Loading…
Loading…
708 results • Best match
Shifting of 33 KV line/poles of Fatehabad-Bhuna lines passing over the plots of Sector-11, 11A at Fatehabad (Including one year defect liability period free of cost). Rates taken in DNIT are Excluding GST.
DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE AT DIVISION PINJORE BARWALA and RAIPURRANI SUBDIVISIONS OF HARYANA UNDER REVAMPED REFORMS BASED AND RESULTS LINKED DISTRIBUTION SECTOR SCHEME
DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE AT DIVISION KURUKSHETRA PACKAGE A KURUKSHETRA DISTRICT OF HARYANA UNDER REVAMPED REFORMS BASED AND RESULTS LINKED DISTRIBUTION SECTOR SCHEME
DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE AT AMBALA CITY DIVISION UNDER AMBALA DISTRICT OF HARYANA UNDER REVAMPED REFORMS-BASED AND RESULTS-LINKED DISTRIBUTION SECTOR SCHEME.
Widening and strengthening of road from Ganjbar to Rajapur, Distt. Panipat (Shifting of HT/LT line).
New construction of road from Sutana to Bhadar in Panipat District (Shifting of HT/LT Line.
creation of one 33 KV line bay
Empanelment of Electrical Contractors for Supply, Installation, Testing Commissioning of 33 kV lines, 33/11 kV power transformers all other allied material required for augmentation /erection of 33 KV line, augmentation/erection of 33 kV Sub stn
Improvement of road by strengthening on Sirsa- Ludesar - Bhadra road Km 0.00 to 20.50 in Sirsa District. ( Pdg. Shifting of 11 KV line infrastructure length of line app. 1.6 Km in Village Chopta)
Supply of material, erection, testing andcommissioning (including civil works) of new 33x11 kV Indoor AIS substation at Sector 107, Gurugram to be fed from 220x33 kV substation, Sector-107 under Op Circle-I, DHBVNL, Gurugram under RDSS
Replacement of HT and LT line with underground cable in Sainik School Kunjpura Distt. Karnal (Phase-II)
Construction of Kusti Hall at Village Kharar in Distt. Hisar (Pdg. Shifting of HT/LT Line Only)
Pdg. and fixing of 200 KVA T/F and LT/HT line in shopping centre sector-38 HSVP Gurugram
Development work i e Const of road and providing EPHS under HT line in Sector 5 8 UE Karnal
Supply of material, erection, testing an commissioning including civil works of 2 nos. new 33x11 kV Indoor AIS substations at Sehatpur and Sector 91, Faridabad to be fed from 220x33 kV substation, Palla under Op Circle, DHBVNL, Faridabad under RDSS
Providing underground HT cable across the Raiway track and dismantlement of D/C HT line at HSIIDC ,Barhi Phase-III ,Distt(Sonipat)
Site survey planning design engineering supply of material erection testing and commissioning of all items material in all respects required to complete the RDSS works in Package B Sub Urban No. 1 Rohtak under Rohtak District
upply of material, erection, testing commissioning for connectivity by providing 33 kV line (6.1 KM approx) to 9.9 MW Bio Mass Power Plant at Village Alewa from 132 kV S/Stn. Alewa under Op Circle, Jind (On turnkey basis).
Supply of material erection testing commissioning including civil works for construction of 3 no 33 kV substations namely Banbhori under Op Circle, Hisar Pili Mandori under Op Circle Fatehabad and Dalanwas under OP Circle Narnaul on turnkey RDSS
Site survey, planning, design, engineering, supply of material, erection, testing and commissioning of all items/material in all respects required to complete the RDSS works in Package ASonepat Cityunder Sonepat District
Supply of material, erection, testing, commissioning (including civil works) of 4 nos. new 33/11 kV Indoor AIS S/Stns at Sector-79, Sector-84, Sector-86 and Sector-88, Faridabad to be fed from 220/33 kV substation, Sector-78, Sector- 89 under RDSS
Survey of H. T. Line from ITBP Saboli to Sub-Station Kundli and identification of HT Line fault and r
Providing Balance Transformer and 11 KV line in Sector-9 and 11 at Hisar. Including 6 years defect liability period of transformers and 3 years mtc. and defect liability period of other items free of cost.
SHIFTING OF 2 NOS. 200 KVA TRANSFORMERS AND 11 KV LINE CROSSING OVER THE CLINIC SITE NO. 3 AND 4 SEC-8 U/E KARNAL. (INCLUDING ONE YEAR FREE MTC./ DEFECT LIABILITY PERIOD FREE OF COST).
Creation of 1 no. 33kV Line bay at 66kV S-Stn. Taprian to feed load of 33kV S-Stn. Morni by HVPNL in F.Y. 2022-23.
DEVELOPMENT OF DISTRIBUTION INFRASTRUCTURE AT SUB-URBAN SIRSA DIVISION (PACKAGE-4 CONSISTING S/U SIRSA AND NATHUSARI S/DIVNS) UNDER SIRSA CIRCLE UNDER RDSS
Shifting of HT/LT Line due to widening and strengthening of Road Village Babail to Mohali at District Panipat.
Providing LT line on 9 mtr. long PCC pole infront of plot No. 1307-1308 sector-31 HSVP Gurugram.
SHIFTING OF 11 KV LINE UMARI URBAN FEEDER PASSING OVER THE RESIDENTIAL PLOTS OF SECTOR-33 U/E KURUKSHETRA. (RATES TAKEN IN DNIT EXCLUSIVE GST) (INCLUDING ONE YEARS FREE MTC. AND DEFECT LIABILITY PERIOD FREE OF COST)
Providing Undeground 11 KV HT cable line in place of existing overhead 11 KV HT Line at CCS HAU Campus, Hisar
Work for 11 KV HT Line and Street Lighting system for Plot no. 1 to 9 at Transport Hub, IMT Manesar.
Special estimate for creation of one no. 33kv line bay at 132kv S/Stn. Dharsul to feed proposed 33kv S/Stn. Meond kalan in F.Y. 2024-25.
Special estimate for creation of one no. 33kv line bay at 132kv Sub-Station Bhuthan Kalan for feeding 33kv S/Stn. Majra during the year 2024-25.
Site survey, planning, design, engineering, supply of material, erection, testing and commissioning of all items/material in all respects required to complete the RDSS works in Package -B Shahbad under Kurukshetra District
Site survey, planning, design, engineering, supply of material, erection, testing and commissioning of all items/material in all respects required to complete the RDSS works in Package B Kaithal under Kaithal District
Site survey, planning, design, engineering, supply of material, erection, testing and commissioning of all items/material in all respects required to complete the RDSS works in Package -A Bilaspur under Yamunanagar District.
Site survey, planning, design, engineering, supply of material, erection, testing and commissioning of all items/material in all respects required to complete the RDSS works in Package -B Jagadhri under Yamunanagar District
Site survey, planning, design, engineering, supply of material, erection, testing and commissioning of all items material in all respects required to complete the RDSS works in Package A Gulha under Kaithal District
Site survey, planning, design, engineering, supply of material, erection, testing and commissioning of all items/material in all respects required to complete the RDSS works in Package -A Pehowa under Kurukshetra District
PROVIDING LT LINE IN SEC-27 U/E PANCHKULA. (INCLUDING ONE YEAR FREE MTC./ DEFECT LIABILITY PERIOD FREE OF COST)
Const. of CHC with residential accommodation at village Nigdhu Distt. Karnal (Pdg. Street light, Service Cable and LT line only).
Shifting of HT/LT line/pole coming in the alignment of main gate of plots in various sectors AT FATEHABAD
SPL REPAIRS FOR REPLACEMENT OF OH LT LINE TO UG CABLE OF HOSP PREMISES AT MH HISAR UNDER GE HISAR
Shifting of HT line, Transformer and HT/LT conductors, cable passing over the Chowk/T-point in Sec-75 to 89 Faridabad.
Improvement of T-Junction by Construction of Slip Roads at Auto Market Junction Near GJU Hisar (Road ID 11549) in Hisar District. (Pdg. Shifting of 33KV line Hisar)
Site survey, planning, design, engineering, supply of material, erection, testing and commissioning of all items/material in all respects required to complete the RDSS works in Package B Gohana under Sonepat District
Supply of contact wire splicing zig (techno scientist manufacturing company) for Railway Electrification work or similar for contact wire 107 sq mm and made of Stainless steel. -Accepted Make-SSTE.
A/mtc. of 250/400 watt sodium street light points installed on 9/10/11/12 mtr. long GI octagonal pole on dividing road of secor - 81 to 95 and mtc. of existing 11 KV line system HSVP Gurugram.
4 Lanning of Hisar Balasamand road (MDR-107) from Hisar Bye Pass to Village Hindwan Mor RD 3.700 to 11.000 in Hisar District (road ID- 4873) (Nalwa Constituency) (Shifting of 11 KV Line of HAU Old Campus Feeder) RECALL
Supply and erection of electrical materials for converting existing 1875 mtr. Long LT, line to HT line at 8 MLD WTP, HSIIDC, IMT Rohtak