Loading…
Loading…
6,996 results • Best match
CONSTRUCTION OF DRAIN WITH COVER SLAB AND CULVERT AT LANE INFRONT OF HOUSE OF JHONTU DA, R.N GUHA ROAD AND RAMGARH and REPLACING OF MANHOLE AT DIFFERENT PLACES IN WARD NO-08
Development of Mastic Road and Drain with Cover Slab and Manhole Cover from 122 K.M.D Road (Opp. to 3no Rail Gate Sishu Udyan) to 45/6 K.M.D Road in ward no - 02.
REMOVAL OF SILT FROM SURFACE DRAIN, MANHOLE, CATCH PIT, AND DEPLOYMENT OF LABOUR FOR CHOCKING S/W LINE WORKS AT HALDER PARA, MURRY ROAD, D ETC IN WARD NO-137, BR-XV.
Development of Bituminous Road and Drain with Cover Slab and Manhole Cover from House of B.K Guha to end of Mailakhana More Houes of Saha House (Bankim Park) in Ward no - 07.
EXECUTION OF RESIDUAL WORKS OF KEIIP-FOR CATCH PITS, MANHOLE COVER AND HOUSE CONNECTION AT BANDIPUR ROAD, DAKHIN ANANDA PALLY, NIRANJAN PALLY AND ITS SURROUNDING UNDER BOROUGH-XI, IN WARD NO 113
Upgradation of Concrete Road, Culvert and Manhole Raising at Monosa Colony Uchu Plot (1) from the house of Swapan Das to house of Shyamal Das in Ward No. 34, Under Bhatpara Municipality.
Replacement of Manhole and Sludge cleaning periodical throughout the monsoon of surface cover drain from ch 7.75 km to 8.5 km on D H Road Eastern side during the year 2023 24
Laying of 1600 mm diameter MS pipeline for interconnection purpose alongwith installation of MS Blank and 600 mm dia manhole assembly at the northern side of Central Warehousing Corporation on Taratala Road.
Replacement of Manhole and Sludge cleaning periodical throughout the monsoon of surface cover drain from ch 9.000 km to 9.8 km on D H Road Western side during the year 2023 24
Renovation of drain with manhole Rising at Nilratan Mukherjee Road AND upgradation of drain with cover slab 4/3 Ramji Hazra Lane to 5 Ramji Hazra Lane under Ward No. 26, HMC
Replacement of Manhole Cover on existing cover drain (hume pipe) on Concrete Road std from shop of Farak to H/O. Sawnaj Hossen at Bokopara in Ward No. 07 Under Madhyamgram Municipality.
Construction of drain with RCC cover slab and Manhole cover slab from the house of Binod Shaw (Black smith Shop) upto Dhopa Goli in ward no. 22 and 23 under Naihati Municipality.
RELAYING OF KERB AND CHANNEL STONE ALONG WITH RAISING AND LOWERING OF MANHOLE COVER AND GULLY PIT COVER AT WATER LOO STREET AND SURROUNDINGS AREA IN WD-46 UNDER BR-V I
Providing structural design and drawings of ADM Block G plus 2, Quarter Guard G plus 1, MI Room 10 Bed, 120 Men Barrack G plus 3 & GOs Mess G plus 1 including proper designing of bulk services and development work for water supply system, substation ... paths, sewerage system, ...
RENOVATION OF LATRINE BATHING PLATFORM AND SEWERAGE SYSTEM AT 2, AMIYA HAZRA LANE, 2, MOTT LANE, 6, UMA DAS LANE, AND ADJACENT AREA IN WARD NO. 52
R and R work for provision of laying Mastic asphalt with bituminous Macadam leveling course, Car Parking making and provision of underground sewerage line at Bikash Bhavan.
Repair and reconstruction of surface drainage with RCC cover and underground sewerage system and cleaning at the campus of IAH_VB _R_T_ at 37 Belgachia Road Kolkata- 700037
Estimate for providing gully pit chamber, paver block and pvc pipe for sewerage system from Ramkrishna Pall to Matish Roy bridge auto stand in Ward No-11
Laying of new sewerage line at East Bengal Club under Salt Lake Survey Sub-Division of Salt Lake Reclamation Division under Salt Lake Reclamation Development Circle (SLRDC).
Emergent repair work of underground sewerage line and other related works near Ezra and Shyamacharan building at Kolkata Medical College and Hospital, during the year 2025-26.
IMPROVEMENT OF SEWERAGE SYSTEM WITH ANCILLARY WORK FROM 1A TO 2/5B, SHAH AMAN LANE AND SURROUNDING AREA IN WARD NO.- 78 (APAS/01/158/164/0001)
Cleaning Sewerage line including inspection pit at the compound of Baghajatin State General Hospital and K.S Roy T.B Hospital, Jadavpur, Kolkata-700092 during the year 2022-23 .
REPAIRING AND MAINTENANCE WORK AT TOILET BLOCK, INCLUDING SEWERAGE LINE ETC JUST BEHIND THE WEIGH BRIDGE ROOM ALONG WITH OTHER ALLIED CIVIL WORK UNDER ASPHALTUM DEPARTMENT, P.B.
NRSMC H Repair and Restoration of damaged compound road due to of damaged Underground sewerage line near MSVP office using concrete blocks for the FY 2025 26
DEVELOPMENT OF SEWERAGE SYSTEM WITH ANCILLARY WORKS AT SUDAM SIL ST. FROM X-ING OF RATU SARKAR LN. TO ZAKARIA ST. IN WARD NO 44. (PS-16)
Up-gradation of Southern side damaged Service Road of Street No 3333 due to failure of PHED sewerage line near intersection of AA IIIA in Newtown Kolkata
RM for all Ancillary Buildings including Operational Building, Sewerage, Drainage and Water Supply in City Side at NSCBI Airport, Kolkata for the year 2024 25 2025 26
Changing of sewerage lines, making of inspection pits, gully pits in front of transformer room 2 at Western Block of Ballygunge Sc. College Campus, University of Calcutta.
Upgradation of back side back side New three toilets block and change damage sewerage pipeline at backside of Barrack III inside DDCCH during the year 23 24
DEVELOPMENT OF SEWERAGE SYSTEM AND ROAD AT NIL MADHAB SEN LANE FROM JN. OF K.B. SEN STREET TO JN. OF BHAWANI DUTTA LANE IN WARD NO.44.
IMPROVEMENT OF SEWERAGE SYSTEM IN FRONT OF 3, 71, MALANGA LANE, 8, 9, 13, GANGA DHAR BABU LANE ETC. AND ADJACENT BUSTEE AREA IN WARD NO. 047.
IMPROVEMENT OF SEWERAGE SYSTEM WITH ANCILLARY WORK AT 24/H/8, 24/H/6, KABITIRTHA SARANI AND ETC. IN WARD NO.- 75(APAS/01/158/250/0014)
IMPROVEMENT OF BUSTEE SEWERAGE SYSTEM AT FROM 2C/H/3 CHATU BABU LANE TO 2C/H/10 CHATU BABU LANE AND ADJACENT AREA IN WARD NO. 55.
REPAIR OF COLLAPSED SEWERAGE SYSTEM AT DIFFERENT PLACES VIZ. NASKAR PARA ,SAPUI PARA, BIRJI KISHORE SANGHA (UTTARAN AREA) AND OTHER AREA IN WARD NO.-110,BR.-XI
REPAIR,S TO SEWERAGE SYSTEM AND ROAD SIDE CHANNEL AT 10A ABINASH MITRA LANE,NAYAN CHAND DUTTA STREET AND OTHER,S IN WARD NO 017 BOROUGH -II
MAINTENANCE OF SEWERAGE SYSTEM NEAR 2/188, 2/149, 2/164, 2/201,2/177 BIJOYGARH ETC IN WD-096,BR.X (APAS ID- APAS/01/150/240/0002)
New Sewerage Line Laying from 144/145, J.N. mukherjee Road to Sibogopal Banerjee Lane and Renovation of Drain at Sibogopal Banerjee lane, Under H.M.C. Ward No. - 04.
Construction of new sewerage connection for Benfish new office building at Dag no. 502, Dhapa Manpur, Sec- IV, Saltlake Within Ward No.- 35, under Bidhannagar Municipal Corporation.
Plinth protection Garbage cleaning and Sewerage line around the underground reservoir at back side of Bhabani Bhawan main building Alipore Kolkata 27 during the year 2025 2026
Cleaning of yard gullies Inspection pits U G Sewerage lines Uprooting jungle cutting Rubbish cleaning at compound of Gardenreach S G Hospital during the year 2026 27
All as per BOQ
IMP. OF DRAINAGE SYSTEM BY LAYING OF U/G SEWER AT BYE LANE OF R.B. ROAD NEAR PR. NO. 236 IN W-116.
Contractual operation and maintenance of 02 (two) Nos. of Open Nullah Desilting machine under South Division of Sewer Cleansing Department for two years.
MAINT. OF DRAINAGE SYSTEM PROVIDING U/G SEWER AT KALIPUR KANCHA ROAD (BYE LANE) NEAR H/O-BIMAL BISWAS, IN W/N.-122.
RESTORATION OF SEWER TRENCH FROM 38, G. J. KHAN ROAD TO 61B, TOPSIA ROAD (NEAR SELIM MARKET) IN WARD NO.-66, BR.-VII.
Refurbishment of Brick Sewer ( Double Barrel) along HDC Road from HIT Alok Dhara Complex to New Makardah Road ( Ashita Auto Service) under HMC
CONST. OF U/G SEWER AT SLUM AREA OF PRAGATI PALLY NEAR PRE. NO.- 767, M.G. ROAD BYE LANE, IN WARD NO-124
CHOKAGE REMOVAL OF SEWER AT DIFFERENT PLACES OF DIFFERENT ROADS IN WARD NO.-119 UNDER BOROUGH-XIII FOR THE NEXT 06 (SIX) MONTHS.
CONST. OF UG SEWER NEAR PRE. NO - 90, D.H ROAD BYE-LANE AND 925, KAILASH GHOSH ROAD BYE-LANE IN WARD NO -123.
MAINTENANCE OF UNDERGROUND SEWER INCLUDING DRAINAGE ADJUNCTS AT MUKTORAM GALI BUSTEE AT ROY BAHADUR ROY ROAD BYE LANE IN W-120 BR-XIII.