Loading…
Loading…
8,981 results • Best match
Supply , fitting & fixing of OSOP Kisok with locking mechanism available at 7 Nos Railway Stations over Asansol Division (Suiri, Kajoragram, Pandaveswar, Jamtara, Giridih, Baidyanathdham & Simultala)
Supply of various markers made on 3 mm thick ACP sheet as per Drg no-19 D10 of indian railways signal manual June 2021 1. A Marker qty-500 nos 2. G marker qty-1000 nos 3. P marker qty-1000 nos Note:
Supply of 48 V/ 25 A SMPS based power plant for Indian Railways Telecom Equipment with FR/FC module with RDSO/SPN/TL/23/99 (Ver 4) Amd-1 or latest in (2+1) configuration of SMPS modules of 25 Amps eac
collection and disposal from PF no 11; Mathura Junction Railway Station, Cleaning, Sanitation and Disinfection Service - Outcome Based - Public Transport Places; Cleaning dusting and disposal of waste from COP SHED of all PF area; Mathura Junction ... Junction Railway Station , ... Junction Railway Station , ... Junction Railway Station , ... Junction Railway Station , ... Junction Railway Station , ... Junction Railway Station , ... Junction Railway Station , ... Junction Railway Station , ... Junction Railway Stat..
Tiranga Lighting Work From Shubhash Tiraha to Railway Station at Shikohabad Under CM Tourism Development Participation Scheam in Distt. Firozabad (U.P.)
Gonda Bahraich marg par Gangadham railway station ke poorvi Dagra se mansharam purwa hote huye shuklanpurwa wale marg par punarnirman karya.
Construction work of CC road from Railway Station Road to in front of Naveen Lal Srivastavas house in Ward No 6
Renewal Work of Handia Lakchagreh Road ke KM-1 To Handia Railway Station Via Jaguwa Sodha KM-2 Tak Link Road.
CC Work in Abadi Parts of Atrauli to Atrauli Railway Station Road ODR km 3 4 8 9 Under Special Repair
Special repair work of the road from Km 2 of Kidiharapur Fatehpur road to Kidiharapur railway station on the right side
WARD NO 09 RAILWAY STATION KE SAMNE MADHAV BHOJNALAY SE S.P. PARTY KARYALAY KI OOR R.C.C. NALA AVAM PULIYA NIRMAN KARYA
Street Light work from Chaukaghat over bridge tiraha to city railway station and Khirkiyaghat to Padaw Chauraha via Rajghat Bridge, Varanasi.
Renewal of Misrikh Railway Station via Gaurihar- Mareli- Loknapur- Raghunathpur Aini - Nagwapetty up to Km 08 of Jarigwa Brahmavali ODR marg
CONSTRUCTION OF INTERLOCKING ROAD AND DRAIN AT SWASTIK STATE CHAKERI RAILWAY STATION ROAD TO SWASTIK CHAKERI STATION ROAD TO SWASTIK STATE.
Special repair work by CC in the populated area of Km-1 of Jamrahi Canal Bridge to Kathara Railway Station road.
Special Repair work at Dadri Jarcha Road to Khandera Kot Bridge via Veerpura to Ajaibpur Railway Station Road in District Gautambudhnagar
Construction of Special Reparing work with P.C., Seal coat at CHARKHARI RAILWAY STATION to SWANSAMAAF ROAD in Km. 4 and 5
KASIMPUR KHEDI MAI IQBAL PUTRA BALBIR SINGH KAY MAKAN SAY RAILWAY STATION KI AUR JANAY WALE MARG PAR CC ROAD NIRMAN
Special repair work of Meerut Hapur Road to Kaili railway station contact route For agricultural marketing facility in sugar mill zone
Work of shifting the distribution transformer and pole/line installed near the railway station Modinagar under the Electricity Distribution Division Modinagar.
Renewal of Bisauli Aonla Rod to Manakpur and Karaingi Railway Station to Gram Yadpur Link Road Under General Repair 2021-22
Work No-03 Ward No. 21 Road renewal work along with general repairs by BC from Shadipur intersection to railway station.
Rectification of Blackspot no-75-2016 and 2019 at Malhour Railway station road on recommendation from IIT Delhi (Road signage work)
Work no-5 chata me NH-19 se chata railway station tak jane wali sadak par interlocking road ka nirman karya
Deposite Work of Railway Station Near Malgodam Existing L.T. Overhead Line Changing in Underground Line Under Area of EDD-I, Ltp
Repair work of damaged road from Sahibabad Railway Station Cut G.T. Road Light to Girls Hostel in Ward-60, Shyampark Main.
Supply and Installation of OSOP Mobile Kiosk as per attached Design of National Institute of Design Ahemedabad. Location :- Sonbhadra Railway Station
Electrification of proposed constructed Signal building and other allied works etc in connection with Electronic Interlocking of Yard at Railway Stations i.e. Khalilabad, Maghar and Jagatbela.
Construction of 2 lane R.O.B. in LIEU X-ING No-7C at KM 846/23-25 on Near Saiyed Sarawan Railway Station of North Central Railway on Pry-CNB
Construction of 2 lane R.O.B. in LIEU X-ING No-32C at KM 890/13-15 on Athsrai Railway Station of North Central Railway on Pry-CNB Section in
Custom Bid for Services - Hiring of private road truck 7 point 5 MT for collection of Rly material stores from whole Indian Railway s various location of whole Indian Railway s Units as Stores depots workshops other Rly organization Pvt firms to ... by Railway Goods ... whole Indian Railways Units ... other Rly .. ...
Construction of R.E. Walls and Related Structure of 2 Lane R.O.B. At Level X-ing No. 255 Mathura-Bharatpur Rail Section Km 1200/12-14 (Near Jajanpatti Railway Station) on Mathura-Bharatpur Road to Govardhan Road Dist Mathura
Mathura baraily roadvej bus stand se laxmiganj road hathiget o gandhi murti se railway station tak pevar mashine dwara Davarikaran karya
TOOL KIT BAG as per technical specificat [TOOL KIT BAG as per technical specification and design attached for all Keymen, Keyman Companion, Patrolmen (Monsoon), static watchmen (during monsoon) and Night patrolmen (Emergency patrolling on station) in ... of Indian Railways &
Custom Bid for Services - Mechanized Cleaning and Housekeeping work of Barabanki Railway Station for 03 years Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
Custom Bid for Services - Mechanized Cleaning and Housekeeping work of Shahganj Railway Station for 03 years Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
FL-MAILANI NEAR RAILWAY STATION
Construction of 2 Lane Railway Over Bridge in lieu of Railway Crossing No.29-B at Km. 801/17-19 on Mugalsarai-Prayagraj Rail Section of NCR in between Karchhana- Bheerpur Railway Station in District Prayagraj
WARD NO- 01 CONSTRUCTION OF INTERLOCKING PATHWAY BOTH SIDE FROM KAWAD PATH ROAD TO RAILWAY STATION N.P. AGWANPUR. (L- 400 m)
Kundanpur Shelter Home evam Railway Station Shelter Home me Wall Tiles, Floor Tiles, Ceiling Fan, Rajai-Gadde evam marammat ka karye.
Ward no. 05 me Adil Cement Store se railway station tak interlocking road va U-type RCC naali ka nirmaan karye.
Augmentation of IPIS (CGDB, TIB along with GPS clocks) at Shahganj & Restoration of IPIS (CGDB, TIB along with GPS clocks) at Shahganj & Akbarpur Railway station of Lucknow Division, Northern Railway.
Work of concrete patching of big potholes on Block Marg, Malviya Marg and Railway Station Marg under Municipality (by Hot Mix Plant)
Construction of 8 seater toilet for public purpose in front of police club on road going from bus stand to railway station.
Work of installation of advertisement cutouts on rent/contract on the Street light pole from Dakshin Darwaza Chauraha to Railway Station Chauraha
Laying of Right Side interlocking tiles Side Patri At Najibabad Road Showroom Bazar India to Hotel Rajat Residency (Railway Station Chouraha) Bijnor
G.T. Road se Varanasi Railway Station ke nav nirmit III pravesh dwar tak marg Mal Godam Road ke vishesh marammat ka karya
Construction of a covered drain in Ward No 1 of Unchahar Nagar Panchayat from the railway station to Akhtar Babu boundary gate
RCC PILLING WORK IN FOUNDATION AT 02 LANE ROB ON LC 156A ON DARIYABAD SAIDKHANPUR RAILWAY STATION IN DISTRICT BARABANKI UTTAR PRADESH
Construction of Link Road from Bhatpar Railway station to Jawadih Dhanouti via Pachokhar in District Deoria under R.S.N. (Ch 0.000 to 1.900 )