Loading…
Loading…
3,030 results • Best match
Inj. Amikacin 500 mg [Product should be available in the Manufacturing firm's approved product list of Railway Board ] ITEM CODE M010202 , AI 22-23
Inj. Cefoperazone 1 gm. [Product should be available in the Manufacturing firm's approved product list of Railway Board ] ITEM CODE M010413 , AI 22-23
CLASS- 3 DIGITAL SIGNATURE CERTIFICATE ALONG WITH USB TOKEN WITH ORGANIZATION NAME AS INDIAN RAILWAY FOR DIGITAL SIGNING OF DOCUMENTS WITH VALIDITY 02 YEARS.
Lubricating GN Plus paste suitable for Railway Disc and Axle during pressing, Brand: Molykote GN plus or similar. Accepted make : MOLYKOTE GN Plus Paste
PVC insulated, armoured, Unscreened, Underground Railway Signalling Cable [Copper Conductor] size 19 core x 1.5 sq.mm to RDSO Specification No.IRS:S:63/2014,(Rev 4.0) .
Tab/Cap Amoxycillin 500mg [Product should be available in the Manufacturing firm's approved product list of Railway Board ] ITEM CODE M010101 ,AI 22-23
CLASS- 3 DIGITAL SIGNATURE CERTIFICATE ALONG WITH USB TOKEN WITH ORGANIZATION NAME AS INDIAN RAILWAY FOR DIGITAL SIGNING OF DOCUMENTS WITH VALIDITY 02 YEARS.
CLASS- 3 DIGITAL SIGNATURE CERTIFICATE ALONG WITH USB TOKEN WITH ORGANIZATION NAME AS INDIAN RAILWAY FOR DIGITAL SIGNING OF DOCUMENTS WITH VALIDITY 02 YEARS.
construction of rain water harvesting System in the Park Adjacent to the Railway Track in A Block, Devaraj Urs Layout under Davanagere City Corporation
1Annual Maintenance of Indi Railway Station Airsang Lachyan Baragudi Road K.M 5.80 to 18.00 In Indi Taluka . For the year 2025-26.2) Annual Maintenance of Salotagi Khedagi Road K.M.11.00 to 17.00 . In Indi Taluka . For the year 2025-26.3) Annual Maintenance of Nada Golasar Mirgi Road K.M. 0.00 to 5.77 & 7.72 to11.00 In Indi Taluka . For the year 2025-26.4) Annual Maintenance of Heribevanur to Buyar Nagaralli Khedagi Road K.M. 0.00 to 11.50. In Indi Taluka . For the year 2025-26.5) Annual Maintenance of Nada K.D. to Arjungi B.K. Golasar Road K.M. 0.00 to 8.50 In Indi Taluka . For the year 2025-26.6) Annual Maintenance of Khedagi Rodagi Miragi Road K.M. 0.00 to 8.00 In Indi Taluka . For the year 2025-26.7) Annual Maintenance of Hirebevanoor Satalagaon PI-Nad-Hiremasali Road at Km 0.00 to 25.00 In Indi taluka of Vijayapur district For the year 2025-26.8) Annual Maintenance of Arjunagi BK-Arjunagi KD-Hanchanal-Miragi Road at Km 0.00 to 6.00 In Indi taluka of Vijayapur district For the year 2025-26.9) Annual Maintenance of Lalasangi Shivapur K.D. to Rodagi Road K.M. 0.00 to 5.00. In Indi Taluka For the year 2025-26.
Construction of Storm water drains from venkateshwara layout of ward no.23 of srinivaspura municipality to MG Road on kollur main road from 20.2 road to fire station from government hospital to mulbagilu road, from mulbagilu road to daragah, from ... to railway bridge ... from railway bridge ...
Goods Transport Services - Per MT - Transportation of Iron Ore Fines from NMDC Kumaraswamy Mines B Block to Swamihalli Railway siding and Rake loading; Tipper/Dump Truck; Large Tipper, Goods Transport Services - Per MT - Transportation of Iron Ore ... Swamihalli Railway siding ... Ranjithpura Railway siding ... Ranjithpura Railway siding ... Yashwanthnagar Railway siding ... Yashwanthnagar Railway siding ... Yashwanthnagar Railway siding ...
MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2)
AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 (Q2)
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2)
Stationary Cells and Batteries, Lead Acid Type (with Tubular Positive Plates) as per IS 1651 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6319501 Dated : 17-06-2025 Bid Document 1/9 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 48 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : POWERGRID Regional Head Quarters (SRTS-II) Bengaluru- Near RTO Test Driving Track, Singanayakanahalli, Yelahanka Hobli, Bangalore – 560064 (Powergrid Corporation Of India Limited) Splitting
Custom Bid for Services - Schedule A Cost Of Man Power for Mechanized Cleaning of Dharwad Railway S, Custom Bid for Services - Schedule B Cost of Machinery for Mechanized Cleaning Contract of Dharwad, Custom Bid for Services - Schedule C Cost of ... Dharwad Railway S, ...
Construction of Elephant Proof Railway Barricade Fencing using used Rails from Sullikonchalu to Onamatthimarada Halla-0.98 Km in Hanuru Wildlife Range during the year 2025-26
Hubballi Division: Proposed construction of Hostel for Post Graduate Men and Women Doctors and dormitory at Railway Central Hospital at Hubballi. (Maintenance Period: 03 Years)
Provision of Centralized Electronic Interlocking (EI) system at Banavar (BVR) and Devanur (VNR) stations between SPGR-KJG sections of Mysuru Division of South Western Railway.
Improvements to main roads and cross roads along with R.C.C. drain at Railway Parallel road, Near Chitra Kala Parishat in Ward No 117 Vasanth Nagar
CONSTRUCTION OF RETAINING WALL FOR RESTORING COLLAPSED EARTHEN SLOPE ADJACENT TO RAILWAY LINE NEAR WEIR-1 AT KUMBARDI COFFEE ESTATE VILLAGE, SAKLESHPURA TALUK, HASSAN DISTRICT
Work for Shifting utility of water supply pipelines for construction of two lane ROB at baddihalli railway gate LC no. 38 in city corporation tumakuru
Construction of Elephant Proof Railway Barricade Fencing using used Rails from Odapanchankuli to Talabetta -0.70 Km in Halaguru Wildlife Range during the year 2025-26
Work for Shifting utility of water supply pipelines for construction of two lane ROB at batawaadi railway gate LC no. 39 in city corporation tumakuru
Construction of RCC Drain on both sides from Railway Track to Jhanda Katta to Contractor Fakruddin House in Ward. 01 Rehmat Nagar at Hosapete city.
Providing RCC approach road at Old Railway gate near PT No.1 and WT- 4 & 5 to PT.No-38 in Marshalling Yard area at RTPS
Inj. Meropenem 1gm per vial.[Product should be available in the Manufacturing firm's approved product list of Railway Board ] ITEM CODE M010601 AI 22-23
Tab/Cap Cefixime 200 mg [Product should be available in the Manufacturing firm's approved product list of Railway Board ] ITEM CODE M010405 AI 22-23
Supply and fitment of 6mm plywood sheet with 1mm LP sheet pasted on RA-6 coach ceiling The shade of LP sheet approved by railway
Provision of Centralized Electronic Interlocking (EI) system at Banavar (BVR) and Devanur (VNR) stations between SPGR-KJG sections of Mysuru Division of South Western Railway.
Custom Bid for Services - Mechanized cleaning of platform turn round trains daily of 81 coaches at SMET Coaching Depot for a period of one year incl of GST, Custom Bid for Services - Mechanized cleaning of Railway Station at Shivamogga Town daily for a period of one year incl of GST
SW-I Construction of Overhead Tank of capacity 2.50 lakh litres and construction of GLR tank of capacity 1.00 lakh litre at Arsikere railway station.SW-II Construction of Overhead Tank of capacity 1.00 lakh litres at Hassan Railway station.SW-III:- Construction of resting facility for escorting staff at TLGPSW-IV:- Construction of resting facility for escorting staff at HAS
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, ... WESTERN RAILWAY , ... RAILWAY, Indian Railways , ... Western Railway , ... of Railways (Mahendra ...
Maintenance of Railway Track in the Marshalling Yard and Wharf Area 8 dot 10 Km of NMPA for a period of three years 2026 to 2029 at NMPA Mangalore
Supply, Erection, Testing and Commissioning of 16 Mtr high High mast light with LED fixtures and improvements to external lighting towards railway siding at BSC Whitefield.
Custom Bid for Services - Outsourcing Colony cleaning and Sanitation comprising of Harihar Arsikere and Shimoga Railway Colonies for a period of Two years on outcome basis
MYS: Construction of RCC box drain cum compound wall along railway boundary parallel to stabling line Upto STP to treat sewage water as per NGT guidelines
Construction of Drain and covering slab from railway track to BET school and covering slab from hessarughatta main road to jem in limits of TMC Chikkabanavara
Drilling and electrification of borewell to provide water supply to park located next to the railway tracks in Ward No. 15 under Davanagere City corporation Limits
Construction of CC drain from Edigara mooganna house to ravinaidu house at 07th ward and infront of society to railway gate at 05th ward Mariyammanahalli town.
FLOOD MITIGATION WORKS & CLEARING DEBRIS OF DONI RIVER BRIDGE AT HONAGANAHALLI ( BOTH NH-52 & RAILWAY BRIDGE) IN BABALESHWAR TALUKA OF VIJAYAPUR DIST(Zilla Vipattu Upashamana Nidhi)
Fixing of Vertical used waste rails for existing railway barricade at vulnerable points from Bharathwadi Cross to Jargal Point in Veeranahosahally Wildlife Range During 2025-26
Providing and Laying of 75m,90mm, and 110mm HDPE Pipe Line from Basava Sri School to Gppi Railway House in Ward No 01 in Raichur City
Construction of CC Road from Kudligi - Sandur Main Road, Yeshwanthanagar Village to Ankamanahal Railway Gate, Ch. 0.10 km to 0.90 km, in Sandur Taluk, Ballari District
Maintenance of Second year old Monsoon Plantation from Kantenahalli Railway Bridge to Lalandevanahally Road side of 3 Km at K.R.Nagara Social Forestry Range during 2026-27
Inj Ceftriaxone 1gm + Sulbactam 500 mg [Product should be available in the Manufacturing firm's approved product list of Railway Board ] ITEM CODE M011010 AI 22-23
Custom Bid for Services - Appointment of CF agent for loading of iron ore pellets into open wagon Rakes Train Load at NMPT Railway Marshaling yard PNMN()