Loading…
Loading…
20 live17 closing this weekmost from CE RW I and CE-BM,LMB Basin,BBSR
20 results • Best match
Slope Protection to Left Bank of Kadua River near Village Ghodapada.
Alasahi to Nagar Road CC and Retaining Wall -40 mtr- 1.800 to 1.880
Construction of Protection Wall on Hantasara Minor near Phulabanka Matha.
Construction of Protection Wall Near Baba Bateswar Temple in Ward No.-12
Renovation and Construction of Toe wall in between RD 3.50 Km to 4.50 Km of Kendubadi Minor of Baghua Irrigation Project for the year 2026-27.
Construction of protection wall from Kumudin house to badakhuri main road in Ward No.-1
Construction of Protection Wall and Paver Road infront of Canal Division Office in Ward No.-3
Construction of Protection wall of Toyaput MIP in Laxmipur Block of Koraput District under Critical Scheme 2026-27.
Nariso to Kantapada Road SDBC and Paver Block, Protection wall 0.580 to 2.580 0.000 to 0.300 2.400 to 2.450
S/R to MDR to Laxmiprasad Road such as CC overlaying and constn.of protection wall for the year 2026-27
Construction of Protection wall near RD 3600 m on right bank of Daha Left Distributary of Daha Irrigation Project for the year 2026-27.
S/R to MDR-76 to Krushnapur road such as construction of protection wall and BT repair with PMC and SC for the year 2026-27
S/R to RD road to Badabara via-Gudapada road such as construction of retaining wall and pothole repair with BUSG and PMC with SC in BT surcace for the year 2026-27
Repair of fall at RD 5.310 km, Providing CC Channeling from RD 5.315 km to RD 5.405 km, Providing CC Channeling and retaining wall in between RD 6.290 km to RD 6.425 km of Mariwada Minor
S/R to PWD road to Nabaratnapur road such as BT repair with PMC and SC, construction of protection wall and overlaying of CC pavement for the year 2026-27
Repair to Bridge over river Kushabhadra at 4.60 Km on SN road to Padampur Panduasahi road Road Railing, post and guard post, plastering and colour washing, protection wall 0.185 to 0.236
S/R to ODR to Chinera road such as Gr-III metalling at patches with SDBC Pothole repair with BUSG at patches and PMC with SC and construction of protection wall for the year 2026-27
Earthwork in formation, Construction of Major Minor Bridges, retaining wall, Drains, Supply of ballast, P. Way Materials Track linking works, Construction of building and allied works from Ch 9/190 Km TakeOff to Ch 15/342 Km DE in connection