission line between Tower no. 1806 to 1818 in Biswanath Chariali, Assam- Agra comes in the alignment of proposed Raniganj-Araria court section in Supaul-Araria Railway Electrification work
Removal of infringement of 800 KV HVDC transmission line between Tower no. 1806 to 1818 in Biswanath Chariali, Assam- Agra comes in the alignment of proposed Raniganj-Araria court section in Supaul-Araria Railway Electrification work
M4450256103
M4454066025, M4454066027, M4454066028, M4454066030, M4454066033, M4454066035, M4454066037, M4454066086, M4454066151, M4454066155, M4455066158, M4455066327, M4456065024, M4456065105, M4456065116, M4456065055, M4456065057, M4456065059, M4456065066, M4456065068, M4456065069, M4454066161, M4455086209
Submersible Pump Starters (Motor starter controls) (Q3) MSE Exemption for Years of Experience and Turnover
M3799064020 - GLOBE VALVE ASSY F3908DH BHEL, M3799995201 - GLOBE VALVE ASSY BHEL, M3799995260 - GLOBE VALVE 6 BHEL C3500SPL-BW-GO-C12A, M3799995261 - GLOBE VALVE ASSY C3915DMSA30 1 6 IN BHEL, M4425296000 - SAFETY VALVE ASSY 1787WQ BHEL, M4425296030 - COMP VALVE ASSY SV 7302 002 BHEL, M4425296060 - SAFETY VALVE ASSY 1787 WB BHEL