Loading…
Loading…
58 live19 closing this weekmost from South Western Railway and Public Works Department
58 results • Best match
Bengaluru City-Dharmavaram Section: Fabrication of RH girders for the proposed pedestrian subways to facilitate crossing of railway alignment by cattle, pedestrians and smaller vehicles in varoius locations in connection with speed increase up to 130 Kmph(Total no of subways-17). Maintenance period is 3 months.
(1) Carriage of All Kinds of Forged Axles from Rail Wheel Factory/Yelahanka /Bengaluru/Karnataka-560064, and delivery of the same at the premises of M/s.MOHATA COAL COMPANY PRIVATE LIMITED, No.779, NAIM NAGAR, GT ROAD, DURGAPUR, W.B. - 713203. ... by Railways at ... by Railways at ...
Procurement of 3000 KL of HFO through Railway BTPN wagons for Bellary Thermal Power Station for the year 2026-27
Construction of 2 lane ROB in lieu of LC no.1 as 1X30.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Amaravathy Nagar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Desihalli)(Approach Span)+ RE Blocks and Retaining Wall (Approach Portion)) at km 1/800-900 along with LHS between BWT-COL stations of BWT-MKM section of SBC division. (Composite work)
Construction of 2 lane ROB in lieu of LC no.162 as 1x36.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Kolar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Bangarpet) (Approach Span) + RE Blocks and Retaining Wall (Approach Portion)at km 144/900-145/000 and construction of pedestrian subway between BWT-KQZ stations of YNK-BWT section of SBC division. (Composite work)
RFP (Request for Proposal) for Design and construction of major bridges (28 no's) with substructure, super structure, formation on approaches of 50 m on either side of the bridges and other connected protection works including surveying, soil and ... Western Railway ON
MS PIPELINE WORKS ALONG WITH OTHER ALLIED UTILITIES