Loading…
Loading…
6,997 results • Best match
MAINTENANCE OF U/G SEWER INCLUDING RAISING, REPLACEMENT OF PIT-COVERS ETC.AT THE SLUM AREA OF BANGASREE PALLY, SHANTI PALLY, NIVEDITA SARANI ETC. IN WARD NO. 131.
MAINTENANCE OF U/G SEWER INCLUDING RELAYING, RISING, REPLACEMENT OF PIT-COVERS, ETC. AT THE SLUM AREA OF BASUDEVPUR ROAD, VIDYASAGAR COLONY, ETC. IN WARD NO. 128.
IMP. OF DRAINAGE SYSTEM BY LAYING OF U/G SEWER AT BYE LANE OF P.N. MITRA BRICK FIELD ROAD NEAR PR. NO. 26/1 IN W-116.
IMPROVEMENT OF U/G SEWER AND REPLACEMENT OF M.H,C.P AT DIFFERENT PLACES OF 31A, 31B, ETC. SHIL THAKUR BARI ROAD SURROUNDING AREA IN WARD NO.119
SUPPLY AND INSTALLATION OF 01(ONE) NO. WATER COOLER CUM PURIFIER MACHINE AT CENTRAL DIVISION OF MECHANICAL SEWER CLEANSING WING AT 7, PALMER BAZAR ROAD, UNDER KMC
MAINTENANCE OF U/G SEWER AT DIFFERENT PLACES AT S.N. CHATTERJEE ROAD, BROJEN MUKHERJEE ROAD, SAHAPUR MAIN ROAD BYE LANES ETC. IN W-119 UNDER BR.-XIII.
DEV. OF DRAINAGE SYSTEM BY LAYING OF U/G SEWER AT BYE LANE OF B.L. SAHA ROAD (SLUM AREA) NEAR PR. NO.-91/27 IN W-116.
CONSTRUCTION OF BUSTEE U/G SEWER IN THE BYE LANE OF RAJENDRA BANERJEE ROAD (SLUM AREA) NEAR PR. NO. 58/3 ,21 ETC. IN WARD NO. 130
DEV. OF DRAINAGE SYSTEM PROVIDING U/G SEWER AT USTAD AMIR KHAN ROAD BYE LANE NEAR PR. NO-19/10, 19/5 ETC. IN W/N-122.
DEV. OF DRAINAGE SYSTEM BY LAYING OF U/G SEWER AT BYE LANE OF B.L. SAHA ROAD NEAR L.P. NO. 4/25/2/3 IN W-116.
IMPROVEMENT OF SEWER AT 131/H/13 ,131/H/24, 147/B/H/14,147/B/H/12 R.R.L MITRA ROAD AND SURROUNDING AREA IN WARD NO 34
CONST. OF DRAINAGE SYSTEM BY LAYING OF U/G SEWER AT N.C. DAS ROAD BYE LANE NEAR PR NO 12/3 9/2 ETC IN W-120.
DEVELOPMENT OF U/G SEWER AT 51 NO BUSTEE (BISHALAKHSMI TALA ROAD BYE LANE) NEAR PR.-51/B/1, 51/C/8 ETC. IN WARD NO-132.
DEVELOPMENT OF ROAD and DRAINAGE SYSTEM BY PROVIDING C.C.ROAD ALONG WITH U.G SEWER AT NETAJI PALLY NEAR PRE. NO.- 21, 2/15 ETC. IN WARD NO- 124.
MAINTENANCE OF SEWER SYSTEM AT 1/H/58, GHOSHBAGAN LANE, B/6/H, KRIPANATH DUTTA ROAD AND OTHER UTTARAN AREAS IN WARD NO-006 UNDER BR-I
RESTORATION OF SEWER TRENCH BY LAYING HOT MIX AT 218 TALBAGAN, 20 CHAKDAH GOVT. COLONY, 595 PURBA PUTIARY, 322/4 ANADAPALLY ETC. IN WARD 114, BR. XI.
RESTORATION OF SEWER TRENCH BY LAYING HOT MIX AT 572 DAKHINPARA, 488 NATUNPALLY, 257 MISSION ANCHAL, A-33, B-11 DINESHPALLY ETC. IN WARD 114, BR. XI.
Renovation and Construction of main Nikashi Drain with necessary covered slab to protect garbage of kamahati Trenching ground including manhole cover beside , trenching ground salpata bagan from sripally culvert to Nilganj Road and onward to B T Road
MANUFACTURE, SUPPLY, FITTING - FIXING OF 2 NOS. 500 MM DIA MANHOLE ALONGWITH INSTALLATION OF 600 MM DIA SLUICE VALVE ON 600 MM DIA BUDGE BUDGE BPS RISING MAIN INCLUDING DEWATERING AND LIGHTING ARRANGEMENTS INSIDE GARDEN REACH STP COMPLEX.
Restoration of Concrete Road, Pakka drain, RCPC manhole at Railand Circular Road from Akta Club to Naru Gola and Community Toilet at Bangashree Quarter Lane under Booth No. 119 of Ward No.23 within Serampore Municipality APAS 257
Upgradation of Concrete Road with Manhole Raising at Sthirpara T.C.I. Link Road from Choto Shri Rampur house of Jatai Santra to Sthirpara Road Sal Bagan More via Ganesh Duba Khal Culvert in Ward No. 35, Under Bhatpara Municipality.
CLEANING AND REPAIR TO SEWAGE DISPOSAL, DRAINS, MANHOLE COVERS, DRAIN COVERS, CONNECTING PATH COMPOUND WALL, SECURITY WALL, FENCING, GATE AND CERTAIN REPAIR AT SAHAPUR AND OD ALIPORE AND TARATALA AND CLEANING AND REPAIR TO SEWAGE DISPOSAL, DRAINS, MA
Upgradation of Concrete Road with raising of Manhole and side Drain at Nag Bagan Bye Lane Ajay Chakroborty Gali from Sarvodaya Lodge to house of Shashtriya Sangeet Shilpi Pandit Ajoy Chakroborty in Ward No. 25, Under Bhatpara Municipality
Construction of drain with RCC cover slab from H/O. Lt. Mukulrani Das to H/O. Tapan Kumar Das and different areas, Fixing of manhole cover near Rajendra Apartment at Bankimpally in ward no.10 under Madhyamgram Municipality.
Supply, Installation and Commissioning of 2Kg/Hr Gaseous Chlorine Treatment Processing Plant for Baghajatin Sewerage Treatment Plant Under Kolkata Municipal Corporation including comprehensive Operation and maintenance for a period of 3 years
IPGMER-SSKM HOSPITAL ---- Supplying and Installation of different types of Monoblock pump, submersible pump, Sewerage motor set, Starter related to the water distribution system and allied works during the year 2023-2024
Design, Drawing, Construction and Commissioning of Complete Sewerage Network System in Turnkey Basis Under Infrastructural Development works at Footwear Park in Calcutta Leather Complex, Bantala, at 24Pgs(S) (Part-III) (2nd call)
IMPROVEMENT OF SEWERAGE SYSTEM INCLUDING RESTORATION WORK ETC. AT BELIAGHATA ROAD FROM 18 SHIB TALA LANE TO CROSSING OF NAFAR KOLEY ROAD IN WARD NO-36, BOROUGH-V, UNDER KMC. 2ND CALL
Replacement of overhead water tank including water supply line and urgent repair of sewerage line to the K B ward within the premises of Presidency correctional home during the year 2024-25.
Rejuvenation of existing STP along with Lifting Station and Pumping Station including Sewerage Network and 5 Years Operation and Maintenance at Baidyabati and Bhadreswar under Hooghly District in West Bengal. 2nd Call
SUPPLYING AND INSTALLATION OF SUBMERSSIBLE PUMP AND MOTOR INCLUDING INSTALLATION OF PUMP WITHELECTRICAL FITTING AND FIXING COMPLETE BY THE SIDE OF DUTTA PARA BYE LANE NEAR SEWERAGE LIFTING STATION , WARD NO. 07.
Sambhu Nath Pandit Hospital--Pre-monsoon works-Cleaning of underground sewerage line and surface drainage line within the premises of Sambhunath Pandit Hospital and P G Polyclinic during the year 2024-2025.
Periodical cleaning of under ground sewerage line, cover drain, inspection pit, gully pit, master trap in Presidency University, College street campus, and Eden Hindu Hostel, Kolkata 700073 during the year 2023 2024.
Kolkata Police Hospital and Ramrikdas Haralalka Hospital- Premonsoon Cleaning of Underground Sewerage line and surface drainage line including other ancilliary work within the compound of Kolkata Police Hospital and Ramrikdas Haralalka Hospital.
NEW CONSTRUCTION OF UNDER GROUND SEWERAGE LINES AND DRAINAGE STSTEM AT EAST SIDE OF APPLIED PHYSICS BLDG. ,FRONT SIDE OF M.N.SAHA BLDG. AND PART OF R.P.E. BLDG. AT RAJABAZAR SCIENCE COLLEGE CAMPUS.
R G Kar Medical College and Hospital Cleaning of under ground sewerage line cleaning compound premises roof of different building and removal of rubbish from hospital premises during the year 2025 26
IMPROVEMENT OF ROAD SURFACE BY CEMENT CONCRETE AND SEWERAGE SYSTEM AT GOALTULI LANE, 31, 33, COLLIN STREET (MASJID GALI) 120, S.N. BANERJEE ROAD (MANNA GALI) ETC. AND ADJACENT AREA INWARD NO.52.
IMPROVEMENT OF SEWERAGE SYSTEM WITH ANCILLARY WORK FROM 21B, TO 24/1, MOMINPORE ROAD, B/H/15/1, MAYURBHANJ ROAD AND SURROUNDING AREA IN WARD NO.- 78 (APAS/01/158/196/0001)
Development of underground sewerage system including compound development work in the campus of Salt lake MAKAUT Building, BF Block -142, Sector-I, Salt Lake City, Kolkata-64 during the year 2025-2026.
Supply, Installation and Commissioning of 10Kg/Hr Gaseous Chlorine Treatment Processing Plant for Bangur Sewerage Treatment Plant Under Kolkata Municipal Corporation including comprehensive Operation and maintenance for a period of 3 years
IMPROVEMENT OF SEWERAGE SYSTEM WITH ANCILLARY WORK FROM 2/1/H/1, TO 2/1A/H/5, NAWAB ALI LANE AND SURROUNDING AREA IN WARD NO.- 78. (APAS/01/158/163/0001)
Upgradation of U/G Sewerage Line due to Leakage and damaged of the NP3 Pipe in Front of Health and Science University, DD Block, Within Ward no 40 under Bidhannagar Municipal Corporation.
RENOVATION OF UNDER GROUND SEWERAGE SYSTEM AND OTHER FACILITIES WITH ROAD SURFACE AT 12, 38J KABI SUKANTA LANE, 34B , 57/3 NEW SANTOSHPUR MAIN RD. , ETC, IN WD. NO. 103., BR-XI.
IMPROVEMENT OF SEWERAGE SYSTEM WITH ANCILLARY WORK FROM 6 TO 6/1, EKBALPORE LANE, 4/2/H/4, MOMINPORE ROAD AND SURROUNDING AREA IN WARD NO.- 78 (APAS/01/158/171/0001)
Repair and maintenance of sanitary fixtures, damaged floor tiles, door and window fixtures if any, checking and cleaning of sewerage and drainage pipelines etc at New Administrative Building - II, Barasat, West Bengal.
SH Cleaning, repairs of drains i/c other civil works like maintenance of operational boundary wall and cutting of grass manually inside operational area.
DEVELOPMENT OF CC ROAD DUE TO LAYING OF U/G SEWER AT BARIK PARA ROAD BYE LANE NEAR PR. NO.- 11/1 IN WARD NO.- 119, BR-XIII.
MAINTENANCE OF UG SEWER AT 141/1 K.C. GHOSH ROAD, 4, SAMAR SARANI, 10/1A CENTER SINTHEE ROAD, 51/4, SOUTH SINTHEE ROAD ETC. IN WARD NO-002
RENOVATION OF U/G SEWER IN THE BYE LANE OF N. S. ROAD NEAR PR. NO. 73/4 AND 87 ETC. IN WARD NO. 130 (PART NO. 156)
IMPROVEMENT OF ROAD BY LAYING HOT-MIX BY DISTURBANCE OF U.G SEWER AT SODEPUR ROAD NEAR PR. NO.-263, 405, 293 ETC IN WARD NO.-122, BR.-XIII.