Loading…
Loading…
8,413 results • Best match
Liquid Soap Dispenser (V2) (Q3)
Thermal Paper Roll (Q4)
Industrial Safety Helmet (V2) as per IS 2925 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/6135096 Dated : 15-04-2025 Bid Document 1/7 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 15 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Startup, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to their meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Silicone sealant (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6345327 Dated : 25-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 20 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Stainless Steel Pole Mounted Stainless Steel Dustbin (Q4)
Tissue Papers (V2) (Q4)
AMC for Maintenance of Railway Track of DCC Take- off Point at Janai Road Station to Buffer Point Inside D.C.C Near Central Laboratory Building with Bush and grass cutting and also tree treeming in side plant for 1 Year
Patch repairing works fo G T road to Talandu Railway station Road from 0.00km to 1.43km in stretches under Chandannaqar Hwy. Sub Division of Hooghly Hwy Divn No ll in the Dist of Hooghly during the year 2023 24
Maynaguri to Changrabandha (Upto Indira More), Maynaguri Railway Station to Mng Town upto NH-31 and Maynaguri to Burnish road from chainage 0.00kmp to 1.40km, 0.00kmp to 2.00kmp and 0.00kmp to 2.60km respectively for emergent repairing of Potholes an
Restoration of underground drinking water distribution pipeline due to construction of road over bridge at Urma - Barabhum Railway Station in place of level crossing Gate No 40 J.C. on 1st km of Balarampur - Bagmundi Road by Purulia Highway Divisio
Emergent Post-monsoon patch repairing work of different stretches at Ramkanali Railway Station to Panchet Dam Road from 4.00 KM to 10.00 KM by providing patching pot holes repairing potholes and 20mm premixed carpeting work of RNPUR Sub-Division
Maynaguri to Changrabandha (upto Indira More), Maynaguri Railway Station to Mng. Town upto NH-31 and Maynaguri to Burnish road from chainage 0.00kmp to 1.40km, 0.00kmp to 2.00kmp and 0.00kmp to 2.60km respectively for emergent repairing of potholes a
NH 34 to Sajanpara (Sujnipara) Railway Station Road from 0.00 kmp to 1.80 kmp, Patch Repair (Bituminous Potholes, W.B.M. covered by 20 mm P.C. and seal coat in stretches) under Raghunathganj Highway Sub-Division of Murshidabad Highway Division No.I
Restoration of underground drinking water distribution pipeline due to construction of road over bridge at Urma - Barabhum Railway Station in place of level crossing Gate No 40 J.C. on 1st km of Balarampur - Bagmundi Road by Purulia Highway Divisio
Development of Footpath and Drain of Gurudasnagar Railway Station to Diamond Harbour Road from 1.00 Kmp. to 2.85 Kmp. in stretches under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Additional Laying Distribution system of pipe line and its allied works due to construction of ROB near Haur Railway Station for Haur Water Supply Scheme in Panskura Block within Tamluk Sub-Division under Tamluk Division, PHE Dte, Purba Medinipur.
INJ. FULVESTRANT 250MG IN VIAL/PFS. (Product should be available in the approved product list of railway board.)
Tab./ Cap. Clomipramine HCl 25 mg. (Product should be available in the approved product list of railway board.)
Construction of Bituminous road from Kalna Railway Gate to Dumpsite and near Kalna SDO Bunglow under Kalna municipality
Construction of PCC road from natun pukur towards railway line at sundrabandh Jl no-95 Plot -1053,1060,1063 (PS92)
Colouring and beautification work of Iswar Gupta Park, Ganesh Park and besides Railway Workshop at Ward No. 6.
Improvement of Bituminous Road (R.C Path) From G.P Road to Railway Gate No-20, at Ward No. 13
Coal into wagons by payloader at Nimcha Railway Siding under Nimcha Colliery,Satgram Area during FY 2020-21
Annual Maintenance Contract of 04 Nos. EOT Crane at Diesel Shed, Eastern Railway, Howrah For 02 (Two) Years.
Tab. Isosorbide 5 Mononitrate 20 mg. (Product should be available in the approved product list of railway board.)
Construction of concrete road for Coal Transportation Khottadih Colliery upto Selected Samla Railway Siding under Pandaveswar Area, ECL
Construction of road from Rajbandh Bus Stand to Rajbandh Railway Gate under Kanksa Block of Paschim Bardhaman District
Repair of path with kota stone and railing Gandhi road to village near railway quater, ward no11, Darjeeling
Construction of approach road (length 400 m approx.) at Bhanora Railway Siding (Including 5 (Five) year of maintenance)
Construction of drain starting from Basak Para pond to Nikashi Drain at Railway siding under ward no.32
Improvement of Bituminous Road from Railway Gate No. 19 to Ichhapore Canal at Palta, Ward No.-9 10
Repairing and Maintenance of Coal transportation road from NH60 to Darul Bandh Railway Siding under S B Project
UPGRADATION OF CONCRETE ROAD FROM RAILWAY TRACK TO THE HO NEPAL DAS AT RAMPUR UNDER SONARPUR II GP
Tree Felling at Kumardihi A Colliery for the construction of Railway Corridor from Ukhra to Jhanjra Project Colliery
Construction of road from Kathalgacchi Bridge To Nimo Railway line Kalitola under MEMARI-I Block, Length-1.14 Km
Supply of P-Way Track Fittings for day to day maintenance of Captive Railway System of DVC, MTPS
Fishing rights in Railway Loco tank at Maharajpur in the section of Assistant Engineer/Sahibganj of Malda Division.
Fishing Rights in Railway Tank at Barharwa in the section of Assistant Engineer/New Farakka of Malda Division.
25KV OHE Modification in connection with Extension of FOB at PNE station in Howrah Division of Eastern Railway.
Electrical (General) work in connection with "Renovation of Railway institute at BDC, BWN, AZ, RPH under Howrah division".
Electrical (General) work in connection with "Renovation of Railway institute at BDC, BWN, AZ, RPH under Howrah division".
Inj. Triamcinolone 40mg/ml 1ml Vial. ( Product should be available in the approved product list of railway board.)
Digitization and certification of Land Plans in Nadia District and Murshidabad District in Sealdah Division of Eastern Railway.
Repairing work of Coal Transportation Road from Hazratpur market end to Railway Siding entrance, Birbhum, WB 2nd call
Loading of coal into Railway Wagons by Pay Loader at POCP II siding, Pandaveswar Area for One year
Repair of Bituminous road from 19 no. Railway Gate to Santinagar More at ward no - 9 and 10
Repairing and maintenance of earthen road from railway underpass at Naktidih road to old intake pump house, Bhojudih.
Construction of Ladies and Gents Toilet and Urinal for the Extension of laikdih Railway siding C V Area
Construction of C.C Road from Railway Bridge to Majhipara in ward no -02 under Paray Samadhan programme. (PBD190)
Construction/ repair of Bituminous road from 20 No railway gate to Shree Bhumi Bridge at ward No- 7