Loading…
Loading…
1,294 results • Best match
Road Safety Audit on the Black Spots Amtali-Sabroom section on NH 08 in the State of Tripura, under the jurisdiction of NHIDCL
Periodical Renewals to Chennur- Vemanapally road from Km 0/500 to 2/800 in Mancherial District (Sub work:- Providing of Road Safety Interventions )
Maintenance of CC Roads under Road Safety Drive in Division No.121-Bandlaguda Jagir, Rajendranagar Circle-19, GHMC(Rs. 6.95 Lakhs) (Re call)
Delineator SE DLN 1003, Safety cones SE SCN11006, Aluminium Road Studs SE ALRS1025, Plastic Road Studs SE PRS 1033, Solar Road Stud SE SLRS 1017, Solar Flasher pole SE SLRS 1020, Solar Warning light SE SL 1048, Slolar Flasher Red SE SF 1022, Slolar Flasher Yellow SE SF 1023, Slolar Flasher White SE SF 1024, Safety Convex Mirrors 100cm, MS Pipe Bollard SE MSPBL 1048, Q Manager SE QM 1042, Road barricades SE PRB 1050, Solar Trafic Blinker light SE ETDL 11, Road sign Board Stainless steeel 4x2 Ft, Road sign Board Stainless steeel 2x2 Ft
Reconstruction of High Level Bridge at Km. 1/8-10 on Jaipur-Shetpally road in Mancherial District. ( Sub work: Providing of Road Safety Interventions)
Periodical Renewals to Rayapatnam to Kodada road at Km 0/0-18/0 (Working Reach 0/0-0/290, 2/0-3/0, 5/2-6/9, 7/3-7/8, 10/2-10/5, 12/125-12/625, 14/5-15/0, 17/100-18/0) in Jagtial District (CRN). Sub Work: Road Safety Interventions to Rayapatnam to Kodada road at Km 0/0 to 18/0 in Jagtial District.
Sub-work for Providing road Safety Measures Such as Centre line & Edge line Painting, Cuation Boards & Junction Boards and Village Name Boards etc.,on R&B Cross road to Bijwar road from Km 0/0 to 1/0 in Mahabubnagar District(Chargeable to main work of SL to DL connecting MHQ to DHQ for R&B Cross road to Bijwar road from Km 0/0 to 1/0 in Mahabubnagar District)
Periodical Renewals to (a) PWD road Husnabad to Ramavaram road from Km 0/0 to 1/0 (b) PPWD road Husnabad to Akkannapet road from Km 0/0 to 2/0 in Siddipet District.Sub-Work:-Providing Road Safety Interventions on (a) PWD Road Husnabad to Ramavaram road from Km 0/0 to 1/0 (b) PWD road Husnabad to Akkannapet road from Km 0/0 to 2/0 in Siddipet District.
Road Safety Interventions(RSI) estimate for removal of Accident Spots on NH-63 as per police reports from Km. 62/2-4, Km.78/8-10, Km.85/4-6,Km.92/0-5, Km.94/0-5, Km.94/500 to 95/000, km.112/0-2, Km.113/4-6, Km.116/4-6 and Km. 126/6-8 in Jagityal district of Telangana State (2nd call)
Periodical Renewal to Rayapatnam - Kodada road from Km 18/0 to 30/2 (working reach from Km 18/0 to 19/0, 22/0 to 24/1 & 25/2 to 30/2) including construction of side Drains at Katkanapally (v), Mallapur (V) in Peddapally District. Sub Work :- ... Providing road safety interventions ...
Sub-work for Providing road Safety Measures Such as Centre line & Edge line Painting, Cuation Boards & Junction Boards and Village Name Boards etc.,on Improvements to mahabubnagar to Koilkonda road from Km 0/0-to 0/6 & 20/2 to 21/2 in Mahabubnagar District (Chargeable to main work Improvements to mahabubnagar to Koilkonda road from Km 0/0-to 0/6 & 20/2 to 21/2 in Mahabubnagar District)
Periodical Renewals to Bellampally to Venkatapur from Km 0/0 to 13/0 in Mancherial District (Sub work:- Providing of Road Safety Interventions ) (2nd Call)
Providing Road safety Measures by Zebra crossing, Stop Lines, Signage boards, Solar Blinkers at Various locations in Ward No. 10-Uppal, Uppal Circle-2, GHMC
Construction of High Level Bridge at km.3/4-6 of Lokavaram - Penubally road in Khammam District (2nd call)Sub Work:- Providing Road safety interventions
Package No.2 : (1) Laying and stregnthening of Existing CC road by VDF from Asbestos Colony & Deenabandhu Colony in ward no121 of GHMC, Kukatpally Circle-24, (2) Strengthening of Exisitng Road by CC & road safety measures at papiredd Nagar in ward no ... and road safety measures ...
Periodical Renewals to Babasagar to Gudem road from Km 0/0 to 9/0 in Kumurambheem Asifabad District. (2nd call) Sub Work : Providing Road Safety Interventions
Providing Road safety Interventions for the Works of 1) Ibrahimpur-Dubbak road from km 0/0 to 6/2 2) PWD Road to Warangal District Border road from km 6/4-9/8 & km 11/0 to 14/0 3) Machapur-Nanganoor road from km 9/0 to 12/8 & 13/8 to 26/80 4)Siddipet-Venkatraopet road from Km 0/500-3/200 (Work in Km 1/200-3/200) in Siddipet District
Widening of Dichpally- Nizamabad road from km 3/7 to 14/4 in Nizamabad district ( Widening from km 3/7 to 12/2 and drains from Km 6/0 to 6/4, 10/2 to 11/2 and km 12/4 to 13/2) Sub- Work:- Providing Road Safety measures to prevent accident at blockspots identified by Police department on Dichpally- Nizamabad road from km 0/0 to 12/4 in Nizamabad District.
Widening from double lane to four lane in Bheemgal town of in Nizamabad District (i) Kammarpally-Bheemgal road from km.19/750 to 20/150 (ii) MorthadBheemgal road from km.16/5 to 17/0 (iii) Bheemgal-Muchkur road from km.0/0 to 0/6 (iv) ... Providing Road safety Interventions
Periodical Renewals to Nereducherla-Janpahad road from Km 2/462-814, 6/604-860, 6/912-7/324, 15/897-16/420, 16/477-698, 17/922-18/094, 18/129-230, 18/311-617, 18/841-882, 18/936-19/004, 19/382-479, 20/008-071, 20/6-22/131, 22/168-22/806 and ... Providing Road Safety Interventions ...
Construction of Retaining wall and widening of road for Free-Left at Satya Nagar Junction under Road Safety Drive in Ward No.28-Uppal, Uppal Circle-9, GHMC
Lane markings, Stop lines, Zebra Crossings and Signage boards to take up Road safety measures in 151-Begum bazar and 149-Mangalhat in Goshamahal Division 30, GZ, GHMC.
Laying of SW pipe drain from HP Petrol bunk to TVS showroom on Nagole Road under Road Safety Drive in Ward No.28-Uppal, Uppal Circle-9, GHMC
Laying of Road from Head Post Office to Petrol Bunk at West Fort in Greater Warangal Municipal Corporation Warangal limits in Warangal District i. Hunter road from Km 4/2 to 6/2 ii. Fort road via Chinthal Matwada Diversion road from Km 1/0 to 2/550 ... Providing Road Safety Interventions ...
Improvements to Hasnapur - Yellapur road from Km 20/0 to 22/0 and 25/0 to 44/0 ( working reach from Km 20/0 to 22/0 and 25/0 to 37/0) in Adilabad District. Sub work: Providing Road safety interventions to Hasnapur - Yellapur road from Km 20/0 to 22/0 and 25/0 to 44/0 ( working reach from Km 20/0 to 22/0 and 25/0 to 37/0) in Adilabad District.
Providing Road Safety Interventions on 1.Chivemla-Mukundapur road from Km 0/0 to 23/0, 2.Tekumatla-Solipet road from Km 0/0 to 16/0 and Solipet-Arvapally road from Km 0/0 to 6/0, 3.Nagaram-Maddirala Road from Km 0/0 to 13/0, 4.Nagaram-Maddirala road from Km 23/4 to 26/0 and 5.Suryapet-Nemmikal-Danthalapally road from Km 13/0 to 18/0 in Suryapet District
Improvements to PWD Road Thegalaguttapalli to Chegurthi via Dhurshed From Km 0/0 to 8/750 in Karimnagar District & Byepass Road to Gopalpur village from Km 0/0 to in Karimnagar Mandal in Karimnagar District Sub Work :- Providing Road Safety Intervention to Improvements to PWD Road Thegalaguttapalli to Chegurthi via Dhurshed From Km 0/0 to 8/750 in Karimnagar District & Byepass Road to Gopalpur village from Km 0/0 to in Karimnagar Mandal in Karimnagar District
Supply of various types of 3M Reflecting tapes, Radium tape, Traffic cones, Barricades, SS stands and Road safety studs etc for SLBHES, Srisailam Dam West NagarKurnool (Dist) - 509326, TELANGANA
Lane markings, Stop lines, Zebra Crossings and Signage boards to take up Road safety measures in 150-Goshamhal, 152-Jambagh and 153-Exhibition Grounds in Goshamahal Division 30, GZ, GHMC.
Providing Road Safety Interventions on Sathanpally to Pembi road from Km.0/0 to20/0 and Itikyala to Sirichelma road from Km.0/0 to 6/6 in Nirmal District.
Improvements to PWD Road Irukula to PWD Road Elabotharam road KM 0/0 to 4/5 in Karimnagar District b) Improvements to PWD Road Irukulla to PWD Road Cherlabuthkur from Km 0/0 to 3/6 in Karimnagar District.SUBWORK: Providing Road Safety Intervensions to Improvements to PWD Road Irukula to PWD Road Elabotharam road KM 0/0 to 4/5 in Karimnagar District b) Improvements to PWD Road Irukulla to PWD Road Cherlabuthkur from Km 0/0 to 3/6 in Karimnagar District
Improvement of junction from 2 lane to 2L with PS at Karimanagar - Adilabad junction at Laxettipet of NH63 Nizamabad to Jagdalpur section under Road safety in the state of Telangana.-2nd Call
(i) Widening of Dairy farm road (bodhan road to sarangapur hanuman temple) from km 0/0 to 1/5 in nizamabad dist (ii) formation of BT Road from Maheshwari bhavan to hanuman temple & gunj north gate from km 0/0 to 0/650 in in Nizamabad distrist (iii) ... Providing Road Safety Interventions
Improvements to (i) Ontimamidi - Anantharam Road from Km 0/0 to Km 9/0 (ii) Mulugu - Karkapatla road from Km 0/0 to Km 13/0, (iii) Markook - Ganeshpally road from Km 0/0 to Km 7/2 in Siddipet District. Sub work:- Providing Road Safety Interventions to (i) Ontimamidi - Anantharam Road from Km 0/0 to Km 9/0 (ii) Mulugu - Karkapatla road from Km 0/0 to Km 13/0, (iii) Markook - Ganeshpally road from Km 0/0 to Km 7/2 in Siddipet District
Improvements to (i) Banswada- Bichkunda road from km. 0/7 to 2/0(Km. 0/0 to 1/1- Four lane and km.1/1 to 2/0- Double lane) (ii) Pothangal to Hegdoli camp via Karegaon, hangarga road from km. 0/0 to 6/2 (Work in reach from km. 0/0 to 5/270)(iii) ... Providing Road Safety Interventions)
Road safety maintenance work for attending BT, CC patch, Catchpit repairs works at various places in ward no. 260 - Fateh Nagar of Bowenpally Circle-3, Malkajgiri Zone, GHMC from )February-2026 to May-2026)
Clutch Master Cylinder 19 05 Dia, Clutch Slave Cylinder, Repair kit for Accessories Wiper, Oil Seal, Circuit Breaker Battery Cut off Switch, Control Valve, Thermoplastic Hose, Clutch Disc, Dual Brake Valve, Vehicle Speed Sensor, Valve Relay Air Pressure
Fused deposition Modeling Printer 600 x 6000 x 620 mm, Polylactic Acid Filament material, Polyethylene Terephthalate Glycol Modified Filament material, Thermoplastic Polyurethane rubber material, Nozzle Brass metal, Nozzle Hardened steel, Heat Brakes, Feeder Tube, Extruder Component, Cleaning Liquid
Cross Laminated Thermoplastic Fumigation (CLTF) Covers (Q3) ( ( 3 3 )) OEM Average Turnover (Last 3 Years) 75 Lakh (s) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/7051316 Dated : 06-01-2026 Bid Document 1/11, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 2489400 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Advisory Bank HDFC Bank EMD Amount 49800 ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). 2/11 EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Regional Manager Central Warehousing Corporation (CWC), Regional Office, Warehousing Sadan, Behind Gandhi Bhavan, P.B #34, Nampally, Hyderabad - 500001. (Rr Agarwal)
Removal and Replacement of Existing Expansion Joints ROB Madhira in Khammam District. (Sub work: Providing Road margins and sighns for Road Safety Intervensions for the Rectification of Black Spot from km 0/1-0/5)
FDR to Open cast to timmaraopet mines road from Km 0/0-1/4,2/2-4/0,9/4-9/8 & 13/4-15/0(including Reconstruction of Box culvert 1V of 3x3M at Km.24/4-6 and Reconstruction of Pipe culvert 2V at Km.24/6-8)(Working reach Km 0/0-0/7, ... Providing Road Safety Interventions
Providing Road Safety Interventions (sub work) for CRF works A. Dammaigudem - Solipuram road from km 0/0 to 13/4 and Km 18/8 to 19/4 in Khammam District, B. Tanikella - Tatipudi road via Ammapalem, Peddagopati, Chennagopati, Peddamunagala, Chinnamunagala road from Km 0/0 to 18/4 in Khammam District, C. Venkatapuram - Kusumanchi road from Km 0/0 to 13/4 and 18/8 to 19/4 in Khamma District and D. Nelakondapally - Paleru road from Km 0/0 to 13/4 and 18/8 to 19/4 in Khammam District
FDR to (1)Shamirpet -Ghatkesar Road from km 0/0 to 22/6.(2) Peerzadiguda- Jodimetla road from km 1/0 to 2/450 (3) Nagaram to Keesara gutta Road from km 5/6 to 8/720 (Appropriate reaches) and (4) Kushaiguda -Ghatkeshar road from km7/4 to 13/550 in ... :- Road safety Intervention ...
Maintenance of BT Roads, CC Roads and Storm Water Drains (Catchpit repairs) under road safety drive for 4.5 months in Puranapool ward-102, Charminar Circle-28, CRZ Zone, GHMC F-Y 2026-27 (Rs.4.95 lakhs)
Maintenance of BT Roads, CC Roads and Storm Water Drains (Catchpit repairs) under road safety drive for 4.5 months in Qazipura ward-100, Charminar Circle-28, CRZ Zone, GHMC F-Y 2026-27 (Rs.4.95 lakhs)
Maintenance of BT Roads, CC Roads and Storm Water Drains (Catchpit repairs) under road safety drive for 4.5 months in Ghanibazar ward-101, Charminar Circle-28, CRZ Zone, GHMC F-Y 2026-27 (Rs.4.95 lakhs)
Maintenance of BT Roads, CC Roads and Storm Water Drains (Catchpit repairs) under road safety drive for 4.5 months in Puranihaveli ward-97, Charminar Circle-28, CRZ Zone, GHMC F-Y 2026-27 (Rs.4.95 lakhs)
Maintenance of BT Roads, CC Roads and Storm Water Drains (Catchpit repairs) under road safety drive for 4.5 months in Haribowli ward-99, Charminar Circle-28, CRZ Zone, GHMC F-Y 2026-27 (Rs.4.95 lakhs)
Emergency Repairs from km 8/0 to 25/0 (Kaleshwaram to Mahadevpur of Jayashankar Bhupalpally District) section of NH-353C (Road Safety Interventions and protection works) in view of Saraswathi Pushkaralu-2025 in the state of Telangana.
Maintenance of BT Roads, CC Roads and Storm Water Drains (Catchpit repairs) under road safety drive for 4.5 months in Qazipura ward-100, Charminar Circle-28, CRZ Zone, GHMC F-Y 2026-27 (Rs.4.95 lakhs) (3rd Recall)