Loading…
Loading…
2,628 results • Best match
SET OF BLOWER FAN RIGHT HAND SIDE & LEFT HAND SIDE FOR FEDDERS LLOYD MAKE RMPU ,AS PER FEDDERS PT NO.FOR RHS FLC-RLY-045 QTY. 01NO. & FLC -RLY -001 FOR LHS QTY.01 NO. ELPS/SPEC/AC/03 REV.2 WITH AMENDM
Cleaning of existing railway track drain cutting and removal along railway siding under SDOCM Project.
Engagement of hydraulic excavator (3D) with tractor to remover carbonaceous material from Railway siding and dump at G.P.Seam under Lakhimata Group of Mines.
Repairing of tail end shaft with bearings for M.S BWF make feeder breaker no02 at JRD RLY siding PF1
Moorum spreading, surface dressing from Kewat tola to near old Rly. Over bridge, Under G. M. Unit, BnK Area.
Repairing of under carriage with bottom floor structure of feeder breaker no01 at JRD RLY siding under Konar Exp
Changing of damaged sprinklers, repair-reorganising of pipelines for sprinkling at konar rly. Siding, konar exp. OCP, BnK Area
Making one no dustbin and repair of overhead water tank and stair at Rly. Siding, Tarmi colony under SDOCM.
Construction of control room for weigh bridge near Ganga shovel junction under ROCP for accessing Rly siding.(2nd call)
Day to day maintenance of Rly. Track in Bachra siding including fitting and fixtures under CHP CPP Piparwar Area.
Heightening of boundary wall and providing approach near Senior Qtr. and Rly. Colony transformer under GM Unit BnK Area
Fabrication and reconditioning of rest shelter/shed near barrier at konar rly. Siding of konar exp. OCP BnK Area.
Repairing of top drum plate and secondary plate of feeder breaker No.2 at Jarangdih Rly. Siding PH 2
Cutting of kuccha drain in between both Railway track of New Railway Siding of Kathara Washery
Dismantling of LT overhead line besides railway line no. - 01 and providing chemical earth pits in all the structural crossing railway lines at railway loading point, SCW.
Construction of RCC drain from near old weigh bridge to culvert at Central Pool Railway Siding under Lakhimata Group of Mines (L-135.00 m).
Engagement of Hydraulic Excavator (3D) with Tractor to remove carbonaceous material from Railway siding and dump at G.P. Seam under Lakhimata Group of Mines.
Providing wings walls in existing culvert 02 nos. with pavement at Bijain railway crossing near in motion weigh bridge of Rajdhar railway crossing and approach road from main road to R.R site Bijain Kalyanpur near Karo Temple under Ashok OCP, Pipar
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Finance/Accounts, Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others
Renovation / Strengthening of the existing Railway Siding for 2.5 MTPA, NLW Washery at Patherdih, Dist. Dhanbad, Jharkhand
Cleaning of existing railway track drain, cutting and removal along railway siding under SDOCM(For one year)
Maintenance of Railway track, drainage system along track at Tarmi Railway siding under SDOCM Project. (One year)
Providing and fixing mist canons stationary fixed type for dust suppression application with necessary arrangement at Central Pool Railway Siding under Lakhimata Group of Mines.
Goods Transport Service – Per KM Based Service - Railways Material; Open Body Taurus; 16 FT or above and 9 or 10 MT
Repairing of two nos. 160KW/215HP, 440V induction motors of Feeder breaker installed at JRD rly. Siding, AKKOCP, BnK Area
Rep. and Maint. of roof sheet and Misc. Civil work of Sub-Station near Phularitand Rly. Station at Phularitand Colliery
Cleaning of shoulder by earth cutting from Bermo Rly. Crossing to jhabu singh college Under GM Unit of BnK area.
AMC for cleaning of drain between Rly track and drain beside track near Dhowrah colony for one year under AADOCM.
Reorganised and maintenance of 440 V to 220 V electric lighting line of JRD RLY siding under AKKOCP, BnK Area
Day to day sanitization at HEMM, Dumper, Rly Sdg. Dozer, tanker, Payloader, pit office, weigh bridge etc. under A.K.K. OCP.
Khadi Polyvastra Bed Sheets - Indian Railway
Safety Footwear For Railway Trackmen (Q1)
LIQUID CLEANING COMPOSITION FOR EXTERIOR RAILWAY
Safety Footwear For Railway Trackmen (Q1)
Repairs of Railway hospital at TATANAGAR.
Construction of CTR from Ashok to Rajdhar Railway Siding and CHP CPP under Ashok Project Piparwar Area.
Transportation of coal from 36 No. Coal Dump to Mobile Crusher no. 3A, 4A and 5A of Sijua Rly. Siding and from discharge end of Mobile crusher no. 3A, 4A and 5A of Sijua Rly. Siding under Katras Area to Lakarka and Sijua Siding including allied jobs
Repairing/Rewinding of 160kW/214 HP, 415V, 1487 RPM Squirrel cage induction motor of primary crusher drum of LnT make mobile crusher at NLOCP railway siding.
Day to day maintenance of Railway Track Line of Jarangdih Railway Siding under Jarangdih Colliery. (For two years)
Day to day maint of Railway track line of Jarangdih Railway siding under Jarangdih Colliery for two years
Railway siding operations for round the clock Railway siding control panel/Shunting/Track point checking and clamping /Signalling
Day to day maintenance of Railway Track Line of Jarangdih Railway Siding under Jarangdih Colliery (For two years)
Maintenance of railway siding and tracks with repairing of wharf wall at Garearia railway siding under Sijua Area
Loading of 166.44 Lakh Te Coal into Railway Wagons by contractors payloader(s) at Rajdhar Railway Siding of Piparwar Area for a period of 02 Years
Systematic annual maintenance contract work for 02.00 years (730 days) of railways track at Chainpur Siding under Kedla Washery of Hazaribagh Area
Emergent repair and alignment of track after derailment of wagon at Jarangdih Rly. siding PF-1 under AKKOCP of BnK Area
Part-Repairing of 500KVA 3.3KV/440V transformer and installation /commissioning on pole mounting at konar rly siding of AKKOCP, BnK Area.