Loading…
Loading…
7,001 results • Best match
RESTORATION OF ROAD SURFACE TO BEDISTURBED BY CME CIVIL DUE TO DEVELOPMENT OF SEWER AT 121/Z/1, 121/Z/2 MANICKTALA MAIN ROAD AND THEIR SURROUNDING AREAS IN WARD NO.-32. (2ND CALL)
AS PER TENDER DOCUS
All as per BOQ
Development of Concrete Road and Drain with Cover Slab and Manhole Cover from House of Jaba Manna to Prasun Das and Drain from the House of Amiya Rani Pal to Dasgupta House and from House of Bikash Ghosh to Dr. Nikilesh Ghosh and Concrete Road from D
Dev Of C.C Road and cons of Drain with cover slab and cross culvert With Manhole Cover Near Srotoshini appt,Saptarshi appt,Arunalay Appt and ganesh appt Sabita appt Goli And H-O Pranab Banerjee and Gon Mama bari at R.N.Guha road(Golpark) in Ward no
Widening of Concrete Road at Kela Began from Kela Bagan Post Office More to Sonu Shop and Patch Repairing of Concrete Road from the house of Prem Kumar Singh to Dr. Navin Kumar Shaw with 4 Nos of Manhole Raising, in Ward No. 12, Under Bhatpara Munici
Repair of Manhole at 1/1,10-11,16/A(opposite),Daw Temple Road (Beside) Durga Mandir 11, Daw Temple Road (By lane) Drain covered by slab 19 (by Lane),Daw Temple Road and 1 no. D. T. Road old Lal Baba Collage (back side) under Booth no.-65,
Emergency repairing of 1 no. damaged RCC O.H. water tank of Block-22 in KIT Housing Scheme No. BRS-X, replacement of damaged manhole covers in KIT Scheme NI. LIGH-I, repairing and strengthening of damaged ceiling, lintel, beam etc. of Bl-3, F-32, BL-
Yearly maintenance for cleaning and removing the unserviceable materials and blockage of drainage and sewerage line of 1800mm dia pipe line over Service Road from City Centre II to Sriram Nagar and I.O.C. to Charnok Hospital under NKDA FY 2023-24
Thorough repair painting change of wall and floor tiles all sanitary fixtures doors and windows including plumbing and sewerage lines of all toilet block of Block C Ground floor to 4th floor of University of Calcutta Alipore Campus Sahid Khudiram Si
Emergent removal of sludge, weeds scum, liquid earth, mud etc. from sewerage lines, replacement of damaged waste lines of X and Y barrack and allied works at Police Training School, 247, A.J.C Bose Road, Kolkata - 700027 during the year 2023-2024.
Cleaning of underground reservoir, GI Tanks and PVC Tanks by machineries and cleaning of sewerage line for the period of 12 months under the jurisdiction of Section-II of Medical College Hospital Sub-Division, Kolkata during the year 2025-26.
Thorough repair painting change of wall and floor tiles all sanitary fixtures doors and windows including plumbing and sewerage lines of all toilet block of Block D Ground floor to 4th floor of University of Calcutta Alipore Campus Sahid Khudiram Si
Emergent work for cleaning of underground Sewerage line including cleaning and removing scum from Inspection pit etc under the jurisdiction of Section-II of Kolkata Medical College and Hospital Sub-Division during the Year 2023-24.( S and P Works).
Emergent work for cleaning of underground Sewerage line including cleaning and removing scum from Inspection pit etc under the jurisdiction of Section-II of Kolkata Medical College and Hospital Sub-Division during the Year 2024-25.( S and P Works).
Estimate for periodical cleaning of sewerage lines and inspection pits gully pits with repairing of damaged pits including supplying and installation of pit covers along with other civil works of ID and BG Hospital during the year of 24-25
Formation of New entrance cum patients waiting shed with related Shifting of Fire hydrant pipe line and underground Sewerage pipe line for Gynae OPD at the back side of Eye building to avoid accident within the compound of CNMC H
Temporary illumination with LED Chain light and LED strip lighting arrangement at GD Island, BigBazar Island, FE Island,9 no tank island ,4 No Sewerage Island,Mishra Island and ,Kathgola Island for International Kolkata Book Fair 2025 w-29, BMC
Cleaning of underground reservoir, GI Tanks and PVC Tanks by machineries and cleaning of sewerage line for the period of 12 months under the jurisdiction of Section-II of Medical College Hospital Sub-Division, Kolkata during the year 2023-24.
IPGMER-SSKMH-Rearrangement of sewerage line of CIB Bldg and Plinth Protection work, renovation of Toilet Block, Overhead shed in courtyard in connection to shifting of Dermatology dept from Main Block basement to CIB Bldg 1st and 2nd floor north side
Annual Civil maintenance including sanitary and plumbing works of WBLRTT building at Plot No.3 and 3/1 of Block-EE, Sector-II, Salt Lake, Kol-91 under Salt Lake Sewerage Sub-Division of Salt Lake Construction Division upto March 2024
Thorough repair painting change of wall and floor tiles all sanitary fixtures doors and windows including plumbing and sewerage lines of all toilet block of Block B Ground floor to 7th floor of University of Calcutta Alipore Campus Sahid Khudiram Si
O and M contract including provision of suitably experienced manpower and maintenance of Power transformers AIS related to 33KV system AIS DG sets ATS APFC Transformers related to 11KV system LT DG ATS cubicle panel APFC panels sewerage sump pumps
Distribution Wiring for Chamber of A.E Roads, A.E Water Supply, A.E PandD, E.E Drainage and Sewerage, Store of Engineering Department along with Sittings Arrangements for the Staff of Roads Department at the 3rd Floor of Annexe Building of HO HMC
Cleaning of underground reservoir, GI Tanks and PVC Tanks by machineries and cleaning of sewerage line for the period of 12 months under the jurisdiction of Section-II of Medical College Hospital Sub-Division, Kolkata during the year 2022-23.
Patch repairing works at (i) Baisakhi island (5 no. Tank 1 st Avenue), (ii) CPWD quarter near Water Tank 5 (Backside of CPWD quarter) due to Water line leakage (TALA PALTA) and Sewerage line leakage within Ward No - 30 under BMC.
Chittaranjan Seva Sadan College of Obs. Gynae. and Child Health-Pre-Monsoon works-Cleaning of underground sewerage line and surface drainage line and some ancillary works within the premises of CSS including (Sishu Sadan and Matri Maa ) during 24-25.
Construction of approach Road for disposal of sludge generated in Sewage Treatment Plants of Bhatpara Municipal Area in the new dumping ground located at Mouza -Madrail near 10 MLD, WSP STP of the Bhatpara Sewerage Project work and BMYA playground
Thorough repair painting change of tiles all sanitary fixtures doors and windows including plumbing and sewerage lines of all toilet block of Block A Ground floor to 9th floor of University of Calcutta Alipore Campus Sahid Khudiram Siksha Prangan 1
Urgent repair and replacement of damaged underground Sewerage Pipe lines including connecting Inspection Pits and Yard gully near A Gate to B Gate and in front of F Gate at Main Building High Court Calcutta during the year 2026 27
RESTORATION OF 2 NOS. SEWER TRENCH BY PROVIDING CC PAVEMENT FROM PREMISES NO. 39/2 TO 39/4, ANANDAPALLY WEST AND FROM 39/4 TO 1/5/5, ANANDAPALLY WEST IN WARD 114, BR. XI.
MAINT. OF CEMENT CONCRETE PAVEMENT DUE TO LAYING OF UNDER GROUND SEWER AT ROY BAHADUR ROAD BYE LANE NEAR PR. NO.-20/11, K.P. LANE BYE LANE NEAR PR. NO.-25 IN WARD NO.-117.
DEV. OF DRAINAGE SYSTEM BY LAYING OF U/G SEWER AT BYE LANE OF A. G. ROAD AND K. G. SARANI (SLUM AREA) NEAR PR. NO.-53/3/3 AND 11/5 IN W-118.
Contractual operation and routine maintenance of 12 Nos. Jetting cum suction machines for a period of two years of sewer cleansing wing under S and D Department (North div 2 machines, Central div 10 machines)
DEVELOPMENT OF MODEL BUSTEE BY LAYING OF UNDER GROUND SEWER INCLUDING CONSTRUCTION OF CATCH PITS AT ARABINDA PALLY (BHANGA MOHALLA) BUSTEE AT 70, MANICKTALA MAIN ROAD IN WD. -32, BR.-III PROJECT-(2) SL.NO.09
RESTORATION OF U.G. SEWER AT DIFF. BYE LANE OF BORAL MAIN ROAD AND ATABAGAN DUE TO DAMAGE DURING LAYING OF WATER MAIN (AMRUT SCHEME) BY K M D A IN WARD NO.- 111, BOROUGH-XI.
DEV. OF DRAINAGE SYSTEM AND ROAD BY LAYING OF U/G SEWER AND WITH C. C. PAVEMENT WORKS AT BYE LANE OF HOGOLBARI PATHWAY ROAD NEAR PR. NO.-15, 15/9, ETC. IN W-118.
MAINTENANCE OF ROAD BY LAYING HOT-MIX BY DISTURBANCE OF U.G SEWER AT USTAD AMIR KHAN SARANI BYE LANE NEAR PR. NO.- 1233/1/B, 515, 998/A ETC IN WARD NO.-122, BR.-XIII
Contractual operation and routine maintenance of 20 nos. medium size Gully-pit emptier machine for a period of five years under north, central and south division of sewer cleansing wing under S and D department
Contractual operation and routine maintenance of 20 nos. medium size Jetting cum suction machine for a period of five years under north, central and south division of sewer cleansing wing under S and D department.
MAINTENANCE OF BUSTEE U/G SEWER AT RAMKRISHNA PALLY AND BYE LANE OF R. K. SARANI (SLUM AREAS) NEAR PR. NO. 57, B. C. ROAD AND 41, R. K. SARANI ETC. IN WARD NO. 130.
MAINTENANCE OF U/G SEWER AT DIFFERENT PLACES OF ARABINDA SARANI, SODEPUR ROAD, USTAD AMIR KHAN SARANI BYE LANE NEAR PR. NO- 97, 242, 20/8 ETC.AT SLUM AREA IN WARD NO-122,BR.-XIII.
CONSTRUCTION OF U/G SEWER AT MAYADASI ROAD BYE LANE NEAR PR.-30/2, 36 ETC. AND CATCH PITH CONNECTION AT NEAR PARNASREE POLICE STATION, NEAR 1 NO S.M. ROAD ETC. IN WARD NO-132.
MAINTENANCE OF BUSTEE U/G SEWER INCLUDING REPLACEMENT OF PIT-COVERS ETC. IN DIFFERENT SLUM AREA AT THE BYE LANES OF B. S. ROAD, N. S. ROAD and BASAK BAGAN ETC. IN WARD NO. 130.
Contractual operation and routine maintenance of 16 nos. medium size Jetting cum suction machine for a period of five years under north, central and south division of sewer cleansing wing under S and D department.
Contractual operation and routine maintenance of 27 nos. standard size Jetting cum suction machine for a period of five years under north, central and south division of sewer cleansing wing under S and D department.
Development of Concrete Road, Drain and Cover Slab with Manhole Cover in House of Abhijit Bhowmick House to House of K.K Das Ghatak Bari to L.P No 81/6/4 and L.P No 81/6/3 to to 81/6/4 near 1no Rail Gate in Ward no - 07.
RESTORATION OF 3 NOS. SEWER TRENCH BY PROVIDING CC PAVEMENT FROM 27/7/1 TO 27/10 AND 26/4/1 ANANDAPALLY WEST AND FROM 7 TO 7/2, ANANDAPALLY WEST IN WARD 114, BR. XI.
CONSTRUCTION OF SEWER SYSTEM AT CHATKAL BUSTEE NEAR HOUSE NO. Z-3/144/1, Z-3/28/J/1, Z-3/128/B, ETC AT DR. A.K. ROAD IN WARD NO-141 UNDER KMC, BR-XV.
DEV. OF DRAINAGE SYSTEM PROVIDING U/G SEWER AT TARAMONI GHAT ROAD AND 2 NO.SUBHAS PARK SLUM AREA NEAR PR. NO.-368 AND 166/N AND 19 AND H/O ARATI DUTTA IN WARD NO.- 115.