Replacement of Damaged LT Line Conductor and System Sternthing Work
To remove underground fault of 33KV, 11KV and LT Line.
Internal Electrification in Resi. Qtrs, Mandi samiti office, APF and Repairing of LT Line, Street /Flood light, S/F of 15 Nos. LED Street Light, 16 Nos. LED Flood Light and S/F of 15 H.P.submersible pump etc. work etc. at NMY. Lakhimpur.
Lopping AND Chopping of tree branches for clearance of HT/LT line at 33 KV Mall Line, 11 KV Rahimabad, Saspan, Mall Town, Atari, Gahdo, Manjhi, Shankrpur, Narayanpur, Navipanah and Uday Cold Storage Feeder under jurisdiction of EDD, CESS-IV, Cis Gomt
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION of LT Line AN Laying of ABC Conductor, T/F at Ravidas Nagar shuklaganj ( Nagar Palika Parishad Gangaghat )Unnao in the area of 33/11 KV Sub Station Shuklaganj, EDSD-I Shuklaganj under EDD-II, Unnao. aginest
The work plan of Rs. 20.00 cr. allocated for the system strengthening work under Additional BP 2023-24 in EDD-I, Chandauli, the work of replacing the dilapidated AB cable dilapidated wire installed on the LT line. on semi turn-key basis
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION LT Line, Laying of ABC Conductor, T/F at Awasthi Farm at shuklaganj ( Nagar Palika Parishad Gangaghat )Unnao in the area of 33/11 KV Sub Station Shuklaganj, EDSD-I Shuklaganj under EDD-II, Unnao aginest Paka
Lopping and Chopping of tree branches for clearance of HT/LT line. After Clearance of line through out pieces of tree branches of site at 33/11 KV Sub Division Kakori UNDER JURISDICTION OF E.E., EDD, CESS-IV, CISS GOMTI, LESA, Lucknow
Lopping and Chopping of tree branches for clearance of HT/LT line. After Clearance of line through out pieces of tree branches of site at 33/11 KV Sub Division Mall UNDER JURISDICTION OF E.E., EDD, CESS-IV, CISS GOMTI, LESA, Lucknow
Extension/Re. of LT Line, S/F LED Light on 16 Metre H. M. Light 04 Nos, S/F of 150Ltr. Capacity 02Nos. water cooler. RO water purifier 02Nos. 4KVA Steblizer, GI Pipe line and cabling work at NMY Nanpara Distt. Bahraich.
S/E of 2 no. 16mt. High mast lights and cabling, Repairing of LT line, S/F of LED street lights, Repairing of LED street lights and high mast flood lights, S/I of 10no. water cooler and related work at NMY Muzaffarnagar
THE WORK OF SHIFTING OF 11 KV AND LT LINE AND OTHER RELATED WORKS DUE TO RE-DESIGN-RE-CONSTRUCTION AND PLACE MAKING OF LOKBANDHU HOSPITAL CROSSROAD, IN THE DEPOSITED PLAN 2025-26, UNDER THE JURISDICTION OF EE, EUDD-KANPUR ROAD, LUCKNOW
Lopping and Chopping of tree branches for clearance of HT/LT line. After Clearance of line through out pieces of tree branches of site at 33/11 KV Sub Division Malihabad UNDER JURISDICTION OF E.E., EDD, CESS-IV, CISS GOMTI, LESA, Lucknow
For the Work of Maintenance of LT Lines with Dismantling of LT Line AB Conductor Including Replacement of Damaged Poles/Strengthening of poles etc. Under 33/11 KV Sub-Station Rangoli in the area of EUDSD XI, Meerut Under EUDD-III, Meerut.
WORK FOR SHIFTING OF 33 KV/11 KV/LT LINE OF DABAULI FEEDER F 84 TOWN TO DABAULI (CHANNEL 3 TO 18 KM) DUE TO ROAD WIDENING 6.0 MTR. UNDER THE AREA OF EDSD-II SAFIPUR UNDER THE EDD-IV BANGARMAU UNNAO.
QUANTUM OF WORKS INVOLVED FOR CONSTRUCTIONS OF NEW 11 KV/LT LINE AND REPLACEMENT OF OLD AND JARJAR CONDUCTOR IN DIFFRENET PLACES IN THE HASANGANJ AREA OF E.D.S.D.-II, HASANGANJ UNDER THE E.D.D. V, HASANGANJ, UNNAO THE BUSINESS PLAN YEAR 2024-25.
Shifting of Existing 33 KV, 11 KV, LT line and distribution Transformer From Starting Point of Rajghat Bridge to 100 Mtr ahead and ending of this bridge to 100 Mtr ahead over the Rapti River Between Transport nagar and Nausarh Distt. Gorakhpur
Repairing of LT line, repairing of LED street lights, S/I of 7.5hp submersible pump with starter, S/I of 02 Nos 150L water cooler, Construction of 2 no. mini boring with 1HP submerssible pump, Pipe Line Connection, Cabling work at NMY Budaun
Quantum of works involved in 11 KV and LT Line of Shuklaganj-1st and Gayatri Nagar Feeder shifting work at Azag Marg opposite side of palm Bliss on Request of Executive Engineer PWD prantiya khand Unnao, Magarwara (Gokul Baba) Substation under EDSD-
Supply of Materials and Erection for Construction of 11 KV and LT line, 33/11 S/S, Installation of New Power T/F, Increasing Capacity of Distribution T/F and Replacement of Damaged Poles etc. under EDC Pratapgarh Distt. Pratapgarh in Deposit Scheme
REGARDING STRENGHTHENING OF 11 KV and LT LINE OF 11 KV CHINDORI FEEDER, 11 KV BADAM FEEDER AND 11 KV PATHOLI FEEDER FEEDED FROM 33/11 KV SUB STATION ROHTA AND KARNAWAL IN THE AREA OF EDSD-3 BHOLA UNDER EDD-III MEERUT
Regarding laying of neutral wire in LT Line to change the unmetered connection into metered connection in village Kinoni and town Khiwai at 33/11 KV Sub-Station kaithwari and Khiwai in the area of EDSD-III, Bhola under EDD-III, Meerut
REGARDING CONSTUCTION OF NEW 11 KV / LT LINE, RE-ARREGMENT OF OLD LINE AND RELESEING OF NEW CONNECTIONS UNDER DEPOSIT SCHEME AT 33/11 KV SUB-STATION GEJHA, UKHLINA AND RAGHUNATHPUR IN THE AREA OF EDSD-III, BHOLA UNDER EDD-III, MEERUT
EDD-I, Chandauli Under Home Minister, Govt. of India, former Chief Minister Akhilesh Yadav and former Chief Minister Mayawati Govt. of U.P. for the general Lok Sabha Election for the construction of helipad in Chd., removal of 11 KV and LT line
Tender for the work of Shifting of 33KV/11KV/LT Line of from Km. 155 to Km. 158 extention of (4 Lane) from Vill. Korriya Petrol Pump Shahjahanpur Road to Pihani Chungi Hardoi in deposit yojna, under jurisdiction of EE, EDD-II Hardoi.
Replacement of ACSR conducter by New AB Cable of LT Line in HARTOLI 100 KVA, NAITHLA PULLIA WALI DP 250 KVA, SUNHERA 63 KVA BAMBE WALI DP, GANGERA BALMIK BASTI 100 KVA T/F IN S / s Walipura, Under EDD-II, Bulandshahr
For Replacement ofACSR weasel conductor byAB conductor and LT Circuit bifurcation due to overloaded LT line Near T/F Shri ram-I, Faizullaganj Lucknow against Business plan 2018-19Package No.88/SI/CE/18-19 under EUDD Sitapur road,Transgomti LESA,LKO
FOR CARRING OUT THE WORK TIGHTING OF LOOSE LT LINE, REALIGNMENT OF TILTED POLE FIXING OF BAMBOO SPACER AND JUMPHERING WORK AT VARIOUS PLACES UNDER 33 11 KV SUBSTATION ANAND VIHAR PREET VIHAR DHEERKHERA RURAL HAPUR UNDER THE JURISDICTION OF EDSD II H
Refer to Tender Description
Refer to Tender Description.
WORK OF CONSTRUCTION OF 33 KV LINE FOR NEW CONNECTION FOR PARIYOJNA PRABANDHAK CONSTRUCTION AND DESIGEN SERVICE U.P. JAL NIGAM AKBARPUR BEHRAMPUR IN THE AREA OF EUDDD-IX GZB
CONSTRUCTION WORK OF NEW 33 KV LINE AND ASSOCIATED LINE FOR 1X5 MVA S/S DEGREE COLLEGE CHAURAHA IN EDC-RAEBARELI I AT DISTRICTRAEBARELI. UNDER BUSINESS PLAN 2024 25
CONSTRUCTION OF NEW 33 KV LINE EMANATING FROM 220 KV PRIMARY S S KANDUNI TO 33 11 KV S S KANDUNI AT DISTRICT SITAPUR UNDER BUSINESS PLAN 2023 24
Work of off shooting of tree branches for untripping of 33 KV Line that was damaged continuesly due to storm in the area EDSD sarsawa under EDD I SRE
THE WORK OF ADDITIONAL 33 KV LINE FOR 33 11 KV S S HANSWAR UNDER THE HEAD OF M R IN THE JURDICTION OF ELECTRICITY DISTRIBUTION DIVISION ALAPUR AMBEDKARNAGAR
THE WORK OF ADDITIONAL 33 KV LINE FOR 33 11 KV S S HANSWAR UNDER THE HEAD OF O M IN THE JURDICTION OF ELECTRICITY DISTRIBUTION DIVISION ALAPUR AMBEDKARNAGAR
LT and HT line Shifting work in the area of EDD Deoband
The work of placing the meters installed inside the premises of electricity consumers to out side of their premises of the work done at various place under RDSS scheme in the area of Electricity Distribution Division-IInd (Amethi), Distt. Amethi.
The work of placing the meters installed inside the premises of electricity consumers to out side of their premises of the work done at various place under RDSS scheme in the aria of Electricity Distribution Division-Ist Gauriganj, Distt. Amethi.
Shifting of 33KV line passing over DRDO permises in deposit scheme in area of EDD-II Hapur
Shifting of 33KV Line Passing over house of Shri Kuldeep Kumar in area of EDD-I Hapur
Erection of 11 KV HT Line 0.4 KV LT Over head Line construction of 11 0.4 KV new sub station for feeding temporary power supply for typeIV (Block B) quarters and type III (Block B) quarters in new constructed tower buildings of new colony HTPS Ka
Maintenance Work of Protection of ST Poles with Plastic Sheet, Barricading of T/F (250 to 630 KVA T/F), Sagging of Loose Span and Guarding of LT/HT line during Kanwar Marg (Siwaya Toll Plaza to Modipuram) in the area of EDSD-II, Pallavpuram under EDD
Maintenance Work of Protection of ST Poles with Plastic Sheet, Barricading of T/F (250 to 630 KVA T/F), Sagging of Loose Span and Guarding of LT/HT line during Kanwar Marg (Partapur Bypass to Mohiuddinpur) in the area of EDSD-II, Partapur under EDD-I
Construction Of 33 KV HT Line and Conversion of 33/11 KV Overhead Line into Underground System In Different Location of Noida (Sector 108 FN CB22, Sector 53 FN 3 to A block Sector 34, Sector 53 FN 5 to C and B block Sector 34).
Work of giving 275 KVA new connection HV-2 for M/s Mac Industry at site of Kemri Road, Pahadi Gaon, Rampur. 1500 meter HT line supply feed from 11 KV Aloofarm feeder emanating from 33/11 KV S/S Pahari Gate under EDD-I, Rampur.
FOR CARRYING OUT THE WORK OF LIFTING AND RE SAGGING OF LOOSE LT HT LINES CUTTING OF TREE BRANCHES TUCHING OF LT HT LINE GUARDING OF LINES AND FIXING OF POLYTHENE SHEETS ON HT POLE AND STAY ROD UNDER THE JURISDICTION OF EDSDII HAPUR UNDER EDDI HAPUR
Increasing capacity of Substation Hargaon New from 2x5 MVA to 2x10 MVA and Associated 11 KV Line at Distt Sitapur Under Nagar Nikay Yojana 2024 25
For the work of Shifting 11 KV line due to construction of 220 KV Substation Sardar Nagar Amaria against Deposit Scheme under Electricity Distribution Division, Pilibhit.
Construction of 11 KV line related work for M/s Hind Agro Industries Ltd., Aligarh (HV-2 Connection) under full deposit scheme under EDD-III, Aligarh.