Loading…
Loading…
1,736 results • Best match
G00720600072054003, G00720600072055003, G00720600071001003, G00722600002001036, G00720600049055004, G00720600049001004, G00720600051057098, MA16PIK43100000101
Gasket for Heat Exchanger E-2202
AP3301073, AP3301096, AP3301097, AP3301098, AP3301736, AP3301756, AP3301758, AP3301759, AP3301794, AP3301804
1.1 KV GRADE STANDARD ALUMINIUM CONDUCTOR SIZE 1C X 185mm2, 1.1 KV GRADE STANDARD ALUMINIUM CONDUCTOR SIZE 1C X 16mm2, FLEXIBLE CABLE
Threaded Bush Item sr. No. E for both type of above spindle as per drawing NFVP/MB/; MOC: Brass For, Spindle D-3 for actuator of MF-9.1A/B -10.6 A/B & MF4/24 as per drawing NFVP/MB/; MOC: EN-24, Spindle D-2 for actuator of MF-7A/B as per drawing NFVP/MB/; MOC: EN-24, Spindle D-1 for actuator of MF-30 as per drawing NFVP/MB/; MOC: EN-24
Gland bracket for pump; M. O. C: ASTM-A-536Gr60; Dwg No. NFV/A/M-182
1100 Volt HR PVC insulatedelectrolytic annealed multistranded Copper conductor FRLS PVC sheathed, 3C x 120 sq. mm, 1.1KV Grade, XLPE insulated, Multi-Stranded Aluminium Conductor, PVC, 1.1 KV Conpper Control Cable, Armoured Cable of size 7x2.5 Sq mm
Lithium Bromide
DOSING PUMP GLAND PACKING, HYDRAZINE PUMP GLAND PACKING, AMMONIA DOSING PUMP GLAND PACKING, PHOSPHATE DOSING PUMP GLAND PACKING
SULPHURIC ACID TECHNICAL GRADE with min. Purity 98% w/w CONFORMING TO IS 266/1997
G00030010000001236 - WIRE MESH
Pre Amplifier card S61 suitable for fully insulated 1200 mm & 1700 mm Rope type capacitance probes, RF-Capacitance type level switch NIVOLAM ALC 830, Full insulated rope probe of 1700mm length to used in capacitance type level controller(NIVO ALC830), Full insulated rope type probe of 1200mm length suitable for capacitance type level controller
CHECK VALVE, 6" - 2500#, GLOBE VALVE, Size 4" x 2500#, GLOBE VALVE, Size 6" x 2500#
E-cart for Goods (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6794425 Dated : 04-11-2025 Bid Document 1/7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Watermist and Caf Fire Extinguisher Low Pressure Back Pack Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Repair, Inspection & HSB of K-3421 Rotor (LPC) ., Repair, Inspection & HSB of K-3421 Rotor (HPC) .
PROTABLE INDUSTRIAL MANCOOLER PEDESTAL
Pneumatic Valve
E-RICKSHAW BATTERY
MP06GB6MK101VAM000, MP06GB6MK101VAM001, MP06GB6MK101VAM002, MP06GB6MK101VAM003, MP06GB6MK101VAM004, MP06GB6MK101VAM005, MP06GB6MK101VAM006, MP06GB6MK101VAM007, MP06GB6MK101VAM008, MP06GB6MK101VAM009
Nitrogen, Compressed Gas and Liquid conforming to IS 1747 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6381707 Dated : 25-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Universal Loop Indicator
PIPE FOR NG LINE
CONC.SYSTEM LIQUID BIO SYSTEM, CONC.WASHING OLUTION BIO SYS 100 ML, CONC.ROTTER WASHING SOLUTION R BIO SYS, HALOGEN LAMP 12V BIO SYSTEM, HCL BIO SYSTEM, HDL CHOLESTEROL CALIBRATOR BIO SYSTEM, MULTIPLE CALIBRATOR KIT BIO SYSTEM, MULTIPLE CONTROL KIT BIO SYSTEM 1X5, ROTTER UNIT BIO SYSTEM
CORRUGATED BOX PSB, CORRUGATED BOX ZSB, CORRUGATED BOX NPK
DE-HUMIDIFIER
IG1030020020080001, IG1030020020080901, IG1030020020080002, IG1030020020080010, IG1030020020080026, IG1030020020080017, IG1030020020080020, IG1030020020080028, IG1030020020080011
MA31ST00T381331601, MA31ST00T381331602, MA31ST00T381331603, MA31ST00T381331604, MA31ST00T381331605, MA31ST00T381331606, MA31ST00T381331607
LIQUID CHLORINE
STAR WASHER, WASHER LOCK
Grinding Wheel (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6671646 Dated : 11-09-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
MU02CF00M002536100, MU02CF00M002536200, MU02CF00M002536300, MU02CF00M002536400, MU02CF00M002567600, MU02CF00M002567700, MU02CF00M002579000, MU02CF00M002591600
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Exemption for Years of Experience and Turnover
G00480005110000000, G00480000917000000, G00480002254000000, G00480003154000000, G00480007684000000
DP4001788, DP4001789, DP4001790, DP4001791
Rubber MATS
CABLE
COUPLING HALF-BORED FOR TURBINE SHAFT PN, SS DISC PACK P/N120357 FOR 263 DBZ-C THO
V - Belts - Endless V - Belt for Industrial Purposes as per IS 2494 (Q3), V - Belts - Endless Narrow V - Belts for Industrial use as per IS 14261 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6892490 Dated : 14-11-2025 Bid Document 1/9 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Primary product category V - Belts - Endless Narrow V - Belts for Industrial use as per IS 14261 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
MA04PP00P332367701, MA04PP00P332367702, MA04PP00P332367703, MA04PP00P332267600, MA04PP00P332273900, MA04PP00P332267601
Centre Drill -as per IS 6708, IS 6709 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6907880 Dated : 19-11-2025 Bid Document 1/11 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Primary product category Centre Drill -as per IS 6708, IS 6709 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Item-01, Item-02
VERTICAL PUMP
CAUSTIC SODA LYE
Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6725275 Dated : 25-09-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LOAD CELL
AIR COMPRESSOR
Magnetic Filter for VAM
Set of Bolts for Coupling Rupex RWN-1000, Set of Bolts for coupling Rupex RWN-450
MU02PP00P213604600, MU01PP00P213609100, MU02PP00P213645100, MU02PP00P213667600, MU02PP00P213667700, MU02PP00P213667800, MU02PP00P213679200, MU02PP00P213679300