Loading…
Loading…
3,944 results • Best match
Monthly Basis Cab & Taxi Hiring Services - SUV; 3600 km x 720 hours; Outstation 24*7
Printing and Photocopying Service - Photocopying; Onsite; 5; 1; Without Operator; Paper to be provided by buyer; A4 and A3; 80 GSM; 80 GSM; Monochrome, Printing and Photocopying Service - Photocopying; Onsite; 5; 1; Without Operator; Paper to be provided by buyer; A4 and A3; 80 GSM; Not Applicable; Monochrome
Monthly Basis Cab & Taxi Hiring Services - SUV; 2600 km x 312 hours; Local
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Past Performance, Certificate ... DIVISIONAL RAILWAY MANAGER, ... SOUTHERN RAILWAY , ...
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Past Performance, Certificate (Requested in ATC), OEM ... DIVISIONAL RAILWAY MANAGER, ... SOUTHERN RAILWAY , ...
Composite Office Tables confirming to IS 8126 (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Nitrile Coated/Nitrile Hand Gloves (V2) (Q3) MSE Exemption for Years of Experience and Turnover
Electrocardiography (ECG) Machine (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6993872 Dated : 12-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Past Performance 80 % Bid to RA enabled No Comprehensive Maintenance Charges Required Yes Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
All in One PC (V2) (Q2)
Rain Suit (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Partial | Experience - 3 year (s) | Turn over value - 0 (in lakhs) Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6933136 Dated : 26-11-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Quality Assurance Plan document 1764135418.pdf Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Paper Shredding Machines (V2) (Q3) MSE Exemption for Years of Experience and Turnover
Barrels - Steel Barrels Drums as per IS 1783 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6316394 Dated : 06-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
ENQUIRY NO E5033006 for AUXILLARY ALTERNATOR WITH RECTIFIER REGULATOR UNIT FOR 700 HP DETC.
Rain Suit (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6739075 Dated : 03-10-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Silicone sealant (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6898808 Dated : 17-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
brooms (Q4) ()
Multifunction Machine MFM (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6900605 Dated : 19-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6721455 Dated : 24-09-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6902491 Dated : 19-11-2025 Bid Document 1/14 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 455000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tungsten Inert Gas (TIG) Welding Equipment as per IS 9604:1994 (Q2) MSE Exemption for Years of Experience and Turnover
sipper bottle (Q4)
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6535169 Dated : 05-08-2025 Bid Document 1/11 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Online UPS (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Steel Tubes, Tubulars and Other Steel Fittings as per IS 1239 (Part 2 - Steel Pipe Fittings) (Q3) MSE Exemption for Years of Experience and Turnover
Steel Bookcases-IS:7761 (Q3)
Computer Printer (V2) (Q2), Multifunction Machine MFM (V2) (Q2) MSE Exemption for Years of Experience and Turnover
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6490124 Dated : 24-07-2025 Bid Document 1/11 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Monthly Basis Cab & Taxi Hiring Services - MUV; 2000 Km x 312 Hrs; Outstation 24*7
Customized AMC/CMC for Pre-owned Products - CAMC for the existing Miniature yard layout including miniature points and crossings signals track circuits axle counter points machines and life size VDURRI panels for four Model Stations in Model Room at ..
Strengthening of BT Road at Ward No.1 Solangapalayam pallam Street West 1, Ward No.09 Karumandampalayam Erode to Karur Main Road to Subarayampalayam , Ward No.13 Vattakkalvalasu Chinna Vayikkal to Railway Gate , Ward No.15 Nathamedu Raiway Gate to C
Supply of Iron and Steel Materials, fabrication, erection of Structures, erection of equipments, providing earth bore, earth mat etc. for extension of new EHT supply for 7500 KVA at 110 KV at 110 KV level to Railway Traction SS at Thalaivasal
Preparation of Detailed Project report (DPR) for the construction of Elevated Corridor from the Anna Statue to Trichy Railway Junction in Trichy at Km 316/6 to Km 322/0 of SHU 9 (including West Boulevard road of Trichy City Corporation).
Construction of Road Over Bridge at Km 0/2 of Sedapalayam Vaikkalpalayam Town Panchayat road branching at Km 2/6 of the road from Kamanaickanpalayam Annur road to Vadukankalipalayam at Railway Km 457/9-11 in lieu of existing Level Cros
Removal of silt , slush from all the storm water drains in Coal yard upto ETP Sump, from Wagon tippler MCC room upto railway track, all drains around PCH, SCH, Dozzer shed, Junction towers etc and Clearing the jungle from CH
Strengthening of BT Road at Kasipalayam Erode karur main road to Railway road, Erode karur main road to PWD road, East street to Bhagavathiamman kovil back side, Bhagavathiamman kovil back side to PWD Vaikkal bridge, Mettukalam vinayakar kovil to Bor
Designing Software (V2) (Q2) ( PAC Only ) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In ... SOUTHERN RAILWAY , ...
hand held metal detector - security metal detector (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), ... DIVISIONAL RAILWAY MANAGER, ... SOUTHERN RAILWAY , ...
Removal of accumulated fly ash silt from all the storm water drains around Silo ,Drains from Silo gate to CHP Gate, Drains from Wagon tippler MCC room upto railway track, all drains around PCH, SCH, Dozzer shed, Junction towers etc in MTPS-II
Providing Load Bearing Drain on Valayapatti side Balance work in the Main work of Construction of Road Over Bridge at Km 0 8 of Sholavandhan Valayapatti Road via Andipatti in lieu of existing LC No 346 at Railway Km 473 600 700
Stub setting concreting Supply erection of tower parts, stringing and dismantling of existing towers for conversion of existing 230kV SC line Kilpauk Korattur and Manali Korattur feeders in to DC line on DC towers in between Loc 09 to 14 for railway
EWE, stub setting, concreting, Supply, Transport and Erection of towers from Locn No. 5A to 6A with line fittings for deviating the ongoing 110 KV SC line on DC tower from existing Thalaivasal 110/22 KV SS to the proposed Thalaivasal Railway Tra
Monthly Ambulance Service (All Inclusive) - All inclusive service; Type C Basic Life Support Ambulance; Single Stretcher Premium Van; Force Traveler Ambulance
Custom Bid for Services - Cost of Labour charges semi skilled in 12Hrs shift towards 02 Nos of Care takers per day to supervise the overall work call serving arranging subsidized meals to running staff Housekeeping per day, Custom Bid for Services - ... by Railway to ...
Providing Side Drain and Service Road by using Paver Block for the work of Construction of ROB at Km 147/ 8 of NH 47 (Madurai - Kanniyakumari section) in lieu LC No 18 of Railway Km 27/500-600 between Tirunelveli Junction and Yard in Tirunelveli.
Providing Service road Drain Painting and Road Furniture in the Main work of Construction of Limited Use Subway at km 0-4 of Dindigul Gujiliamparai Karur road in lieu of existing LC.No.6 at Railway km 3 100-200 in between Din and Akkaraipatti
Replacement of 33 KV 3X400 sqmm cable of existing 33 kv walajabad feeder fed off from 110 /33 -11 kv kanchi ss in b/w kpm Arakkonam at Railway Crossing Karupadaithatadai Village from the location 36/600 to 37/700 KM in Ashoknagar section
Providing Service Road Foot path cum Drain and Road Furniture in Jeyaraj road side and Tuticorin road side for the work of Construction of ROB at Km 132 6 of Madurai Tuticorin road in lieu of existing L.C.No.485 at Railway Km 651-12-13
Shifting of existing 11KV HT/LT OH lines into HT /LT UG Cable and Shifting and Conversion of Conventional Structure into 11KV RMU due to provision of Railway Crossing Subway Bridge at RadhaNagar in the main work of Cons of LUS lieu of LC27 Chromepet
Providing Side Drain and Service Road by using Paver Block in Kovilpatti side for the work of Construction of RUB at Km 40/2 of Paruvakudi-Kovilpatti- Ettayapuram- Vember Road (SH-44) in lieu LC No.439 of Railway km 587/ 6-7 between Kovilpa