Shifting of 11KV Line/LT Line /Transformer at Madri Underpass to Reliance Cremotex, Kanpur Road. 3208
PROVIDING EXTERNAL ELECTRIFICATION OF DTR/0.4/11KV LINE & LT LINE ATE VILLAGE KOTHITAL GP DHUMMADOL (Q3)
Shifting of 11KV Line or LT line and Transformer at University Junction to Shobaghpura Road. 2607
SHIFTING OF 33 KV LINE
Reconductoring of 33 KV Line
construction of 33 KV Line
construction of 33 KV Line
Shifting of 33 KV Line
construction of 33 KV Line
33 kv line shifting work
Construction of 33 KV Line
2026_MPFD_2026_27_02 33 kv line work
Laying of 33 KV Line
11 kv line on existing LT line, B to C 11 kv line 0.25 km, D to E 11 kv line 0.42 km, F to G 11 kv line 0.7 km, H to I 11 kv 1 km, J to K 11 kv 0.85 km on 140 kv pcc poles as per enclosed survey. Hence an Estimate has been framed
Est. for replacment of 11 KV Line and LT Line at village karahi under Kheraghat D/c under OnM Dn. II Shivpuri.
Installation testing and commissioning of 11 KV Line Distribution Transformer LT line providing Household Connection to identified households in the OnM Circle
Shifting of Existing 33/11 KV Line / LT Line at Bhoolgaon to Patel Falya at Niwali Block, Sendhwa Distt. Barwani. (2.65 Km.)
SURVEY, INSTALLATION, TESTING AND COMMISSIONING 11 KV LINE, 11/0.433 KV DISTRIBUTION TRANSFORMER AND LT LINE UNDER DIFFERENT SCHEMESIN OnM CIRCLE SATNA
SURVEY, INSTALLATION, TESTING AND COMMISSIONING 11 KV LINE, 11/0.433 KV DISTRIBUTION TRANSFORMER AND LT LINE UNDER DIFFERENT SCHEMESIN ONM CIRCLE SATNA
Shifting works of existing 11 KV line LT line and Transformer due to widening of road Rajahi camp to Turra Nala Gorakhpur
PROVIDING AND SHIFTING 11/33 KV LINE LT LINE AND DTR DUE TO ROAD WIDNING FROM DOUBLE FAATAK TO BIRJAKHEDI ROAD AT DISTRICT HARDA
Shifting of Electric Pole/HT Line/ LT Line Along Devgarh to Jhaleriya road Distt. Dewas
HT line construction, Shifting of LT line etc
Supply Installation Testing and Commissioning of New 11 KV Lines LT Line Distribution Transformer etc. for separation of 11 KV Mix Feeders DTRs under RDSS Scheme in Rewa circles Package-07
Supply Installation Testing and Commissioning of New 11 KV Lines LT Line Distribution Transformer etc. for separation of 11 KV Mix Feeders DTRs under RDSS Scheme in Satna circles Package-08
Supply Installation Testing and Commissioning of New 11 KV Lines LT Line Distribution Transformer etc. for separation of 11 KV Mix Feeders DTRs under RDSS Scheme in Balaghat circles Package-06
For Providing Shifting of 33 KV Line, 11 KV Line, LT and DTR hindrance on construction of Railway Over Bridge (LC-119) and Lightening at Bairasia Road near Karond Mandi Bhopal
Development of Distribution Infrastructure at Jind Division (under Jind Circle) of Haryana under the Revamped Reforms-based and Results-linked, Distribution Sector Scheme (Loss reduction Works)
Erection of New 2 Km 33 KV Line and 9 Km 11 KV line for 33/11 KV sub-ststion Bakhasar under Sub-Division Sedwa Barmer Circle on Labour Rate Basis 2020
Supply Installation Testing and Commissioning of new 33/11 KV Sub-station 33 KV Line and 11 KV Line in Sagar Damoh Chhatarpur Panna Tikamgarh Rewa Satna Sidhi and Singrauli circles (Package03)
Development of Distribution Infrastructure at NIT Faridabad Division (under Faridabad Circle) of Haryana under the Revamped Reforms-based and Results-linked, Distribution Sector Scheme (Loss Reduction Works)
Development of Distribution Infrastructure at Old Faridabad Division (under Faridabad Circle) of Haryana under the Revamped Reforms-based and Results-linked, Distribution Sector Scheme (Loss Reduction Works)
33 kv line strengthening under edd kannauj
Estimate for bifurcation of 11 KV Line Badokhar to Kashipur under Dattpura Zone (OadM) Div. Morena-I
Shifting of 33KV Line, 11KV Line and 11KV LT Line from existing Plot Areas of MPIDC Ro-Indore at IA Hatod, Distt. Dhar and Replacement of Damaged H-Beam on 33kv Kuwarshi feeder Near Karam Dam, Pithampur, Distt. Dhar
Replacement of 34 No. 11 KV Line 11 KV Line TP LT Line DP Structure Broken PCC Pole at Santoshpur Awadi Gurema Awadi Heerapur Awadi Barrend Awadi Barrend Pump feeder under Jhundpura D/c (OandM) Division Sabalgarh
(1) Strengthening works 33 KV Line Silwarston (Muzaffarnagar). (2) Strengthening works 33 KV Line Paper Miil (Muzaffarnagar). (3) Strengthening works 33 KV Line Audhyogic No.-02 (Muzaffarnagar).
(1) Strengthening works 33 KV Line Audhyogic No.-07 (Muzaffarnagar). (2) Strengthening works 33 KV Line Sikheda (Muzaffarnagar). (3) Strengthening works 33 KV Line Interkanectar-02 (Muzaffarnagar).
ERECTION OF 33 KV LINE 19.00 KM SC 33 KV LINE WITH ACSR DOG CONDUCTUR T OFF FROM 33 KV GAMNE WALA FROM 220 KV GSS RAMGARH ALONG WITH 33 11 KV SUBSTATION 1X3.15 MVA AT KOLUTALA WITH ERECTION OF 11 KV LINE 5.5 KM UNDER AEN Rural JDVVNL JAISALMER
ERECTION OF 33 KV LINE 22.34 KM SC 33 KV LINE WITH ACSR DOG CONDUCTUR FROM 132KV 113RD SBS GSS TO MUNNA TIBBA FEEDER ALONG WITH 3311 KV SUBSTATION 1X3.15 MVA AT PROPOSED 192RD WITH ERECTION OF 11 KV LINE 5.0 KM UNDER AEN O and M MOHANGARH CIRCLE JSM
PKG-B Undergrounding of HT and LT lines (S/s-Tapovan and Muni ki Reti) on turnkey basis under Revamped Distribution Sector Scheme in Uttarakhand State
Development of Distribution Infrastructure at Manesar Division (under Gurugram-I Circle) of Haryana under the Revamped Reforms-based and Results-linked, Distribution Sector Scheme (Loss Reduction Works)
Erection of 11 KV line,LT line and 11/0.4 KV S/S For various system improvement works under sub division A-VI, Division CD-I, Circle city Jodhpur on labour rate basis
Estimate for Interconnection of 11 KV line Garetha Pump feeder to Chatoli Pump under Bagroda DC of O and M Division Ganjbasoda
Estimate for shifting of 11KV line and LT line obstructing left turns at Bhopal Talkies Square, Bhopal.
Construction of 11KV line with bare and covered conductor with RMU and conversion of LT line etc
Supply Installation Testing and Commissioning of New 11 KV Lines LT Line Distribution Transformer etc. for separation of 11 KV Mix Feeders DTRs under RDSS Scheme in Shahdol Anuppur and Umariya circles Package-04
33 KV line strengthening work, 11 KV line strengthening work and 11 KV New line construction work on Semi-Turnkey basis in Business Plan 2025-26 under the area of EDD, Sikandra, Agra
Construction of new 33 KV Sub Station Hindagol with 33 KV line 8.5 Km for Hindalgol with 11 KV line 5 Km for interconnection at Hindalgol under Bap Sub Division under Phalodi Circle
CONSTRUCTION OF 33 11 KV GSS UNDWA WITH ERECTION OF NEW 33 KV LINE 6.5 KM FROM RAWALI GSS And ERECTION OF 11 KV LINE FOR NEW INTERCONNECTION UNDER AEN O M, R.MANDI