Construction of ROB on LC 88 on Rewari-Bhatinda Railway Line at Km 135/4-5 on Hisar Satrod road to Southren Pheriphery Road along Balasmand Distributory Hisar (CM Announcement No. 22926 dated 21.08.2018 ) (Shifting of 11 KV and LT Line only)
PROVIDING 200 KVA, 100 KVA TRANSFORMER AND HT/LT LINE AND ALL OTHER ELECTRICAL WORKS AT SWIMMING POOL IN SPORTS COMPLEX SECTOR-10 U/E AMBALA. (INCLUDING SIX YEARS DEFECT LIABILITY PERIOD FOR TRANSFORMER AND THREE YEARS FREE MTC. and DEFECT LIABILITY
Job No. 69.25 Providing LT line and 72 Watt LED Street lights in Convenient Shop Sector 4PII, Hisar and all other works contingent thereto including one-year mtc and defect liability period free of cost. Rate taken in DNIT are excluding GST.
Creation of one (1) no. 33 KV bay at 132 kv substation Beholi to accommodate 2nd CKT of 33 kv line for 33kv substaion Beholi in FY 2022-23.
Providing 33 kv line bay to feed 33 kv substation Mandi CKT-II at bay D-2 (back to back ) along with allied equipments at 132 kv substation Naultha
HVPNL has decided to creation of 01 No. 33 kV line bay at 132 kV Sub Station Garnawati for feeding of proposed 33 kV Sub Station Sector-25, Rohtak
Scope of work includes creation of one no. 33 KV line bay with allied equipments at bay D11 by extending 33 KV bus bar from bay D9 to D12.
Construction of external roads and providing and laying external SWD Scheme in Sector-14P-I and Sector-33P-I, Hisar.Shifting of existing 11 KV HT line and 200 KVA Transformer in disposal in Sector-14P-I at Hisar and all other works contingent t
Implementation of LRP Works under RDS Scheme in Hansi Divn (Package-1 consisting City, Sisai, Umra and Mundhal S/Divns.) of Hisar Circle
Implementation of LRP Works under RDS Scheme in City Gurugram Divn (Package-2 consisting IDC and Kadipur S/Divns.) of Gurugram-I Circle
Implementation of LRP Works under RDS Scheme in S/U Sirsa Divn (Package-3 consisting Jeevan Nagar S/Divn.) of Sirsa Circle
Implementation of LRP Works under RDS Scheme in Greater Faridabad Divn (Package-3 consisting Chhainsa and Tilpat S/Divns.) of Faridabad Circle
Implementation of LRP Works under RDS Scheme in Greater Faridabad Divn (Package-1 consisting Badrola S/Divn.) of Faridabad Circle
Implementation of LRP Works under RDS Scheme in Greater Faridabad Divn (Package-2 consisting Kheri Kalan S/Divn.) of Faridabad Circle
Implementation of LRP Works under RDS Scheme in City Gurugram Divn (Package-1 consisting New Palam Vihar S/Divn.) of Gurugram-I Circle
Special estimate for levelling and gravelling of 33kV line bays at 220kV S/stn Samalkha HVPNL Panipat.
PROVIDING 100 KVA TRANSFORMER AND HT LINE FOR NEWLY BORE TUBE WELL IN PLOT NO. 686P SEC-21 AND BOOTH NO. 5 PARK FACING SEC-26 U/E PANCHKULA. INTERUNIT JOB OF E-II HSVP PANCHKULA. (INCLUDING ONE YEAR FREE MTC./ DEFECT LIABILITY PERIOD FREE OF COST).
Shifting of HT line passing over the plateform in front of stone shops No. 1 to 13 in steel stone market at MTS Bhiwani. and all other works contingent thereto. Including one year mtc. and defect liability period, free of cost. Rate taken in DNIT are
For Creation of 01 No. 33 kV line Bay at 220 kV substation Batta by HVPNL accommodate 33kV substation Chausala (25MVA) in F.Y 2023-24 during the FY 2024-25
Providing additional transformer and HT line in Sector 7 at Jind. Shifting of 200 KVA Transformer and HT line coming in the road alongwith shopping centre in Sector 7 at Jind
Providing LT line in commercial belt (A), Sector-6, HSVP, Rohtak
SHIFTING OF 200/100 KVA TRANSFORMER ALONG WITH HT AND LT LINE COMING IN THE PLOT PREMISES OF ASHIRWAD NURSING HOME PLOT NO. 1 (BACKSIDE OF SHOPPING CENTRE ROAD) SEC-7 U/E KURUKSHETRA. (INCLUDING ONE YEAR FREE MTC./ DEFECT LIABILITY PERIOD FREE OF COS
Providing balance LT line street light in Sector-14P-II at Hisar. Including years defect liability period of LED mtc. and f operation of LED lights as well as years defect liability period for all other items free of cost. Rates taken in D
PROVIDING HT/LT LINE FOR CONNECTIVITY TO HSVP FEEDER AND REPAIR OF 200 KVA TRANSFORMER FOR BALANCE 6 AND 8 MARLA PLOTS (UNDER POSSESSION) IN SEC-1 U/E TARAORI, DIST. KARNAL. (INCLUDING ONE YEAR FREE MTC. AND DEFECT LIABILITY PERIOD FREE OF COST).
WIDENING STRENGHTENING/ RAISING OF KALANWALI TO RORI ROAD (MDR-101-A) KM. 0.00 TO 25.52 IN DISTT. SIRSA (CM ANNOUNCEMENT CODE NO. 25408 DATED 08.03.2020)(SHIFTING OF HT/LT LINE OF 11 KV RORI-RDS FEEDER, 11 KV DOGRANWALI-AP FEEDER, 11 KV DRAINAGE-AP
PROVIDING AND SHIFTING OF HT/LT LINE CROSSING OF NEW CONSTRUCTED HIGH LEVEL BRIDGE OVER RIVER GHAGGAR AND CONNECTING ROAD FROM DIVIDING ROAD OF SEC-24 AND 26 AND SEC-20 AND 21 AND MULTIFEATURED PARK SEC-24 U/E PANCHKULA. (INCLUDING SIX YEARS DEFECT
4-lanning/ Strenghtening of Karnal Assandh Jind Hansi Tosham Sodiwas road (Section Hansi Tosham road) SH-12 RD 127.68 to 131.08 and 132.10 to 138.68 including 3 Nos. Bridge at RD 128.230, 128.240 and 135.13 (Road ID 5198) (Pdg. Shifting of HT/LT Line
PROVIDING LT LINE IN FRONT OF NURSING HOME CLINIC SITE 1 TO 7 AND LED STREET LIGHT 25 AND 45 WATT ON EXISTING BALANCE PCC POLE AND T-POINTS IN SEC-18 U/E KAITHAL. (INCLUDING THREE YEARS MTC./ DEFECT LIABILITY PERIOD FREE OF COST).
4-lanning/ Strenghtening of Karnal Assandh Jind Hansi Tosham Sodiwas road (Section Hansi Tosham road) SH-12 RD 127.68 to 131.08 and 132.10 to 138.68 including 3 Nos. Bridge at RD 128.230, 128.240 and 135.13 (Road ID 5198) (Pdg. Shifting of HT/LT Line
SHIFTING OF HT/LT LINE OF 11 KV BHATOLI AP FEEDER, 11 KV MAHILANWALI RDS FEEDER, 11 KV JAGADHRI TOWN FEEDER, URBAN FEEDER LINES PASSING OVER THE LAND SEC-22 U/E JAGADHRI. (INCLUDING ONE YEAR FREE MTC./ DEFECT LIABILITY PERIOD FREE OF COST) Recall
SHIFTING OF 9 MTR. LONG OCTAGONAL POLE AND LT LINE WHICH IS COMING IN THE ALIGNMENT OF NEWLY CONSTRUCTED 30 MTR. WIDE ROAD IN SECTOR-4 TRANSPORT NAGAR U/E KARNAL.(RATES TAKEN IN DNIT EXCLUSIVE GST). (INCLUDING ONE YEAR FREE MTC. AND DEFECT LIABILITY
By Providing Widening and Strengthening on GA road to Dhumaspur via Nayagaon Km 0 to 10.03 in Gurugram District (ID 3108 and 3076) (CM announcement Code 25635) (Shifting of HT / LT Line jail ore to Bhondsi via Dhumaspur Rithoj due to road widening wo
SPECIAL REPAIR AND MTC. OF 200 KVA TRANSFORMER AND SHIFTING OF LT LINE EXIST IN THE ALIGNMENT OF DSS, SCO, HOTEL AND SHOPPING MALL IN SHOPPING CENTRE SECTOR-18, U/E KAITHAL. (INCLUDING ONE YEAR FREE MTC. AND DEFECT LIABILITY PERIOD FREE OF COST)
Creation of Two No. 33 KV line Bays at 220 KV S/Stn HVPNL Dadibana to accommodate the feeding of 33 KV S/Stn. DHBVN, Gokal and 33 KV Kheri Battar
Providing 04 Nos. 200 KVA Transformer and HT line in sector-2 Bahadurgarh
Prov. 200KVA T/F , HT line and street lights in sector-10, Bahadurgarh
Prov. 200 KVA Transformers and HT line (B/W) in sector-8, Panipat
Prov. 200KVA T/F, HT line and street lights in Sector-9, Jhajjar
Shifting of 11 KV Sector-23 feeder and 1 No. Transformer and LT line from dividing road of Sector-13 and 23 from City Station (Bhagat Singh) Chowk to Rajiv Chowk at Bhiwani and all other works contingent thereto (Including three year free mtc. and de
SHIFTING OF 3 NOS. 200 KVA /100 KVA TRANSFORMERS AND HT LINE WHICH IS EXISTS IN THE ALIGNMENT OF PLOTS NO. 378-D TO 378-E IN SECTOR-5, U/E, KARNAL. (GST EXTRA ON HSR ITEMS ONLY) (INCLUDING ONE YEARS FREE MTC./ DEFECT LIABILITY PERIOD FREE OF COST)
SHIFTING OF HT POLE AND 300 SQMM 3 CORE XLPE CABLE WHICH IS COMING IN THE ALIGNMENT OF NEWLY CONSTRUCTED 24 MTR. ROAD (UNDER 400 KV LINE) AND DISMANTLEMENT AND RE-ERECTION HT LINE WHICH EXISTS IN THE INSTITUTIONAL SITES AREA IN SEC-32 (PHASE-IV) U/E
Deposite Estimate for providing 33 KV line bay to accommodation 33 KV S/Stn. M/S Alfa International City Karnal at bay D-1 at 132 KV S/Stn. Ramba (Civil Work)
Creation of a 33kV Line bay at the 132kV S/Stn Kurgnagawali to feeding the 33kV S/Stn Surtia.
Annual mtc. of Water Supply Scheme in Sec. 13 P, Hisar. Supply and erection of LT phase separator on LT line, SITC Four pole ON LOAD Manual change over switch in SS enclosure complete in all respect at Boosting Station Sec. 13 P, Hisar and all other
PROVIDING LT LINE AND STREET LIGHTS ON PCC POLES ON SERVICE ROAD IN FRONT OF NIRANKARI BHAWAN AND OPPOSITE TO PLOT NO. 439 IN SECTOR-18 (P-I) AND OTHER ALLIED WORKS CONTINGENT THERETO IN SECTOR-18 (P-II) UE JAGADHRI.. (INCLUDING THREE YEARS FREE MTC.
SHIFTING OF HT/LT LINE AND POLES ADJOINING H.NO. 1551-P, 1552-P AND 1673 SEC-25, H.NO. 501-P, 1371 AND DSIO-01 SEC-26 AND H.NO. 375-P SEC 23 U/E PANCHKULA. (INCLUDING ONE YEAR FREE MTC./ DEFECT LIABILITY PERIOD FREE OF COST).
SHIFTING OF 200 KVA TRANSFORMER IN PLOT NO. 241 P AND HT/LT LINE POLES IN FRONT OF HOUSE NO. 234,397,SEC- 23 PANCHKULA AND LT POLE IN FRONT OF HOUSE NO. 201,482 SECTOR-26 PANCHKULA. (INCLUDING ONE YEAR FREE MTC./ DEFECT LIABILITY PERIOD FREE OF COST)
WIDENING AND STRENGHTENING/RAISING OF KALANWALI TO RORI ROAD (MDR-101-A) KM. 0.00 TO 25.52 IN DISTT. SIRSA (CM ANNOUNCEMENT CODE NO. 25408 DATED 08.03.2020)(SHIFTING OF HT/LT LINE OF 11 KV KALANWALI 3RD URBEN, 11 KV KAMAL-AP AND 11 KV TAKHATMAL-RDS F
Shifting the 11 KV Bichpari AP and 11 KV Mardho Sahib RDS and 11KV Noorpur Ap and existing Lt line due to Utility shifting for the construction of Road Lalayana to Chota Baraula along with bridge on Tangri Nadi in Ambala District (RD Km. 0.00 to 3.0)
Special repair by Pdg. widening upto 7.00 m from RD 0.00 to 1.30 km and 5.50 m from RD 1.30 to 1.95 km and strengthening of Sikri to Harphala road in Faridabad District (ID 3289) CM announcement code 25810 dated 27.03.2022 (Shifting of HT/LT line).