Loading…
Loading…
271 results • Best match
Erection of new 33/11 KV SS with 4.0 KM 33 KV line, 5 KM 11 KV line and Civil works at Aragidha (V) in Gattu (M) in Gadwal Division of Gadwal Circle
Procurement of INSULATING SLEEVE FOR HT LINE AND POLIPRO INSULATING SLEEVE FOR LT LINE for Bhupalpalli Are
Procurement of Insulating Sleeve for HT Line and Polipro Insulating Sleeve for LT Line for Bhupalpally Area
Shifting of 8.0KM 33KV line(From 33/11KV Peddakodur to Machapur SS), 7.5KM 11KV line, 10KM LT line and 5Nos DTRs passing over the site of Ranganayaka Sagar Project at Peddakodur Village in Chinnakodur section of Siddipet Division & Circle(Reserved for S.C).
Erection of new 33/11KV SS with connected 33KV line and 11KV line at Anthergoan(V) Kalher(M) in Jogipet Division in Sangareddy Circle.
Replacement of Damaged 11 KV Line
Erection of new 33/11KV SS with 3.0 KM 33KV line & 4.0KM 11 KV Line and Civil Works at Medikonda(V) in Operation section Ieeza in Gadwal Division of Operation Circle Gadwal
Erection of new 33/11KV SS with 4.0 KM 33KV line & 4.5KM 11 KV Line and Civil Works at Puranapalem(V) in Operation section Dharur in Gadwal Division of Operation Circle Gadwal
Erection of new 33/11KV Sub-Station with connected 33KV line and 11KV line at Sikindlapur (V) in Hathnoora(M) in Jogipet Division in Sangareddy Circle.
Erection of new 33/11KV SS with connected 6.0KM 33KV line and 12.5KM 11KV line along with civil works at Singaram(V) in Achampet(M) of Nagarkurnool Division & Circle.
Erection of New 33/11KV SS with connected 8.0KM 33KV line and 3.5KM 11KV line along with civil works at Yapatla(V) in Peddakothapally(M) of Nagarkurnool Division & Circle.
Estimate for erection of new 33/11 KV SS with 5.0 KM 33 KV line and 3.5 KM 11 KV line at Ippatoor (V) in Nawabpet (M) of Operation Division Mahabubnagar in Operation Circle Mahabubnagar (WBS No. S-1250-30-06-01-01-001)
Estimate for erection of new 33/11 KV SS with 1.0 KM 33 KV line and 2.8 KM 11 KV line at Elkicherla (V) in Boothpur (M) in Jadcherla Division in Mahabubnagar Circle. (WBS No. S-1320-30-06-01-01-001) ( Reserved for SC Back Log).
Erection of 6 KM of 33 KV line for 33 KV Anneparthy Nalgonda
Dismantling of 9.500KM 11KV line, 13.000KM LT line Dismantle of 4Nos 25KVA DTRs 2NOs 100KVA DTRs, 2Nos 63KVA DTRs and Erection of 15.0KM 11KV line,20.0KM LT line which is passing over the site of Kaleshwaram project construction Division No-1 at Chandlapur and Ramnacha village in operation section Gurralagondi Operation Sub Division Siddipet Rural in Siddipet Division of Siddipet Circle
Extension of power supply by providing 11KV HT line and LT line to Industrial Park in Sy No.472/2, Chitkul(V), Patancheru Mandal, Sangareddy Dist
Construction of Training Infrastructure (Greyhounds) - Sub work: Supply and erection of 11kV HT Line, 250kVA DTR, LT Line and Street Lighting for entire campus of Greyhounds at Premavathipet, RR District.
Shifting of 33KV line (33KV Renewsis feeder) the existing 33KV line passing through the middle of the tower from Sub Station to Renewsis Fabcity in Srinagar Village and Shifting of 11KV line (11KV Wonderla and Janaiguda AGL feeders) at Fabcity in Srinagar Village of Maheshwaram Section of Mimidipally Sub Division of Kandukur Division in Rajendranagar Circle
Shifting of HT line
Erection of new 33/11 KV Substation with connected 3.8KM 33 KV line and 4.4KM 11KV line and Construction of Control room, Retaining wall, internal security fencing, compound wall and Bore well, water sump for 33/11KV SS at Gummadam (V) in Pebbair Mandal, Wanaparthy Division in Wanaparthy Circle.
Erection of new 33/11 KV Substation with connected 3.5KM 33 KV line and 4.0KM 11KV line and Construction of Control room, Retaining wall, internal security fencing, compound wall and Bore well, water sump for 33/11KV SS at Manajipeta (V) in Ghanpur Mandal, Wanaparthy Division in Wanaparthy Circle.
Proposal for extension of supply with load of 5.4MW by erection of 3.27KM of 33KV line from 132/33KV Burugupally SS and tapping to the existing 33KV Line along with erection of 35Nos M 6 Towers in the line that is passing over the villages for making ... 15M 33KV line from ... Existing 33KV line for ... of 11KV line to ...
Shifting of existing 33/11 KV SS at Bandairaipakula (V) in Revally (M) from Gopalpet to Gouridevipally X roads in Revally (M) with connecting of 3.8 KM 33KV line and 11.0 KM 11KV line in Operation section Gopalpet in Wanaparthy circle
Erection of new 33/11 KV Sub-Station with 5MVA Power Transformer with 6.9 KM 33 KV line & 8 KM 11 KV line along with civil works like Control Room, Retaining wall, Internal security fencing, Outer security fencing and Bore well, water sump at 33/11 KV Sub-Station at Peddamungalched (V) in Addakal (M) in Jadcherla Division of Mahabubnagar Circle
Erection of 11 KV Line to allotted industrial plots at seetharampur (V), in Shabad (M), Rangareddt District.
Extension of supply to 4 No , 20KW Non domestic load at Sy.No.287,293,294,295,296,307, 309& 325 at Inmulnarva in Kothur Mandal, Rangareddy District with Erection of 2.65 KM of 11 KV Line and 8.34 KM of LT Line over PSCC poles on e procurement(Reserved for Scheduled Caste)
Supply of Insulators and Metal parts for 11kV Line
33KV line from 132/33KVSS R.C.Puram to 33/11KV SS Ashok Nagar
Custom Bid for Services - 11kV HT Line Work
Shifting of 5.5KM 33KV line,which is P-type towers(22No. Towers each 250 span) and dismantle of 12.5KM 33KV line and erection of 16.0KM 33KV line which is passing over the site of KALESHWARAM PROJECT Package-II at Chandlapur(V) in Gurralagondi(M) of siddipet Division & Circle.
Errection of 11 KV line to allotted industrial Plots at Chandanvally(V) of Chandanvally Industrial Park, Chevella(M), RR District.
Shifting of existing 0.10 KM 33KV Line & 3.0 KM 11 KV Line& 0.75KM LT 3 wire Line rough out existing Tar & mud road from Dump yard to AGL Research Center both side for the newly constructed ORR 66 feet road work carried out by R&B Department in operation section Siddipet Rural of operation Siddipet Rural Sub Division of Siddipet Division & Circle
PROCUREMENT OF INSULATING SLEEVE FOR HT LINE FOR 132KVSS,MM
Shifting of 2.59KM 33KV Kodad Town feeder and 0.50KM 11KV Town III Feeder by dismantling of 2.59KM 33KV line and 0.50KM 11KV line which are passing over the houses from 33/11KV Kodad Outdoor SS near Khammam X Road to Ram Murthy Nagar, and erection of ... 1.20KM 11KV line from ...
SHIFITING OF EXISTING SERVICE NO.03001057 (DISMANTLING OF 0.36 KM & ERECTION OF 1.75 KM 11 KV LINE) FROM CHITYALA ROAD TO NAGAVARAM ROAD ON EXISTING 11 KV LINE POLYTECHNIC FEEDER WHICH IS EMANDATING FROM 33/11 KV POLYTECHINIC SS IN WANAPARTHY R (M) FOR DUMPING YARD AT NAGAVARAM VILLAGE IN WANAPARTHY MUNICIPALITY
Erection of 10.8 KM 11 KV line for internal infrastructure development at TSIIC Food Processing Zone, Sarvareddypally(V) in Vangoor(M) in Nagarkurnool District.
Erection of 5.3 KM 33 KV line for HT load of CMD 1640 KVA for Karne Thanda Lift Irrigation Scheme at Meetya Thanda (V), Bijinepally (M) Nagarkurnool District.
Shifting of 33 KV line on 33KV Ibrhimbagh feeder at Alizapur to Culvert KGN Nala in ward no.6 in Manikonda Municipality Under Municipal General Funds 2023-24
Outsourcing for 33kv/11kv Line Laying and Errection of 33kv/11kv Substation of ALP Mine`
Shifting of existing 0.10 km 33KV Line & 1.65 KM 11 KV Line & 0.25 KM 6.3 KV Line &1.30 KM LT 3 wire Line & 1.25 KM LT Cable rough out existing Tar & mud road from Raorukula to Pullur X Road both side for the newly constructed ORR 66 feetroad work carried out by R&B Department in operation section Siddipet Rural of operation Siddipet Rural Sub Division of Siddipet Division & Circle
PROCUREMENT OF MS FABRICATION MATERIAL REQUIRED IN 11KV & LT LINE ERECTION WORKS
Erection of 11 KV line to proposed TGIIC MSME General Industrial park at Sy.No.252, IP-Siddapur(V) in operation section Kothur of Kothur(M), Rangareddy(Dist).
Proposal for erection of 13.31KM new DC/SC 33 KV line from 132/33KV SS Peechara in operation rural division Hanamkonda, Hanamkonda circle under T&D/SI on partial turnkey basis
Supply of 33KV Disc type insulators, 33KV Pin insulators for use at 33KV line at Mini Hydel Stations, Peddapalli
Rerouting of existing 0.6KM 11KV line and 0.72km LT3phase 5wire line and 8 No.s 3-phase Distribution Transformers along the road by erection of 2.4km 11KV Single Circuit line, 3.0KM 11KV line on existing 33KV line over M+6 Towers and 2.40km LT 3ph 5wire line with 8No.s 3-phase DTRs to facilitate for formation of six lanes ring road at surrounding of the SLNS Temple towards Wangapally road to Yadadri Temple in Yadagiri gutta Town in Yadagirigutta section in Alair Sub-Division in Bhongir division of Yadadri Bhongir Circle.
Erection of 11 KV line to proposed General Industrial park at Sy.No.278 and 361 at IP-Siddapur(V) in operation section Kothur of Kothur(M), Rangareddy(Dist).
Shifting of existing 11KV line passing through the Industrial Plots at IP,Shivanagar,Jinnaram Mandal , Sangareddy District.
Proposal for erection of 9.55KM, 33 KV line for takeoff arrangement from newly erecting 132/33KV Pammi SS at Mallannapalem village, in Khammam Rural Division in Operation Circle Khammam under partial turnkey basis
Shifting of 33/11kv line in Old Dumping yard in Manikonda Municipality under Municipal General funds 2022-23
Remodeling of UGD along the HT line in ward no. 121 of Kukatpally Circle-24, GHMC