Loading…
Loading…
2,742 results • Best match
Construction of approach road to 1) ROB in Km 311/600 to 312/400 of Old NH-7 road for Railway bridge No.773 2) ROB in Km to 0/100 to 0/900 of Armoor - Bheemgal road for Railway Bridge No.771 in Nizamabad Dist of Telangana State. Sub Work: Construction of Drains and Toilet blocks in Km 0/100 -0/900 on Armoor-Bheegal road
Manufacturing, Supply, Delivery Laying Over the Proposed Railway formation of 3000mm dia MS Pipeline fabricated with 18mm thick MS plate along with required specials in place of existing 3000mm dia Godavari water supply Phase-1 trunk main from Murmur ... Proposed Railway line ...
Manufacturing, supply, delivery and laying over the proposed Railway formation of 3000mm dia MS pipeline fabricated with 18mm thick MS plate along with required specials in place of existing 3000mm dia Godavari Water Supply Phase-I trunk main from ... proposed Railway line ...
LIQUEFIED PETROLEUM GAS (LPG) FOR METAL CUTTING GAS AS PER IS:4576/1999 (Reaffirmed 2009) FILLED IN 19 Kg CAPACITY FIRMS CYLINDER ON DOOR DELIVERY BASIS AS AND WHEN REQUIRED BY SSE/C&W/DKJ. THE CYLINDER WILL BE RETURNED AS AND WHEN BECOME EMPTY, BY ... BY RAILWAYS TO ...
LIQUEFIED PETROLEUM GAS (LPG) FOR METAL CUTTING GAS AS PER IS:4576/1999 (Reaffirmed 2009) FILLED IN 19 Kg CAPACITY FIRMS CYLINDER ON DOOR DELIVERY BASIS AS AND WHEN REQUIRED BY SSE/C&W/RDM. THE CYLINDER WILL BE RETURNED AS AND WHEN BECOME EMPTY, BY ... BY RAILWAYS TO ...
LIQUEFIED PETROLEUM GAS (LPG) FOR METAL CUTTING GAS AS PER IS:4576/1999 (Reaffirmed 2009) FILLED IN 19 Kg CAPACITY FIRMS CYLINDER ON DOOR DELIVERY BASIS AS AND WHEN REQUIRED BY SSE/ C&W/RDM. THE CYLINDER WILL BE RETURNED AS AND WHEN BECOME EMPTY, BY ... BY RAILWAYS TO ...
LIQUEFIED PETROLEUM GAS (LPG) FOR METAL CUTTING GAS AS PER IS:4576/1999 (Reaffirmed 2009) FILLED IN 19 Kg CAPACITY FIRMS CYLINDER ON DOOR DELIVERY BASIS AS AND WHEN REQUIRED BY SSE/ C&W/RDM. THE CYLINDER WILL BE RETURNED AS AND WHEN BECOME EMPTY, BY ... BY RAILWAYS TO ...
Laying of CC Road from existing CC Raod at Charminar Hotel at main Road to towards railway Gate Road in Ward No.8 in Shadnagar Municipality under SFC 2015-16
Construction of Four Lane ROB in Zaheerabad Town lieu of LC no. 32 at Railway km. 60/10-11 of Vikarabad-Parli Section in Medak District (Newly formed Sangareddy District
O&M Emergency Restoration to Super Passage on Feeder Channel over Railway track at Km 3.19 from Mahasamudram tank, Nachupally (V), Kodmial (M), Jagtial District, proposed under RAT joint Inspection.
Construction of RUB in lieu of Lc.No.71 at railway km 406/4-6 of kazipet-vijayawada junction in km 0/2-4 of neckonda-Ingurthy road in warangal district.
De-stilting of Kodipunjula vagu with Hydraulic excavator from Railway Track Kunavaram Gate to 100 Bedded Govt.Hospital over a strtch of about 3.00 Km of Manugur(M), Bhadradri Kothagudem District.
Remodeling of 600/450mm dia RCC NP3 pipe line from main road to park in Railway Employees Colony and sub lanes in ward no.133, Macha Bollarum (Item No.9)
Heightening of existing causeway on Kodipunjula vagu at Kunavaram Railway gate in Manuguru area, Bhadradri Kothagudem Dist. T.S. (inviting under earmarked works contractors belonging to SC Community only are eligible)
Laying of Footpath with chequred tiles at New Real Bhavani Nagar near Talabkatta Railway Track in 34-Talab Chanchalam division in Santosh Nagar Circle-7, CRZ, GHMC Rs. 11.25 Lakhs
Development and Maintenance of Multi Level Avenue Plantation(MLAP) at RUB(Railway Under Bridge) to Hafeezpet Road Circle-23, Moosapet, Kukatpally Zone, GHMC during the year 2021-22.(1st recall)
Construction of RCC Box drain (1.50 Mt x 1.50 mt) from satya meals to existing box drain at BHEL railway gate in ward no.134 alwal circle 27.(2nd call)
Annual Manual Desilting of S.W.Drains from Railway Track to St.Anns School Goutham Nagar, Division No.141,GHMC(for the year 2018-19)(3rd Recall)(Reserved for SC/ST/Vaddera Societies)
Annual Maintenance contract for Support services for maintenance of Administrative group of buildings, Blocks and Buildings in Factory area, Railway lines, periphery fencing, Internal and External water supply, Horticulture etc.
Construction of Retaining wall for Nala From Railway track to existing culvert at GSR Enclasve (left Side) (Beside Kutiya Temple),of Ward no:- 133, Alwal Circle-27, GHMC. (6th call)
Construction of C C Drain from Midigonda Madhu (H) to Existing Culvert Beside Railway Track @ Anatharam Main Road at Ward No.14 in Mahabubabad Municipality Under LRS Fund 2017-18.
Repairs to existing damaged compound wall and installation of new gate fathima nagar railway gate and catch pits maintenance in ward no-46 Falaknuma ward,Falaknuma circle-10,GHMC(Recall)
Laying of RCC pipe line at RK PURAM FROM Aroma bakery to railway culvert in ward no.136,Neredmet changed the site to Defence colony at 36-103/10 Malkajgiri
Hiring of 1No 6KL Tractor trolley sprinkler for dust suppression 10 hours availability per day for a period of 3 years use from KOCP to Thadikalapudi railway siding Yellandu Area.
Raising and maintenance of Open Space ( North Lalaguda, South Lalaguda and Chilkalguda Railway Open areas) Plantations under TKHH-2021-22 in Circle-29, Sec'bad zone, GHMC during year 2021-22.
Laying of precast slabs and repairs of open nala from railway culvert 47 to zaheer kirana farooq nagar in Falaknuma divn (1st Recall) (RESERVED FOR ALL SC INDIVIDUALS/ PROPRIETORSHIP FIRMS)
LAYING OF C.C. ROAD USING VACCUM DEWATERING CEMENT CONCRETE FROM RAILWAY TRACK TO KAKATHIYA NAGAR MAIN ROAD IN WARD NO. 137,VINAYAK NAGAR,MALKAJGIRI IRCLE,SECUNDERABAD ZONE, GHMC (1st Recall)
1st year maintennce of TKHH Plantation (Avenue plantation) at Railway over bridge, My;ardevpally to Bandlaguda (800 nos) in Cir-XI, Charminar Zone, UBD, GHMC for the year 2019-20
Carrying out Electrical works and providing air conditioner at Manoranjan Complex-Gandhi Bhavan, at CBI Courts Complex-Nampally, at Railway Complex-II MM, Prathibha Bharathi Building-Red Hills. (2nd Call).
Maintenance of Central Median from Aramgharh railway track to Mylardevpally "Y" Junction Traffic Island at Aramghar Junction in Rajendranagar in Cir-XI, South Zone, GHMC for the year 2017-18
Laying of rcc pipe line at sp nagar near high tension pole parallel to the railway line till sai baba temple, ward no.140,malkajgiri circle - 28 of ghmc, sbz
Construction of Storm Water Drain from H.No.3-63/2 to H.No.3-62 along railway track from existing RCC drain in Malkajgiri Ward No.140, Malkajgiri Circle-28, GHMC.
1st year maintenance of TKHH institutional plantations at North Lalaguda, south lalagula ad chilkalguda railway Open areas in circle-29, SCZ GHMC for (12) months during the year 2022-23.
Construction of CC Drain from Cherukuri Laxmi (H) to Railway Track beside Double bed room in ward no 01 Reserved for SC's As per GO MS No.59. dted: 21.05.2018
Extension to the CC pathway in between track 3&4 line i.e from RLS-1 to dead end at KCHP Railway siding(Phase-II), Manuguru Area, Bhadradri kothagudem(DT), T.S.
Development of Park at Keshampet Road Railway Gate near Ande Pailaiah house LP NO.184/88 10 percent Land in w.No. 22 in Shadnagar Municipality under 14th FC 2017-18
Renovation of Greenery at Mylardevpally Central Median fro Durganagar Signal to Aaramghar Railway Bridge in Ward No.59, Circle-11, Rajendranagar, Charminar Zone, UBD, GHMC for the year 2024-25
Laying of CC road with Vibrated Disc at backside Masjid E Saleema Khatoon near railway track in 34-Talab Chanchalam in Santosh Nagar Circle-7, CRZ, GHMC Rs.36.80 Lakhs
Construction of Retaining wall for Nala From Railway track to existing culvert at GSR Enclasve (right Side) (Beside Kutiya Temple),of Ward no:- 133, Alwal Circle-27, GHMC. (3rd call)
Attending of CC Road patches from CSI Church to Railway gate and old Sai baba temple road in kamareddy municipality under General Fund/SFC/Other Fund ( Reserved For Labour societies )
Procurement of water supply material such as Pumpsets,Making Interconnections,Chemicals and Rehabilitaion of old pipelines at Rakasipet,Ambekar chourastha,Railway gate in Bodhan town under 15th FC tied Grant
Supply of Innoculum (Anaerobic-Bacteria for Bio-Toilets of Indian Railway coaches). Make: As per RDSO specification No. RDSO/2013/CG-12, latest revision/Amendment. Note:Packing in 50 Litres returnable
SUPPLY OF UNDERGROUND RAILWAY POLYTHENE INSULATED JELLY FILLED TELECOM 6 QUAD CABLE 0.9 MM DIA FOR SIGNALLING & TELECOM INSTALLATION AS PER RDSO SPECIFICATION NO. IRS:TC-30/2005, VERSION-1 , AMENDMENT
SUPPLY OF UNDERGROUND RAILWAY JELLY FILLED 06 QUAD CABLE 0.9 mm DIA AS PER IRS SPECIFICATION No IRS:TC 30/2005 (Ver-1) (Amd 1 to 5) OR LATEST, IF ANY.
Cable Jelly filled underground telecom 6 quad, 0.9mm dia Railway signal and telecom copper conductor cable to Specn. No.IRS.TC/30/2005 Ver.1 with amendment 5 or latest. Make/Brand:GEEL
Battery operated portable handheld marking machine, Specification and accessories (1) Machine should be of portable/handheld type and suitable for marking on railway axle face and hub of wheel disc. (
PVC INSULATING CABLE FOR RAILWAY SIGNALLING HEAVY DUTY UNDER GROUND UNSCREENED ARMOURED WITH GALVANISED ROUND STEEL WIRE AND THE CONDUCTIVITY OF PLAIN SOLID ANNEALED HIGH CONDUCTING COPPER EACH WITH N
UNDERGROUND RAILWAY JELLY FILLED 06 QUAD CABLE 0.9 mm DIA AS PER IRS SPECIFICATION No IRS:TC 30/2005 (Ver-1) (Amd 1 to 5) OR LATEST, IF ANY. Make Brand:GEEL
PVC INSULATED CABLE FOR RAILWAY SIGNALLING HEAVY DUTY UNDER GROUND UNCREENED ARMOURED WITH GALVANISED ROUND STEEL WIRE AND THE CONDUCTORS OF PLAIN SOLID ANNEALED HIGH CONDUCTIVITY COPPER EACH WITH NOM
Supply of Indian Railway Logo (Crest) Dia.- 14 Inch, Vinyl, Plastic coated as per attached drawing ( NR DRG No. CC26145). Sample should be approved by the consignee before bulk supply.