Loading…
Loading…
330 results • Best match
Bore holes drilling and Soil investigation for proposed Construction of New Aqueduct at km 2.050 and Modernization of LBC from km 6.650 to km 10.252 of VRS Project near Laxmipuram (V) in Salur (M) of Vizianagaram District
Conducting Pre-survey and detailed soil investigation for the work of Providing 4 lane byepass road in place of existing road between Km.24/4 to 26/8 of Ongole-Nandyal Road in Prakasam District (2nd Call)
Supply and Installation of Laboratory Apparatus (Computers & GPS) in Geotechnical Laboratory for the Department of Civil Engineering
Supply and Installation of Geotechnical Engineering Lab Equipment for University College of Engineering Narasaraopet (UCEN) JNTUK KAKINADA
Supply and Installation of Laboratory Apparatus Computers GPS in Geotechnical Laboratory for the Department of Civil Engineering
Providing Consultancy Services for Detailed Design and Drawings for Construction of High Level Bridge across Bandar canal at Pitchaiah Street, Vijayawada, which include Topographic Survey, Hydrological Investigations, Geo-Technical Investigations, Preparation of General Arrangement Drawing and structural designs
Investigation, Detailed survey with Total station, Marking of approved alignment, soil investigation, Preparation of Land plan schedules, structural estimations, design and submission of BOQ for "Construction of HLB across Bandar Canal in Poranki Village limits in Krishna District
Soil investigation, Finalization of designs and drawings, Preparation of DPR and Consulting Services including conducting inspections during the Execution of work Construction of High Level Bridge across Gostani river at Pandrangi village of Padmanabham mandal in Visakhaapatnam district.
Soil investigation, Finalization of designs and drawings, Preparation of DPR and Consulting Services including conducting inspections during the Execution of work Construction of High Level Bridge across Gostani river at Pandrangi village of Padmanabham mandal in Visakhaapatnam district.
Pre survey estimate for Survey and preparation of DPR and soil investigation by taking bores and test results for work Construction of HLB across River Mandavya at Km 28/8-10 of Rayachoty Gadikota Road in Annamayya District
Conducting Survey, Soil Investigation, Designs & Drawings and Complete DPR for Reconstruction of HLB across Krishna Western Main canal Km 2.816 (Bucking Ham Canal) i,e., Km 8.800 of Revendrapadu - Seethanagaram road near Bharatamata Statue, Tadepalli in Guntur District.
Soil investigation for arriving SBS and other details for the sites of Multipurpose hall, Motel and food plaza on south side, Hospital purpose, Vedhanthapuram commercial complex, Vedhanthapuram residential towers and Auto nagar commercial complex at Tirupati (2nd call)
Estimate for Bore holes drilling and Soil investigation for proposed Construction of Aqueduct at km 2.050 and Modernization of LBC from km 6.650 to km 10.252 of VRS Project near Laxmipuram (V) in Salur (M) of Vizianagaram District
Investigation, Detailed survey with Total station, Marking of approved alignment, soil investigation, Preparation of Land plan schedules, structural estimations, design and submission of BOQ for "Construction of HLB across Bandar Canal in Poranki Village limits in Krishna District
Providing consultancy services for conducting soil testing planning analysis designs proof checking drawings and complete DPR for the work of Construction of ITI Building at Yerraguntla in YSR District
Conducting Survey, Soil Investigation, Designs & Drawings and Complete DPR for Construction of HLB across Krishna Western Main canal Km - 3.500 (Bucking Ham Canal) i,e., Km 7.600 of Revendrapadu - Seethanagaram road near Andhra Ratna Pumping Scheme, Tadepalli in Guntur District
Conducting Survey Soil Investigation Designs & Drawings and Complete DPR for Construction of ROB in lieu of L.C.No.2 E ar Railway Km. 1/3-4 on Dharmavaram -Pakala Section of Damajipalli -Tadipatri road at Km.17/2 in Anantapuramu District.
Conducting Survey, Soil Investigation, Designs & Drawings and Complete DPR for Construction of HLB across Krishna Western Main canal Km - 3.500 (Bucking Ham Canal) i,e., Km 7.600 of Revendrapadu - Seethanagaram road near Andhra Ratna Pumping Scheme, Tadepalli in Guntur District
Jungle clearance (Q3), Topographical survey (Q3), Soil investigation (Q3)
ETS Survey, Geotechnical Investigation, Design, approval of detailed engineering GFC(Good for Construction) drawings and Construction of Roads BT & PQC, Strom water Drains, Culverts, Water supply, Sewerage & STP, Utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation in Layouts for Land Pooling schemes of Nelapadu, Shakamuru, Kondamarajupalem & Rayapudi (Part's) in Zone-3 of Amaravati Capital City, Andhra Pradesh in Compatible with Trunk Infrastructure being executed/completed on EPC Basis along with LMC (Last Mile Connectivity) in respect of Water,Sewarage & Strom water Connectivity including Performance based O& M for 7 years (inclusive of 2 year DLP)
Repairs to Roofing to 400MTs and 600MTs Godown, Repairs to Weighting shed, Repairs and Maintenance to Office Building, Soil testing lab, at Market Yard Palasa under AMC, Palasa in Srikakulam District.
Providing consultacy services for conducting soil testing planning analysis designs proof checking drawings and complete DPR for the work of Construction of ITI building at Yerraguntla in YSR district 2nd call
Repairs to Roofing to 400MTs and 600MTs Godown, Repairs to Weighting shed, Repairs and Maintenance to Office Building, Soil testing lab, at Market Yard Palasa under AMC, Palasa in Srikakulam District.
Providing consultacy services for conducting soil testing planning analysis designs proof checking drawings and complete DPR for the work of Construction of ITI building at Yerraguntla in YSR district 2nd call
Main Work: Construction of Ten residential quarters for Judicial Officers in the premises of Principal District Court at Srikakulam in Srikakulam District. Sub-Work: Preparation of layout plan, Building plans, Soil exploration and Estimate for Construction of Ten residential quarters for Judicial Officers in the premises of Principal District Court at Srikakulam in Srikakulam District.
Soil investigation, Finalisation of Designs and drawing Preparation of DPR and consulting services including conducting inspections during the execution of work Construction of Bridge on the road from Paderu Araku R and B road to Paraseela of Dumbriguda mandal in Visakhapatnam dt
Job work for Topographical survey , Jungle clearness and Soil investigation
Supply and Installation of Laboratory Apparatus Instruments in Geotechnical Engineering Laboratory and Surveying Laboratory for the Department of Civil Engg
Conducting detailed investigation, topographical survey and soil exploration for developing distributory network system for 2,71,000 acres of ayacut under Polavaram Irrigation Project Left Main Canal in East Godavari and Visakhapatnam districts including preparation of Block command area maps, ayacut registers,fixing of canal alignment, Detailed Project Report(DPR), Alternative proposals like piped irrigation network, Drip irrigation system etc.
Main Work: Construction of Ten residential quarters for Judicial Officers in the premises of Principal District Court at Srikakulam in Srikakulam District. Sub-Work: Preparation of layout plan, Building plans, Soil exploration and Estimate for Construction of Ten residential quarters for Judicial Officers in the premises of Principal District Court at Srikakulam in Srikakulam District(2nd Call)
Conducting detailed investigation, topographical survey and soil exploration for developing distributory network system for 2,71,000 acres of ayacut under Polavaram Irrigation Project Left Main Canal in East Godavari and Visakhapatnam districts including preparation of Block command area maps, ayacut registers,fixing of canal alignment, Detailed Project Report(DPR), Alternative proposals like piped irrigation network, Drip irrigation system etc.
Sheet Roofing to Godown Nos.3,7&8 and Maintenance of structures (Repairs to soil testing Laboratory, Repairs to Cattle Market Ramp, Water tubs and pipe line) in Market Yard, Machilipatnam of A.M.C, Machilipatnam
Widening and Strengthening of Gannavaram to Puttagunta Road from Km 0/0 to 20/690 in Krishna District. Sub Work.Maintenance of R&B Soil Testing Cell, Vijayawada for the period from 01.04.2023 to 31.03.2024
ETS Survey, Geo Technical Investigation, Design, Detailed Engineering, GFC (Good For Construction), Drawings, Manufacturing, Supply, Lowering, Laying & Jointing of Trunk mains of water supply to PMAY-NTR colonies (HFA) on EPC basis (Including Defect Liability Period of 2 years) at Bhimavaram, Tadepalligudem and Palakollu ULBs of West Godavari District.
N.W:Construction of Double Lane Bridge at Km.1.200 on Ryves Canal near Tummalapalli Kalakshetram in Vijayawada, Sub-work: Conducting Surveying & levelling operations and soil investigation for site including preparation of Design & Drawing for Construction of Double Lane Bridge at Km.1.200 on Ryves Canal near Tummalapalli Kalakshetram in Vijayawada
Main Work. Construction of Double Lane Bridge at Km.3.700 on Eluru Canal near Satyanarayanapuram in Vijayawada, Sub-work: Conducting Surveying & levelling operations and soil investigation for site including preparation of Design & Drawing for Construction of Double Lane Bridge at Km.3.700 on Eluru Canal near Satyanarayanapuram in Vijayawada
Widening and Strengthening of Madhira Kanchikacherla road from Km 21 300 to 37 000 in Krishna District Sub Work Maintenance of RandB Soil Testing Cell Vijayawada for the period from 01 05 2021 to 31 03 2022
Site Investigation , Soil investigation, Finalization of designs and drawings, Preparation of DPR and Consulting Services including conducting inspections during the Execution of works for the bridge Construction of Bridge at 11/550 Km on the road from R&B road at Gullelu to Kandrangu (Kondru) of Pedabylu mandal (LWW-41M)
Main Work. Construction of Double lane Bridge at Km. 1.200 on Eluru Canal near Tummalapalli Kalakshetram in Vijayawada. Sub Work. Conducting Survey & Levelling operation and soil investigation for site including preparation of Design & Drawing for construction of Double Lane bridge at km. 1.200 on Eluru canal near Tummalapalli kalakshetram in Vijayawada.
Conducting detailed investigation, Topographical survey & soil exploration for developing distributory network system for ayacut under Polavaram irrigation project Right Main Canal from Km. 0.000 to Km. 174.000 in West Godavari & Krishna districts including preparation of Block command area maps, ayacut registers, fixing of canal alignment, Detailed project report (DPR), preparation of project reports for alternative proposals like piped irrigation network, Drip irrigation system etc
Conducting Soil Investigation, Topographical Survey etc. at the proposed sites of 1. Kendriya Vidyalaya at Nandigama, Krishna District. 2. Kendriya Vidyalaya at Macherla Guntur Dist. 3. Kendriya Vidyalaya at Rompicherla Guntur Dist. 4. Kendriya Vidyalaya at Irlapadu Village, Nadendla Mandal, Guntur Dist. 5. Kendriya Vidyalaya at Kandukur Prakasam District (AP). Subwork/Packages: package
Widening and Strengthening of Madhira Kanchikacherla road from Km.21/3 to 37/9 in Krishna District Sub Work :- Cost and supply of certain spares to the Universal Testing Machine ( UTM) in the laboratory of Soil Testing Cell, Vijayawada
Widening and Strengthening of Uppuluru Madduru Road from KM 0.0 to 4.200 and 4.650 to 10.825 in Krishna District Sub Work Maintenance of R and B Soil testing cell Vijayawada for the period from 01.04.2024 to 31.03.2025 (2nd call)
Request for Proposal (RFP) for Empanelment of Surveying Agencies for Conducting DGPS/DRONE Survey and Geotechnical Investigations for the works of APIIC/APICDC in Andhra Pradesh
Preparation of DPRs including Soil investigation, GEO Tech., Investigation, Presurvey, Preparation of drawings and detailed estimates for the works 1) Construction of Causeway on Vedavathi river of Kanekal Mandal 2) Providing BT surface to the road from Kannepalli to Bhupasamudram (Construction of Bridge work across Vedavathi river) Est. Cost Rs.36.00 Lakhs
Preparation of DPRs including Soil investigation, GEO Tech., Investigation, Presurvey, Preparation of drawings and detailed estimates for the works 1) Construction of Causeway on Vedavathi river of Kanekal Mandal 2) Providing BT surface to the road from Kannepalli to Bhupasamudram (Construction of Bridge work across Vedavathi river) Est. Cost Rs.36.00 Lakhs
Providing Consultancy Services for Soil Investigation,Preparation of designs,Drawings with Proof Checking,Estimate for the Work of Construction of Academic Building with Auditorium in YVU College,Yogi Vemana University,Kadapa and Construction of Waiting Rooms and Rest Rooms Near Women's Hostel in YVU College,Yogivemana University,Kadapa in YSR District(2nd Call)
Name of work:- Vijayawada Division - Conducting feasibility study Investigation, Detailed Survey with Total Station/DGPS, marking of approved alignment, Soil Investigation, Design and submission of DPR for Construction of ROB in lieu of Replacement of existing KL Rao - 6B at Km 569/31-33 ROB between KI-BZA, BZA- VSKP & BZA-GDV sections.
Widening and Strengthening of Madhira - Kanchikacherla road from Km.21/3 to 37/9 in Krishna District Sub Work Cost and supply of certain spares to the Universal Testing Machine UTM in the laboratory of soil testing cell Vijayawada 2nd call
Name of Work Widening and Strengthening of Nagayalanka to Koduru Road from Km 0/0 to 15/240 in Krishna District Sub Work Urgent Procurement of Bitumen Equipment in R&B soil testing cell Lab sub division Vijayawada Krishna District