Loading…
Loading…
312 results • Best match
Jungle Boot;-1. Upper shall consist of Polyester Viscose (PV) Fabric, Water-repellent as an outer layer and 100% non- woven nylon (camarilla type) lining as inner layer. The two fabrics shall be adhered together with flexible adhesive and ... activated thermoplastic toe ...
Jungle Boot;-1. Upper shall consist of Polyester Viscose (PV) Fabric, Water-repellent as an outer layer and 100% non- woven nylon (camarilla type) lining as inner layer. The two fabrics shall be adhered together with flexible adhesive and ... activated thermoplastic toe ...
plastic moulded chair Plastic Moulded Chair ( 100 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC TYPE OF CHAIR PLASTIC MOULDED SEAT CUM BACK WITH SUPPORT STRUCTURE SINGLE PIECE PLASTIC MOULDED, PLASTIC ... FILLED THERMOPLASTIC FILLED ... UNFILLED THERMOPLASTIC , ...
Epoxy Resin, Fiber Glass Thin mat, PVC Sheet, Pigment Colour Cinnamon, PU Rigid Foam Block 200 kg, PU Rigid Foam Block 410 kg, Tracing Paper, Thermos paper multi color, Co polymer Polypropylene sheet 3mm, Co polymer Polypropylene sheet 4 mm milky, Co ... Temperature thermoplastic sheet ...
plastic moulded chair Plastic Moulded Chair ( 150 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC TYPE OF CHAIR SINGLE PIECE PLASTIC MOULDED SINGLE PIECE PLASTIC MOULDED, PLASTIC MOULDED SEAT CUM BACK WITH ... UNFILLED THERMOPLASTIC , ...
Splice Closure for Optical Fiber Cables (V2) (Suitable For Non-Ribbon Fibre Splicing) As Per TEC Specification (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6768017 Dated : 15-10-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Primary product category Splice Closure for Optical Fiber Cables (V2) (Suitable For Non-Ribbon Fibre Splicing) As Per TEC Specification Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 12373 Schedule 2 EMD Amount (In INR) 62629 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 27 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. 2/10 (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : GAIL INDIA LIMITED NOIDA, GAIL India Limited, GAIL India Limited, Ministry of Petroleum and Natural Gas (Gail India Limited)