Loading…
Loading…
3,759 results • Best match
Relaying of 200mm dia and 300mm dia UGD pipe line in Malleria Hospital 6th Cross road from Malleria office Main road to Padmavathi Ghat road,Sathish kumar road from D.No. 41-23-27 to Cross road and Malleria Hospital Main road from 4th Cross road to 6th Cross road in Bhramaramba puram in 24th Division Work division 3 area 1st call General Funds
Laying of pipe line, UGD line and CC road at Bandla Bazar in Div.no.13 Under AE-8 Section (5th call)
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling, Retaining Walls etc., in the approved Layouts at Jakkampudi of Vijayawada Municipal Corporation in Krishna District Andhra Pradesh under AHP-PMAY-HFA (U) with 2 Years defect liability Period under Lump sum contract
Investigation, Detail Design, Construction of smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power & ICT, Reuse waterline, Pedestrain tracks, Cycle tracks, Avevue Plantation & Street Furniture etc., in E10, E14 and N16 Roads (Package-VIII) in Amaravati Capital City, Andhra Pradesh on EPC Basis.
Investigation, Detail Design and construction of smart trunk infrastructure with Roads, Storm water drains, water supply network, Sewerage network utility ducts for power & ICT, reuse waterline, pedestrian tracks cycle tracks avenue plantation & Street furniture etc., in E6, E8, E12 and N11 roads (Package- X) in Amaravati Capital City, Andhra Pradesh
Investigation, Detail Design and Construction of Smart Trunk Infrastructure with Roads, Strom water drains, Water supply network, sewerage network, utility ducts for Power & ICT, Reuse waterline, Pedestrian tracks, Cycle tracks, Avenue Plantation & Street furniture etc., in N8 & N10 Roads (Package-XIII) in Amaravati Capital City Andhra Pradesh on EPC Basics.
Maintenance of sewerage network in areas of NGGO s Colony, Murali Nagar, Madhavadhara, Madhavadhara Vuda Layout, Marripalem, Marripalem Vuda layout, Karasa, Santhi Nagar, R.P. Peta, Gavara Kancharapalem etc., including all JNNURM colonies in Wards 49 to 54, 56p & 57 under AE-19&20 section of GVMC for the year 2022-23.
Expression of interest for selection of agency for preparation of Detailed Project Report for the work of Providing new sewerage network, 05 MLD STP, sump cum pump house and pumping mains in Srikakulam Municipal Corporation of Srikakulam District including preparation, survey, design and drawings, estimation and datas for all components proposed
Construction of Physical Infrastructure such as Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling, Retaining Walls etc., in the approved Layouts at Jakkampudi of Vijayawada Municipal Corporation in Krishna District Andhra Pradesh under AHP-PMAY-HFA (U) with 2 Years defect liability Period under Lump sum contract
Expression of interest for selection of agency for preparation of Detailed Project Report for the work of Providing new sewerage network, 05 MLD STP, sump cum pump house and pumping mains in Srikakulam Municipal Corporation of Srikakulam District including preparation, survey, design and drawings, estimation and datas for all components proposed
Expression of interest for selection of agency for preparation of Detailed Project Report for the work of Providing new sewerage network, 05 MLD STP, sump cum pump house and pumping mains in Srikakulam Municipal Corporation of Srikakulam District including preparation, survey, design and drawings, estimation and datas for all components proposed
Expression of interest for selection of agency for preparation of Detailed Project Report for the work of Providing new sewerage network, 05 MLD STP, sump cum pump house and pumping mains in Srikakulam Municipal Corporation of Srikakulam District including preparation, survey, design and drawings, estimation and datas for all components proposed
Investigation, Detail Design and construction of smart trunk infrastructure with Roads, Storm water drains, water supply network, Sewerage network utility ducts for power & ICT, reuse waterline, pedestrian tracks cycle tracks avenue plantation & Street furniture etc., in E6, E8, E12 and N11 roads (Package- X) in Amaravati Capital City, Andhra Pradesh
Engaging of 1 No of 8 KL Capacity truck mounted sewer suction cum jetting machine at A.E-8 & 9 Section for 2,3,4,5,6,7,8 to 19 Divisions in Work Division - III area in Vijayawada Municipal Corporation on hire basis for a period of 6 Months (Rc.V1-104830/2025)
Engagaing of 1 no of 8KL capacity truck mounted sewer suction cum jetting machine for 23rd, 24th, 25th and 26th divisions in AE-5 section works division-II on hire basis for a period of 4 months from June to Septemeber 2025. (Rc.V1-109142/2025) 2nd call
Providing of Manholes to the culvert slabs at 8/283,8/296-2,8/232-2,8/1160 in 38th Division of Kadapa Municipal Corporation
GGMP-Providing Under Ground Drainage line and Construction of Manholes at Arundal peta 8th line and Construction of CC Drains to Arundal peta 7/4 th cross road from 7th line to 10th line and Arundalpeta 7th line from 7/3 rd line to Donka road and Construction of RCC culverts at Arundalapeta 4/4 and 4/5 lines in Div.No.52 under AE-1 section
GGMP-Providing Under Ground Drainage line and Construction of Manholes at Arundal peta 8th line and Construction of CC Drains to Arundal peta 7/4 th cross road from 7th line to 10th line and Arundalpeta 7th line from 7/3 rd line to Donka road and Construction of RCC culverts at Arundalapeta 4/4 and 4/5 lines in Div.No.52 under AE-1 section
Maintenance of sewerage network in areas of NGGO s Colony, Murali Nagar, Madhavadhara, Madhavadhara Vuda Layout, Marripalem, Marripalem Vuda layout, Karasa, Santhi Nagar, R.P. Peta, Gavara Kancharapalem etc., including all JNNURM colonies in new Wards 49 to 54, 56p & 57 under AE-19&20 section of GVMC for the year 2021-22
Sewerage Collection and conveyance system in Pendurthi Area including construction and commissioning of Waste Water Treatment Plant and Teritiary Treatment of output capacity of 46 MLD on open technology which can meet the desired water quality parameters, product water pumping machinery and conveyance mains to industries with O&M for 15 years
Sewerage Collection and Covneyance System in Pendurthi area including Construction and Commissioning of Waste Water Treatment Plant and Teritary Treatment of output capacity of 46 MLD on Open Technology which can meet the desired water quality parameters, product Water pumping machinery and conveyance mains to industries with O&M for 15 years
Construction of Balance Physical Infrastructure such as Internal Roads, Storm Water rains, Water Supply, Sewerage Network, Septic Tank etc., in the approved layouts at Pamidi, Gooty, Hindupur, Puttaparthi, Kadiri, Anantapuramu and Rayadurgam in Anantapur District under Phase-II& III AHP-PMAY-HFA (U) with 2 years defect liability period under Lump sum Contract
Supply & Delivery of (01) No of Combained High Pressure Jetting and Sewerage Suction Machine Capacity 8000 Lts Truck Chassis 16 Tonnes GVW, BS-VI and Drivers Cabin and Side PTO Cum Suction Machine Capacity 8000 Lts for Drains Silt Removal to Municipal Corporation Nellore Under Tied Grant of 2021-22 (1st & 2nd instalments)
Supply & Delivery of (01) No of Combained High Pressure Jetting and Sewerage Suction Machine Capacity 8000 Lts Truck Chassis 16 Tonnes GVW, BS-VI and Drivers Cabin and Side PTO Cum Suction Machine Capacity 8000 Lts for Drains Silt Removal to Municipal Corporation Nellore Under Tied Grant of 2021-22 (1st & 2nd instalments)
Construction of Physical Infrastructure such as Internal Roads Storm Water Drains Water Supply Sewerage Network Court Yard Filling etc in the approved layouts at Anantapuramu Guntakal and Rayadurgam ULBs of Anantapur District Andhra Pradesh under AHP-PMAY-HFA (U) with 2 years defect liability period under Lump sum Contract (Percentage Tender)-phase-III
Package XXXXXVIII Construction of Roads, Drains, Water supply, sewerage, utility dicuts for Power & ICT,Reuse waterline, STP & Avenue Plantation, compatible with Trunk Infrastructure in Layouts for Land Pooling Schemes for Undavalli village in LPS Zone -11 area on lumpsum contract(% tender) including DLP of 2 years in Amaravati Capital City, Andhra Pradesh.
Supply & Delivery of (01) No of Combained High Pressure Jetting and Sewerage Suction Machine Capacity 8000 Lts Truck Chassis 16 Tonnes GVW, BS-VI and Drivers Cabin and Side PTO Cum Suction Machine Capacity 8000 Lts for Drains Silt Removal to Municipal Corporation Nellore Under Tied Grant of 2021-22 (1st & 2nd instalments)
Sewerage Collection and Covneyance System in Pendurthi area including Construction and Commissioning of Waste Water Treatment Plant and Teritary Treatment of output capacity of 46 MLD on Open Technology which can meet the desired water quality parameters, product Water pumping machinery and conveyance mains to industries with O&M for 15 years
Supply & delivery of Manhole Covers (H.D 20 with 75 mm thick) for Maintenance of Under Ground Drainage in Tadipatri Municipality
REPLACING OF DAMAGED UGD LINE AND PROVIDING CC ROADS & CC DRAINS AT RAJANALA VARI STREET DIV.NO.13 UNDER AE-8 SECTION (6th call)
Laying of CC Roads from D.No. 4-4-716 to D.No. 4-4-725, D.No. 4-4-799/1 to D.No. 4-4-8008A, Chinna Ganagamma Temple D.No. 4-4-1057 to Bindu Medicals, IS Mahal Road and UGD line and D.No. 4-4-1057 to Bindu Medicals, Nehru Ngar in Ward No. 30 15th FC -2023-2024 (Ist Installment) untied Grant.(2nd Call).
Construction of CC drain from D.No. 19-4-149/58 to 19-4-149/67, Laying of CC Road from D.No. 19-8-116/C to 19-8-115/A, Water Supply pipeline from d.No. 19-12-255/A to 19-4-148/21 and Replacement of damaged UGD line from D.No. 19-8-114/A to 19-8-112 in Ward No. 15.
Engaging of 1 no. of 8KL capacity truck mounted sewer suction cum jetting machine with labour at AE-9 section for 6th, 7th, 8th and 19th divisions in work division-III area in Vijayawada Municipal Corporation on hire basis for a period of 6 months Rc.V1-100256/2025
Construction of Indoor Sports Complex including internal water supply , sanitary installations, Drainage, IEI & Fans, Fire Fighting with Downcomer system, Addressable Fire Alarm system, CCTV system LAN networking system and Development works like UG ... External sewerage , ... External sewerage , ...
NUDA - Construction of Balance 60 ft CC Roads and restoration of UGD networkincluding site levelling nearby existing canal towards east side Kavali MIG layout
Providing CC Drain, CC Road, 110mm dia HDPE and UGD Line at Yadava Bazar 1/2 line in Div.No.09 under AE-13 Section.
Investigation, Detailed Design and Construction of smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, utility Ducts for Power & ICT, Reuse waterline, Pedestrian tracks, cycle tracks, Avenue Plantation & Street Furniture etc., in E7, E9, E11, N3A and N3B Roads in Amaravati Capital City, Andhra Pradesh on EPC Basis (Package-XII)
Investigation ,Detail design and construction of smart trunk infrastructure with roads ,Storm water drains, Water supply network,sewerage network,Utility ducts for power &ICT ,Reuse water line ,pedestrian tracks ,cycle tracks,Avenue plantation & street furniture etc . in E16, N12,N15 and N17 Roads ( Package XIV ) in Amaravati , Capital city of AndhraPradesh on EPC Basis
Construction of Physical Infrastructure such as Roads, Drains, Culverts, ELSR,GLSR,External water supply Mains, Sewerage Lines ,Site Levelling,PumpRoom,ApproachRoad,Double Lane Road Bridge,STP and Trunk infrastructure at OngoleMuncipal Corporation (Chintala & Koppolu) and Markapur(Peddanagulavaram Road) ULB's at Prakasam District under PMAY-HFA(U), with 2 years defect liability period under lumpsum Contract.
Investigation, Detailed Design and Construction of smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, utility Ducts for Power & ICT, Reuse waterline, Pedestrian tracks, cycle tracks, Avenue Plantation & Street Furniture etc., in E7, E9, E11, N3A and N3B Roads in Amaravati Capital City, Andhra Pradesh on EPC Basis (Package-XII)
Construction of Balance Physical Infrastructure such as Internal Roads, Storm Water rains, Water Supply, Sewerage Network,Septic Tank etc., in the approved layouts at Pamidi, Gooty, Hindupur, Puttaparthi, Kadiri, Anantapuramu and Rayadurgam inAnantapur District under Phase-II& III AHP-PMAY-HFA (U) with 2 years defect liability period under Lump sum Contract (2nd c all)
Construction of balance smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse waterline, Pedestrian tracks, Cycle tracks, Avenue Plantation and Street Furniture etc in N10 Road in Amaravati Capital City on Lump Sum Contract (Percentage Tender) including DLP of 2 Years (Package XXXIII)
Construction of balance smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse waterline, Pedestrian tracks, Cycle tracks, Avenue Plantation and Street Furniture etc in E10 Road in Amaravati Capital City on Lump Sum Contract (Percentage Tender) including DLP of 2 Years (Package XXIX)
Construction of Balance Physical Infrastructure such as Internal Roads, Storm Water rains, Water Supply, Sewerage Network,Septic Tank etc., in the approved layouts at Pamidi, Gooty, Hindupur, Puttaparthi, Kadiri, Anantapuramu and Rayadurgam inAnantapur District under Phase-II& III AHP-PMAY-HFA (U) with 2 years defect liability period under Lump sum Contract (2nd c all)
RFP for engagement of Project Management Consultant (PMC) for the work 'Construction of Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse Waterline, Pedestrian Tracks, Cycle Track, Avenue Plantation and Street Furniture in E11, E13, E15, N8 and N13 roads including DLP 2 years in Amaravati, Andhra Pradesh
Construction of balance smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse waterline, Pedestrian tracks, Cycle tracks, Avenue Plantation and Street Furniture etc in N8 Road in Amaravati Capital City on Lump Sum Contract (Percentage Tender) including DLP of 2 Years (Package XXXII)
Construction of balance smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse waterline, Pedestrian tracks, Cycle tracks, Avenue Plantation and Street Furniture etc in N2 Road in Amaravati Capital City on Lump Sum Contract (Percentage Tender) including DLP of 2 Years (Package XXI)
Construction of balance smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse waterline, Pedestrian tracks, Cycle tracks, Avenue Plantation and Street Furniture etc in N14 Road in Amaravati Capital City on Lump Sum Contract (Percentage Tender) including DLP of 2 Years (Package XXXIV)
Construction of balance smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse waterline, Pedestrian tracks, Cycle tracks, Avenue Plantation and Street Furniture etc in E4 Road in Amaravati Capital City on Lump Sum Contract (Percentage Tender) including DLP of 2 Years (Package XXVIII)
Construction of balance smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse waterline, Pedestrian tracks, Cycle tracks, Avenue Plantation and Street Furniture etc in N17 Road in Amaravati Capital City on Lump Sum Contract (Percentage Tender) including DLP of 2 Years (Package XXXVI)