Loading…
Loading…
3,909 results • Best match
Providing 7.5 HP Diesel Engine mud pump for pumping out water from 20 MGD line to camp 1 area at Harbour Railway Over Bridge for the period from 01.04.2025 to 31.03.2026 to meet the water requirement at Thermal Nagar.
ECHS Dn NCTPS and AIP railway siding Daily maintenance and preventive and breakdown works of tracks and electronic in motion weigh bridge EIMWB at track No 8 and relevant equipments through private agency for the period of 1 year
Providing Lightening arrangements to the Road over bridge at km 18 4 of Sivakasi Srivilliputhur Road SH 42 in lieu of existing LC.No.427 lies in railway Km 563 100 200 in between Sivakasi Srivilliputhur Railwaystations in Virudhunagar District
Dismantling of SWD RCC Top Slab and Re-Construction of Top Slab and Desilting of MRTS Railway Road SWD from Six vent culvert to Balakrishna Nagar Main Road Reach - 2 (South side) in Division-177, Unit-39, Zone-13.
Work Contract for DCW Work Laying of 3 X 400 sqmm cable at railway crossing Mundiyampakkam location towards erection of separate 22 KV feeder from 110 22KV Poothamedu SS for providing uninterrupted supply to Govt Medical college and hospital
Providing 7.5 HP Diesel Engine mud pump for pumping out water from 20 MGD line to Camp 1 area at Harbour Railway Over Bridge for the period from 01.04.2026 to 31.03.2027 to meet the water requirement at Thermal Naga
Providing 7.5 HP Diesel engine mud pump for pumping out water from 20 MGD line to Camp 1 area at Harbour railway Over bridge for the period from 01.04.2024 to 31.03.2025 to meet the water requirement at Thermal Nagar
48V/25A SMR MODULE BASED SMPS POWER PLANT AS PER RDSO SPEC NO. RDSO/SPN/TL/23/99 VER 4.0 AMEND NO 1 FOR INDIAN RAILWAY TELECOM EQUIPMENTS (1+1) (EACH 25 AMP, 2 MODULES) CONFIGURATION WITH ULTIMATE EXP
Monthly Basis Cab & Taxi Hiring Services - MUV; 2000 KMS X 360 Hrs; Local 24*7, Goods Transportation service - Monthly Based Service - Outside city within state; Railway Materials; Open Body LCV Truck
Monthly Basis Cab & Taxi Hiring Services - MUV; Overall cumulative average of 1200 Kms run in a month; Outstation 24*7
River Bed Sand (Q3) MSE Exemption for Years of Experience and Turnover
G.I. Pipes for Earthing as per IS 1239 (Part 1) (Q3) MSE Exemption for Years of Experience and Turnover
Interactive Panels with CPU (Q2) MSE Exemption for Years of Experience and Turnover
Entry and Mid Level Desktop Computer (Q2)
CPVC Ball Valve (Q4) MSE Exemption for Years of Experience and Turnover
Hook and loop disc (Q3) MSE Exemption for Years of Experience and Turnover
Table Fan/Wall Mount Fan/Ceiling Mount Fan as per IS 555 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6423829 Dated : 07-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
PVC Copper Cable Single Core and Multi Core Circular Sheathed Cable with Rigid Conductor (V2) as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6309506 Dated : 04-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) (3 (3 ))
Miniature Circuit Breakers Distribution Boards as per IS 13032 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6392474 Dated : 27-06-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 (Q2) (3 (3 ))
Laundry Service - Healthcare purpose
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2) (3 (3 ))
Scrubber Dryer Floor Cleaning Machine (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6944003 Dated : 28-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3) (3 (3 ))
Fiber Glass Sheet (Q3) ( ( 3 3 ))
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; FLT of 3MT capacity including Driver and Fuel and two assisting staff for each FLT with necessary consumables as per scope of wo..
Respiratory Protective Devices- Filtering Half Masks (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6686476 Dated : 17-09-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 424256 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) (3 (3 ))
Auto Refractometer (V2) (Q2)
Respiratory Protective Devices- Filtering Half Masks (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6340536 Dated : 10-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 424256 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; FLT of 3MT capacity including Driver and Fuel and two assisting staff for each FLT with necessary consumables as per scope of wo.., Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Mobile Crane of 15 MT capacity including Driver and Fuel and two assisting staff with necessary consumables as per scope of work..
Anti spatter spray (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6532532 Dated : 04-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 267602 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Piano Type Modular Domestic Electrical sockets - IS 1293 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6309566 Dated : 04-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Table Fan/Wall Mount Fan/Ceiling Mount Fan as per IS 555 (Q3) MSE Exemption for Years of Experience and Turnover
MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6309653 Dated : 04-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Respiratory Protective Devices- Filtering Half Masks (Q2)
Ductile Iron Fittings for Pressure Pipes for Water, Gas and Sewage as per IS 9523 (Q2) MSE Exemption for Years of Experience and Turnover
Puf Seal (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6569230 Dated : 13-08-2025 Bid Document 1/5 Estimated Bid Value 15000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
MCCB with Thermal Magnetic/Microprocessor Based Trip Unit (Q3) MSE Exemption for Years of Experience and Turnover
Prepaid energy meter (Q3) ( ( 3 3 ))
Lead Acid Storage Batteries for Motor Vehicles as per IS 7372 (Q3) MSE Exemption for Years of Experience and Turnover
Multifunction Machine MFM (V2) (Q2)
PVC Insulated Copper Cable Single and Multi - Core Circular Sheathed Cable with Flexible Conductor (V2) as per IS 694 (Q2) (3 (3 ))
Extendable Road Barricade (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6743602 Dated : 30-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 120000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Ductile Iron Fittings for Pressure Pipes for Water, Gas and Sewage as per IS 9523 (Q2) MSE Exemption for Years of Experience and Turnover
Cat - 6 UTP Ethernet Cable for Wifi Indoor use (MTNL) (Q3) (3 (3 ))
Lead Acid Storage Batteries for Motor Vehicles as per IS 7372 (Q3) MSE Exemption for Years of Experience and Turnover
Water Fittings - Copper Alloy Float Valves (Horizontal Plunger Type) as per IS: 1703 (Q4) MSE Exemption for Years of Experience and Turnover