Construction of Civil works for Addl. 20MVA 66/11KV Power Transformer T2 at 66 KV S/S Sarajpur (Balance Works) (Under operation Circle Patiala) (Under RDSS Work)
Stringing and Sagging of 2nd Circuit of 66 KV line from 220 KV SS Handiaya to 66 KV SS Barnala DC on DC Tower Line (RDSS Work)
Construction of Civil works for Agumentation of Power Transformer at 66 kV Substation Ranjit Avenue, Kacheri chowk, Golden Temple, Mudhal, Jasterwal ans Focal Point Tarntaran (RDSS Scheme)
Work of attending to resolving the Fuse Off Call Complaints and LT HT line Breakdowns for restoration of Electrical Power Supply in the various Sub-divisions under CE DS West Zone Bathinda
Work of attending to resolving the Fuse Off Call Complaints LT HT line Breakdowns for restoration of Electrical Power Supply in the various Sub divisions under CE DS South Zone PSPCL Patiala
Laying of tower foundations, Erection of Towers, Stringing and Sagging of conductor for 220 KV SC Two phase line from 220 KV bay at Bajakhana to 220 KV RTSS Romana Albel Singh in connection with Railway Electrification of Track b/w Bathinda- Ferozepu
Work of attending to resolving the Fuse-Off-Call Complaints and LT/HT line Breakdowns for restoration of Electrical Power Supply in the various Sub-divisions under CE/DS WEST Zone, PSPCL, BATHINDA.
Construction of balance works of Addl. T/F Plinth and its allied works at 66 KV S/S Chak Budho Ke (under op. circle, Sri Muktsar Sahib) under RDSS
Construction of 4 Nos. Addl. T/F Plinths and its allied works at 66 KV S/S Dalel Singh Wala, Panje Ke Uttar, Dina Sahib and Dhanna Shahid under RDSS
Construction of Additional foundations for 1no. 66KV Additional Transformer bay and allied civil works like trenches, gravel spreading at 66KV s/s Gillan (under op. circle Jalandhar) (TWL no. 192/NZ/2023-24/Annex-E) under RDSS
To hire outsourced technical Manpower and Complaint Handing Bikes and Complaint handing wagon alongwith collapsible ladders for attending to resolving the Fuse Off Call Complaints and LT HT line Breakdowns for restoration of Electrical Power Supply
Work of attending to resolving the Fuse Off Call Complaints LT/HT line Breakdowns for restoration of Electrical Power Supply in the various divisions under City Circle Amritsar and East Division Amritsar under Suburban Circle Amritsar
Construction of Additional TF Plinth Bay and allied civil works like trenches, gravel spreading etc. at 66 KV SS Khilrian and 66 KV SS Kanoi (under op circle Sangrur) under RDSS
Construction of Additional T/F Plinth Bay and allied civil works like trenches, gravel spreading etc. at 66 KV S/S Ghanour and 66 KV S/S Haripur Kurran under RDSS
Augmentation of existing 66kV line from 66kV S/S Dhalewan to 66kV S/S Borawal with 0.2sq SC on DC line- under RDSS (TWL no. 141/WZ/2023-24 Annex-E)
Outsourcing of Installation of 66 kv substations (New) with one no. 20 MVA PTF along with 1 no. Line bay on partial turnkey mode under RDSS scheme under Grid construction Division Ludhiana
Sagging Stringing of 2nd Ckt of 66kV line from 220kV S/S Baghaprana to 66kV S/S Samalsar 0.2sq SC on DC- under RDSS (TWL no. 134/WZ/2023 24 Annex E)
outsourcing work of erection testing and commissioning of Additional 3 no. 20 MVA Power Transformers along with complete bay equipments on partial turnkey mode under RDSS scheme under Grid Construction Division Ludhiana
Outsourcing work of ETC of new 66 KV Substation Harkishanpura with 01 no. 20 MVA PTF along with 02 No. bays on partial turnkey mode under RDSS Scheme under Grid Construction Division, Patiala
outsourcing work of erection testing and commissioning of bay and control room equipment matching work related to augmentation of Power transformer on partial turnkey mode under RDSS scheme under Grid Construction Division Patiala.
Construction of Civil works for Augmentation of 20 MVA 66/11 KV Power Transformer T-3 with 31.5 MVA at 66KV S/S Focal Point Rajpura. (Under Op Circle Patiala) (Under RDSS Work )
Construction of Civil works for Augmentation of 20 MVA 66/11 KV Power Transformer T-1 with 31.5 MVA at 66KV S/S Urban Estate, Patiala. (Under Op Circle Patiala) (Under RDSS Work )
Procurement of 66kV CTs under RDSS
Outsourcing work of ETC of Addl. 4 no. 20 MVA Power TFs along with complete bay equipments on partial turnkey mode under RDSS scheme under Grid Const. Div. Patiala under Grid Const. Circle, LDH
66 KV Second circuit from 220 KV S/s Dhanoula to 66 KV Aspal Kalan SC on DC Tower line ACSR 0.2 sq Conductor. (Planning No. 249/SZ/2025-26/Annexure-E) RDSS Work
Outsourcing work of ETC of Additional 2 no 20 MVA Power TFs along with complete bay equipments on partial turnkey mode under RDSS scheme under Grid Construction Division Patiala under Grid Const Circle Ldh
Work of attending to resolving the Fuse Off Call Complaints and LT H Tline Break downs for restoration of Electrical Power Supplyin the various Sub divisions under CE DS North Zone Jalandhar
Construction of 66kV line from 66kV Sikhwala to 66kV Fatehpur mania 0.2sq SC on DC line under Revamped Reformed based and results linked, Distribution Sector Scheme (RDSS) (TWL no. 138/WZ/2023-24 Annex-E)
Procurement of 11 KV RVTs under RDSS
TE 367 Transformer CR Panel under RDSS
Procurement of 66 kV PTs under Rdss
Construction of Allied Civil works such as capacitor bank, GO switch, NCT and stair steps for Power Transformer Augmentation under RDSS scheme at 66KV s/s Focal Point Batala, Kalanaur, Bhuche Nangal, Dinanagar and Ranjit Bagh
66 KV Line for New 66 KV S/S Harkishanpura (LILO from 66 KV Bhawanigarh to Bakhpoir) DC on DC Tower line, ACSR 0.2 sq Conductor (Planning No. 265/SZ/2025-26/Annexure-E) RDSS Work.
Outsourcing work of erection testing and commissioning of Additional 1 no20 MVA Power Transformers at 66KV Ss Sanguana Basti along with complete bay equipments on partial turnkey mode under RDSS scheme under Grid Construction Division Bathindaunder
For outsourcing work of erection, testing and commissioning of Additional 3 no. 20 MVA Power Transformers along with complete bay equipment on partial turnkey mode under RDSS scheme under Grid Construction Division PTA, under Grid Const. LDH
Outsourcing work of erection testing and commissioning of Additional 3 no 20 MVA Power Transformers along with complete bay equipments on partial turnkey mode under RDSS scheme under Grid Construction Division Patiala under Grid Const Circle LDH
Construction of Addl T/F Bay allied civil works like trenches, gravel spreading etc. at 66 KV S/S Dhaidi (Under Op Circle Mohali) and at 66 KV S/S Balbera (Under Op Circle Patiala) (Under RDSS )
Work of replacement of overhead HT LT line with underground cables i e HT cable LT cable and PVCs with accessories involving Supply Testing Laying and Commissioning of 11 KV LT lines in village Satouj under Circle Sangrur on turnkey contract basis.
for outsourcing work of erection testing and commissioning of Additional 3 no 20 MVA Power Transformers along with complete bay equipments on partial turnkey mode under RDSS scheme under Grid Construction Division Bathinda under Grid Const Circle Lu
DEVELEOPMENT OF DISTRIBUTION INFRASTRUTURE for PACKAGE 53(NAYA GAON) for DeLoading of overload 11 KV Feeders,DTs,LD System,UG Cabling(HT,LT),Installation of NEW DTs,RMUs and Replacement of LT Cables,PVCs and MCBs UNDER RDSS IN PUNJAB.
DEVELEOPMENT OF DISTRIBUTION INFRASTRUTURE for PACKAGE 52(KHARAR) for DeLoading of overload 11 KV Feeders,DTs,LD System,UG Cabling(HT,LT),Installation of NEW DTs,RMUs and Replacement of LT Cables,PVCs and MCBs in UNDER RDSS IN PUNJAB.
DEVELEOPMENT OF DISTRIBUTION INFRASTRUTURE for PACKAGE 51(MOHALI AND AEROCITY) for DeLoading of overload 11 KV Feeders,DTs,LD System,UG Cabling(HT,LT),Installation of NEW DTs,RMUs and Replacement of LT Cables,PVCs and MCBs in UNDER RDSS IN PUNJAB.
Providing HT/LT Line and Transformers in 17 Acre Development Scheme for Manshahia Nagar Scheme Sangrur.
Manufacture, Testing, Supply and Delivery of 233 Nos. Marshalling Boxes required for KV RDSS Works
for providing Consultancy Services to analyse defects of HT LT cables, CSSs, RMUs, Distribution Boxes Door Panels including HT LT switchgears along with analyse the repairable, reusable and replaceable material and to prepare Detailed Project Reprt
Work of attending to resolving the Fuse Off Call Complaints LT HT line Breakdowns for restoration of Electric power supply
Extension to Switch house building at 66kv s stn Bharo under O and M division, Sangrur Under RDSS
Extension to Switch house building at 66kv s/s Sanour under O and M division, Patiala (Under RDSS).
Extension to Switch house building at 66kv s stn Mangwal under O and M division, Sangrur Under RDSS
Extension to Switch house building at 66kv s/s Tulewal under O and M division, Patiala (Under RDSS).