Loading…
Loading…
60,354 results • Best match
Costruction of Bituminous road with retaining wall and slope protection starting from Baidyapara toto stand to Ghotihara bituminous
Re construction damaged retaining wall
CC drain and Retaining wall
Constr. of Retaining Wall on Sunderpur-Titoli-Khidwali road in Village Khidwali from km 8.370 to 8.550 (LHS) in Distt. Rohtak
Slope protection works by providing sand bags pitching along workshop embankment at NMOC Mine under New Majri Sub Area of Majri Area
Improvement to Subalatamila Drainage Cut and Link drain of Gorigola Thakurpatna DC with Construction of Slope Protection work under DOAB No-II
Stone pitching, garland drain and dump slope protection works under NMUG to OC Mine at New Majri Sub Area of Majri Area.
Slope Protection and other Miscellaneous works in and around Power House Building of Parbati-H.E. Project (Stage-II) (Package No-C-815)
Balance Slope Protection Work Near Potheyard and balance Shotcreting work in back slopes at Hathiyari Power House Vyasi HEP (120 MW) Dehradun
Renovation of CD including repair of fall, bank strengthening, slope protection work in between RD 00m to RD 2500m of Habaspur Minor
Slope protection works by providing sand bags pitching along workshop embankment at NMOC Mine under New Majri Sub Area of Majri Area.
Slope protection and toe drain construction along north dyke and east dyke (Phase- I) of lagoon # 2 of Ash Pond KTPS, Koderma.
Emergent work of Slope protection in Sillewani Ghati under section of Saoner-Chhindwara under PIU Chhindwara of NH 547 under RO Jabalpur
Providing finishing works, Slope protection, Electrification and Networking etc., for Vengi Block of Redevelopment of the Resort at Rushikonda in Visakhapatnam District
Slope protection on Chitrotpala right embankment at RD 25.100 Km and RD 25.500 Km near village Uttarkul for the year 2026-27
Improvement and slope protection to left flood embankment of Bhainsimundi nallah near D/S of PWD bridge for the year 2026-27
PROTECTION WALL CONSTRUCTION
Side protection wall
Side Protection Wall
Construction of retaining wall at Amboli Hirenkeshi road VR , Taluka-Sawantwadi,District- Sindhudurg.
Construction of Retaining wall at love kush vatika Sagwara (Shivpuri gata mavita sagwara)
Ward No.5 me Covered RCC Nali Retaining Wall and CC Road Work
Construction of Retaining Wall from H/O Bancha Dhara towards the H/O Dino Bandhu at Srirampur sansad no.- II within Gayeshpur Gram Panchayet under 15 th. F.C. Untied fund during 2023-24.
Emergent protection to the eroded slope protection of River Hooghly near Camp Ghat within P.S. and Municipality Khardah, Dist. North 24 Pgs. of Calcutta Canals Sub-Division of Canals Division.
Cheruvodu - kizhakke kuzhiyil road retaining wall construction.
Construction of Internal Connecting Roads to various departments with necessary Retaining Walls and other works in the premises of RCU New campus Hirebagewadi, Belagavi
GENERAL-Construction of a retaining wall at ch.4/650 of Santhanpara pottankadu road-Construction of a retaining wall at ch.4/650 of Santhanpara pottankadu road
1) Construction Of Retaining Wall RMS Colony Nall At Bhusawal City Tal.Bhusawal Dist.Jalgaon 2) Construction Of Retaining Wall At Vinayak Colony Nalla At Bhusawal City Tal.Bhusawal Dist.Jalgaon
Flood Damage Repairing to Paithan Ombli to District Border Road Km 4/600 C.D. Work And Retaining wall MDR-72 (C.D.Work , Retaining wall) Taluka Poladpur, District Raigad.
Balance work of retaining wall near Bekta Niwas near Chitkara Park Kaithu (SH Construction of Retaining wall at Rd 0 00 to 0 016 ward No 3
Repair and Maint of Retaining Wall near Office area at Bn HQ Sajik Tampak and Maint of Retaining Wall near JCO Line at Bn HQ Sajik Tampak
Annual Plan Kallar GP Annual Plan 2023 24 PR NO 157/24 Retaining Wall for Edakadav Chettukallu road Retaining Wall for Edakadav Chettukallu road General Civil Work
PROVISION OF RE-CONSTRUCTION OF COLLAPSED PCC RETAINING WALL FOR CONSTRUCTION OF RCC RETAINING WALL NEAR REAR GATE TO PROVISION STORE AT DURGAPUR UNDER GE (SOUTH) DIGLIPUR
GENERAL Construction of Retaining wall at km 9/550 of Pathiripala kongad roadConstruction of Retaining wall at km 9/550 of Pathiripala kongad road General Civil Work
Flood Damage Repairing to Paithan Ombli to District Border Road Km 6/300 C.D. Work And Retaining wall MDR-72 (C.D.Work Retaining wall) Taluka Poladpur, District Raigad.
GENERAL Neeleshwaram Edathode road CC Retaining wall (RHS) Construction of CC Retaining wall in Neeleshwaram Edathode road (RHS) chainage between 17 000 17 200 General Civil Work
Construction of Drain, Retaining Wall, and Protection worknear Menase G.P. in Sringeri Taluk & Construction of Drain, Retaining Wall, and Protection work near Menase G.P. in Sringeri Taluk
Puttur CMC limit 1ward Raktheshswari temple passing Road right side Drain And NR Cross road Main Drain Retaining wall and Shevire Vana Raktheswari katte Near Retaining wall
Construction of a new retaining wall in place of the damaged retaining wall on the road from the hydrogen plant to the Surge Shaft Computer No 162416
Construction of a new retaining wall in place of the damaged retaining wall on the road from the hydrogen plant to the Surge Shaft Computer No 162958
CONSTRUCTION OF RCC RETAINING WALL SHED RIGID PAVEMENT AND PAVER BLOCK AT LUMP LOADING PLANT AND RCC RETAINING WALL AT FINES LOADING PLANT OF BOLANI ORES MINES
Construction of Gabion Structure and RCC retaining wall cum drain 2 mtrs. Height to protect Police Quarters and approach road at Madhupur under CD, APWD, Diglipur Sw- SITC of 02 Nos. 1.0 Ton Air Conditioner at CCTNS Server Room at Police Station, DP
Retaining Wall at km 32.050 to 32.110 on NH-15 (Construction of Gabion Wall from Ch 32.050 to 32.105 km And Construction of Box Culvert at 34th km on NH-15 under Annual Plan 2021-22 (Job No - 15/AS/2021/22/220
construction of retaining wall with toe wall at Rd. km. 3/210 to 3/221
Construction of PCC Toe wall alongwith Retaining wall at RD 19-005 to 19-025
SHC/o PCC retaining wall alongwith toe wall portion at RD0/440 to RD0/465
Construction of Retaining wall with toe wall at Rd. km. 3/900 to 3/914
Construction of PCC retaining wall with toe wall at RD. 2/880 to 2/884
Construction of Retaining Wall and Breast Wall, PCC V-Shape drain in extended portion at various Rds).