Loading…
Loading…
24,004 results • Best match
Extension of LT line to Hi-Tech Poly Green House at FVSc and AH Shuhama, SKUAST-Kashmir
Reparing of LT Line, Highmast and Pole Painting, Main switch, Cabling work At NMY. Chakarpur, Bhauti, Kanpur.
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Sankh under DC-Work 2023-24
moh. gulshan nagar ke gourav lekhpal ke makan se ex member subhash ke makan tak LT LINE
Estimate for Rep.of LT line Cable at village Dimawar under Bhairunda D/c Under (OandM) Dn. Bhairunda
FOR THE WORK OF REPAIRING AND MAINTENANCE OF DAMAGED HT AND LT LINE IN EMERGENCY NATURAL CALAMITY
CONSTRACTION OF HT/LT LINE FOR RELEASING 01-O1 KW CONNECTION FOR DIFFERENT SCHOOL UNDER EDD TULSIPUR
Providing of Pole Shifting work for LT line at Engineering College Section to I-type Qtrs Ujjain
Estimate for Rep.of LT line Cable at village Babri under Bhairunda D/c Under (OandM) Dn. Bhairunda
Annual maintenance of LT Line for uninterrupted Power Supply of Pareshan Bhawan, Guest House and Transmission Colony
Installation of earth at Paparwatad for LT line Transformer sub station, Town Supply, GRD Project,Giridih Area.
HT And LT Line Extension and Improvement works in North Vellakoil Subdivision under running works contract basis
LT Line Extension and Electric Maintenance Work in Addition vegetable Yard, Behind Main Mandi Grain Yard Ratlam
Lt line cable with auto timer switch for street light of various ward under nagar parisad manpur
Repair work of 250Watt HPSV fitting and LT Line at Dam Site, Jobat Project ,Nanpur Distt- Alirajpur
Nyas perapheri kshetra Mandal me sheko ka mohalla se ghughraghati tak LT line underground karne ka karya
Pole Shifting of HT/LT line For Kapileswhar Mahadev Approach Road, Badnagar Distt. Ujjain. (Length - 1.15 Km.)
Estimate for New DTC Structure and LT line under DDF scheme at Nivdunga Tq Jafrabad Dist Jalna
LT Line Shifting work at Ward No. 09 near Lodhi Kuiya under municipal council chhatarpur (II CALL)
100 and 11 K.V. in front of Savarkar Bal Bihar. TRANSFARMER, LT. Line Shifting Work. (Two pieces)
LT line P.S. OF 10 NO. IRR. PUMP CONNECTION 50 HP LOAD AT VILLAGE BILJHAR RAWTALA FALIYA
Nyas gair yojna kshetra ward no. 67 me pole evm light va LT line shifting ka karya
Estimate for shifting of HT/LT Line, T/F Sub-Stn, ON IRDP Badkas Sq to Sakkardhara
Erection/Shifting of 11Kv/Lt Line, Pole, Tower, Transformer at Various Palaces in UIT Area. (ARC) 7210
Construction of New 11/.4 K.V. Substation, HT/LT Line for 07 Nos. Payjal Under EDD Padrauna
Pole Shifting 33 KV/11 KV, LT line and Transformer Shivpur Road ROB Seoni Malwa Dist narmadapurm
33 KV, 11 KV and LT Line Shifting Work due to Road Widening Work Under EDD Nagina
work of 11 KV, LT line Rectification and increase capacity of DT semi turnkey bases in Sahaspur
survey, installation,testing and commissioning of 11kVline,11/0.433kV distribution transformer and LT line under different schemes
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Bandichechian under DC-Work 2023-24
Pole Shifting of HT/LT line For Makdawan Railway Station Approach Road, Distt. Ujjain. (Length - 1.50 Km.)
SUPPLY AGAINST CONSTRUCTION OF 11KV LT LINE AND DTR FOR GIVING NEW SECVICE CONNECTION UNDER EDSD MUNSYARI
SPECIAL REPAIR / REPLACEMENT OF OVERHEAD LT LINE TO UNDERGROUND CABLE NEAR RSI CIRCLE UNDER GE(U) SECUNDERABAD
HT and LT Line Extension and Improvement Works in Rural/North/Avinashi Sub-Division of Avinashi Division
Erection of New 11KV and LT Line Work At Affordable Housing Scheme Dangiyo Ki Pancholi, Bedwas 1205
Tree Trimming and Cutting Work in way of 33 KV,11KV and LT Line under EDD Baghpat
SITC of 100 KVA Substation with LT line and Allied works at MCRS Sagam SKUAST-Kashmir.(NABARD)
Providing and erecting HT LT line DTC at I and C Center at Yavatmal Tq Dist Yavatmal
Electrification (LT LINE) work in the premises of AP HRDI, Training Center,Bapatla Est Cost Rs: 29,35,142/-
HT / LT Line Shifting at Bagalakote Biligirirangana betta (SH-57)From km 428.00to 430.00 in Chikkamagaluru Taluk.
Creation of 3X250 and 5X100 KVA S/Stn. alongwith HT/LT Line at Kalai under WSS PHE
Works contract for IPDS scheme for LT LINE STRENGTHENING at VARIOUS TOWN PANCHAYATHS OF of Tiruchendur Division
Maintenance of 11 KV LT line with re-sagging loose line cutting tree branch at vairous palace
WORK OF HT/LT Line Maintenance Work for SDO I Town Under ELECTRICITY DISTRIBUTION DIVISION- I ETAWAH.
Construction/Mentinance of 11 KV/LT Line under Full Deposit at EDSD II Sasni EDD III HTS
for various 11 KV LT Line works against sanctioned packages in Business plan under EDD 1 Agra
Creation of HT and LT line along with Substation.
Construction of 11KV Line (Over Head and UG Cable) 6.5 Kms for A/P/S to HT installation of IIIT Building in Wadawatti Village area in Raichur Taluka on TTK Basis
Maintenance of HT and Lt Line in the area of EDSD-3 under EDD-1st Baraut.
Rural Electrification works of Pulwama district in the state of J and K under Saubhagya Block Tral Giru(Norpora) New Shah Mir Mohalla, Padgampora(Sheikh Colony,Irigation Colony Larkipora), Gulistan(New Colony Gulistan), Hajinar Nor(Kook Goger Basti)