Loading…
Loading…
15 live3 closing this weekmost from Energy Department Uttar Pradesh and IndianOil
15 results • Best match
PLC UPS LNUX 110 5KVA220VAC
Supply of PLC controller for centrifuge M/c
PROVN OF SCADA FOR STP AND IRP UNDER GE EAST BAREILLY
Capacity 11KV, Ring Main Unit (RMU) 3 Way (2 Load Break Switch+ 1 Breaker) Motorized & Scada Enable ( 40 Unit ), 33KV, Ring Main Unit (RMU) 3 Way (2 Load Break Switch+ 1 Breaker) Motorized & Scada Enable ( 4 Unit ), Scada Enable ( 2 Unit )
Supply, Installation, Testing and Commissioning of 700 Digital Water Level Recorder (DWLR) (Non-Vented pressure type) with Telemetry, including fencing and establishment of Data Acquisition system along with its maintenance etc
Supply, installation and commissioning of 3 nos. of PLC based auto merging system (auto diverters) including mechanical installation and PLC programming at 1 IWCU rejection loops, 1 OLD rejection loops and 1 VLD rejection loops at Etawah BP
Comprehensive, Preventive and Breakdown maintenance of SCADA system for twelve months in between Panki-Ghaziabad section of Prayagraj division of North Central Railways
Supply, installation, commissioning, testing, training and prove out test of Automatic SCADA based full Rake Test Rig for wagons as per attached Annexure-A
Provision for Addition of FTP Communication on Existing Workstation toEstablish Real Time SCADA Da ta Transfer to QCA for NTPC Unchahar 10 MWp Solar Power Plant
IT HARDWARE REPLACEMENT AND COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT OF DEPOT AUTOMATION SYSTEM FOR 3 YEARS AT SHAHJAHANPUR DEPOT SHAHJAHANPUR UNDER UTTAR PRADESH STATE OFFICE II
Supply, Erection, Testing & Commissioning of Automatic Fire Alarm and Detection System (FADS) for system-I SP/SSP/TSS control room building and communication to TPC board DDU at OCC PRYJ through SCADA system for section from DGON to KWDN of DDU Unit under CGM/DDU.
Annual operation and maintenance contract AOMC of 1 Nos 33/11 KV substation, 13 Nos 11/0.433 KV substations and PLC panels, AMF panel and LT Panels, AMF panels and LT panels of all DG set and petty electrical works of substations, udg. dist. etc.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - SCADA work; Switchyard, Substation; As per tender
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Substation; Substation, Switchyard, Power House Equipment, Electrical System or Installation, SCADA; Service Provider
Investigation, Survey (On G.I.S. Basis) Construction of Waste Stabilization Pond 600 KLD,100KLD with 3KLD co-treatment plant I and D of drain and Structure treated effluent line with SCADA etc