Loading…
Loading…
6,988 results • Best match
Repairing and maintenance of manhole ,manhole cover and chambers of sewerage line in BCW under EWZ Area
Laying of Sewer Line near Jute Mill Quarter bath room to main road in ward no10
Relaying of sewer line at D.B. Giri Road near Land reform office, Ward No. 11, Darjeeling
REAPAIRING OF CONCRETE ROAD AND SEWER LINE NEAR H/O. BAPI HELA IN WARD NO.23
Cleaning of manhole/ sewer using Cesspool machine at IIT Kharagpur
Laying of proposed sewer line for Tarulia RR plot and connection with existing network of NTK Project
Extension of sewerage network by providing 200mm, 500mm and 600mm dia sewer line at Street no 718 at AA-IIG under NTK Project (Part-B) under Newtown Kolkata Water Supply Division-II, P.H.E. Dte.
Additional work for laying of Sewer line along revised route due to land problem of street no. 937 at AA-IIIG under NTK project. (Laying of Sewer line with 200mm dia NP3 pipe to connect sewer with St. No. 937 via St. No. 882 and 880 at AA-IIIG
Restoration of sewer line construction of septic tank at Pamphawati Gurungni Road Bhanu Gram wd no 28 Darjeeling
Development of Concrete road with Sewer Line front of K.Kali Das house in ward no-02under Titagarh Municipality
RE-LAYING OF SEWER LINE NEAR H/O LALTA PANDA BESIDE GOOD SHED ROAD IN WARD NO 20
Emergency laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along St. No. 714 (500mm dia.) at AA-IIG under NTK project.
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land road depression during heavily rainfall during 4th week of October 2024 along Street No. 852 near Sukhobristhi at AA
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along St. No. 844 at AA-IIIC under NTK project.
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along the arterial road 48 mtr. wide, Beside Sukhobristi
Repairing and maintenance of manhole manhole cover and chamber of sewerage line in BCW colony at BCW under EWZ Area.
Half yearly maintenance for removing of silt and sludge from the sewerage Pumping station near Gate No-5 including related sewer lines with manhole and gully pits at Howrah Bus Stand area, Howrah.
Urgent restoration of sewer network by relaying of 250mm dia. RCC NP-3 pipe at St. No. 693 in AA-IIC under NTK Project.
REPAIRING OF SEWER LINE STARTING FROM H/O - GANESH DHAR AND ENDING AT PROUDCTION CENTRE IN WARD NO 17
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along Artirial Road (N-S) in front of Newtown Height hou
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along arterial road (N-S) in front of Sapurji main gate a
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along St. No. 814 (Rose dell to Bagjola) at AA-IIIB under
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along Street No. 714 (800 mm dia.) infront of ISLS-IIG at
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along Street No. 780 infront of OHR No. 20 and ISLS-IIIB
Maintenance of surface drainage sewer line and provision of septic tank and soak pit for SOs toilet at SHQ BSF Krishnanagar
Renovation AND uplifting of manhole covers of existing sewer pit under CMC
Underground drainage work from Benir Pool to Purti R.H.S towards Taratala under ward no. 17
Underground drainage work from Benir Pool to Purti L.H.S towards Taratala under ward no. 17
Reconstruction of drain for sewer line beside the ground of Halderpara Sasthitala Sarbojanin Jagadhatri Puja Committee in ward no 15
Post Monsoon Cleaning of Underground sewer line and surface drain at Vivekanenda Yuba Bharati Krirangan during the year 2023-24.
Laying of sewer line at Rafi Ahmed Kidwai Road in Ward No.1 under Titagarh Municipality under AMRUT Incentive Fund
Pre Monsoon cleaning of Underground sewer line and surface drain at Vivekananda Yuba Bharati Krirangan during the year 2023-2024.
Laying of Sewer line along revised route due to land problem of street no. 937 AA-IIIG under NTK project.
Pre Monsoon cleaning of Underground sewer line and surface drain at Vivekananda Yuba Bharati Krirangan during the year 2024-2025
Pre Monsoon Cleaning of Underground sewer line and surface drain at Vivekananda Yuba Bharati Krirangan during the year 2025-26.
Post Monsoon Cleaning of Underground sewer line and surface drain at Vivekananda Yuba Bharati Krirangan during the year 2024-25.
Repair and Maintenance of existing septic tank and sewer lines with cleaning in AOR Bops of 140 bn BSF (Bn HQRaninagar) under SHQ BSF Gopalpur.
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along the St. No. 640 and 681 at AA-IIC under NTK project
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression/soil stabilization due to heavily rainfall in 3rd week of August 2024 along St. No. 781 (for 600mm dia) at A
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along right side of St. No. 714 (for 600mm dia) at AA-IIG
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along left side of St. No. 714 (for 600mm dia) at AA-IIG
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along the St. No. 648 and 675 at AA-IIC under NTK project
Emergency repair and laying of sewer line along new alignment to make good the failure in the existing sewer line due to land/road depression during heavily rainfall 3rd week of September 2021 along the St. No. 754 in front of SLS-IIIA and OHR No. 19
AR & MO GPRA at Dover Lane Extn. Kolkata During 2022-23. SH:- Day to day maintenance work i/c plaster repairing, wood work, painting, sanitary, water supply & cleaning of Over head tank, roof tank, sewer line, manhole, Gully pit etc.
Topographical Survey, preparation of layout plan with Invert Level (IL), Diameter, GeoCoordinate of existing sewer line including details of Gullypits, Catchpits, Manholes positions of Under-Ground Existing Sewer Network under the different ....
Repairing and maintenance of manhole, manhole cover and chamber of sewerage line in DS type quarters BCW colony at BCW under EWZ Area
Upgradation work at Santoshpur Industrial Estate MIRGC, South 24 Pgs.-Repairing for Bitumen Road with Footpath and Sewer Line.
Annual maintenance for cleaning the blockage of trunk sewer line at AA-IIIE under NTK Project for the year 2025-26.
Repair and maintainenance of sewer line behind Type I Qtr of 32 BN BSF at seemanagar campus under SHQ BSF Krishnanagar
Restoration of sewer line at Street No. 792, Plot No. 739, Premises No. 03-0792 in AA-IIIB under NTK Project.