Loading…
Loading…
8,374 results • Best match
Soil Investigation work for Proposed Upgradation of Murarai RH to State General Hospital under Rampurhat Health District in the Dist. of Birbhum.
Soil Investigation for Job Provn of single JCOs living Accn 2 JCOs at 95 Inf Bde Sig Coy at Mil Stn Kasauli
Supply and installation high precision Equipment Instruments under RKVY Establishment of Soil Testing Laboratory
Procurement of water and soil testing kits, chemicals and other laboratory items under NSPAAD.
SOIL TESTING OF 2000MT RIDF GODOWN AT TAPAN IN THE DISTRICT OF DAKSHIN DINAJPUR.
Preparation of structure design and drawing, vetting/proof checking, detailed estimation and soil testing
Construction of Compound wall at Soil testing laboratory at Mandi yard Datia Distt. Datia
Consultancy services for Preparation of DPR - Survey,Geotechnical investigations, preparation of GAD, Estimate, DTP for Construction of Major Bridge across Koyana Back water from Village Aapati to Tapola Tal. Jawali and Mahabaleshwar Dist. Satara.
Consultancy service for feasibility study, Geotechnical survey and detail project report for construction of four lane elevated road along Bindal river from Haridwar Bypass road N.H. -72 Bindal Bridge to Mussoorie Road (Max Hospital)
Proposed consultancy service for 8 lane widening of KamarajarSalai Promenade block cost estimate Reach - II 701-1400m to conduct Topographical survey, Geotechnical, Preparation of drawing, Detailed design, BOQ preparation and consultancy service at Z
Housing Colony at Jarja, Nahan, Distt. Sirmour H.P. SH Soil Investigationm Rock testing, Slope stability analysis, Hydrological studies, Geotechnical Laboratory Test for proposed Hostels and Utility Block for Dr. Y.S.P. Govt. Medical College Nahan
Regarding construction of 02 Nos High Level Bridge Box Culvert at Makhan Majra Chandigarh Engagement of Consultancy Services like Topographical Survey Hydraulic Analysis and Collection of data from Irrigation Department if required Geotechnical Inves
Conducting geotechnical investigations along with preparation & submission of final report foundation of bridges (Major, Minor, RUB & LHS), station building and embankment in connection with Alubari Road-Thakurganj BG doubling project of N. F. Railway.
Investigation work
Analogue Consolidation Apparatus Single gang, Digital Consolidation Apparatus, Vibrating Wire Piezometers, Laboratory Electric Oven, core cutter, Sample Tray, vibrating wire, Rain Gauge System, Measuring Cylinder, Digital Unconfined Compression testing machine, Desiccator Vacuum, Spilt spoon sampler, Electronic weighing machine, Sampling tube unrelieved, digitizing direct shear set up, Hydrometer, Test sieves in brass frame, Shrinkage Limit Set, Spatula, permeability of soils, Sand Replacement, Porcelain Evaporating dish 100 ml capacity, Integral Type Compression Proving Ring, Integral Type Compression Proving Ring2, Analogue Triaxial Test Apparatus, Digital Triaxial Test Apparatus with DAQ and Analysis software, Consolidation Cell Assembly, Universal Penetrometer, Electronic balance Capacity, Rubber membrane
Consultancy services for preparation of detailed structural design Geo technical investigation and electrical resistivity tomography ERT test works for the construction of RCC boundary wall construction of 7 Nos RCC living cum fighting bunkers C/o 6 Nos RCC bullet proof observation post installation of additional access gate along with sentry post and guard room and installation of security accessories at BSF campus Panthachowk Srinagar JandK.
Preparation of DPR(i)Topographical Survey at 20m cross section interval covering minimum 30m corridor (ii)Soil investigation for pavement and structures(iii)Geometric design of road (iv)preparation of plan & profile drawings&(v) cost estimates for the work of Improvements to Meenajpet to Baswapur via Kokkonda from km 0/0 to 10/0 (working reach from km 7/5 to 9/0)in siddipet district
Widening & Strengthening to double lane of the road from Gundlapally (HKR) to Pothur via Kondapur & Ganneruvaram from Km 0/0 to 21/0 in Karimnagar District Sub Work:- Preparation of DPR (1) Topographical Survey at 20 m Cross Section Interval covering ... (2) Soil Investigation for ...
Main Work: Construction of Four Lane road from Siddipet to Ellanthakunta road from Km.22/0 to 32/0 in Rajanna Sircilla District. Sub Work: Preparation of DPR 1) Topographical Survey at 20 m Cross section interval covering minimum 30 m Coridor 2) Soil investigation...
Construction Residential Accommodation for Central University of Odisha at Sunabeda, Dist. Koraput, Odisha (Phase-I) SH: C/o VC Bungalow (01 Nos), Type-VI Qtrs. (04 Nos.), Type-V Qtrs. (04 Nos), Type-IV A Qtrs. (12 Nos.), Type-III Qtrs. (24 (Nos.), ... out soil investigation .
Custom Bid for Services - CONSULTANCY SERVICES FOR SOIL INVESTIGATION SURVEY STRUCTURAL DRGS AND DETAILED ESTIMATE FOR PROVN OF 01 X COOK HOUSE AND DINING HALL WITH ALLIED INFRA FOR 70 MEN AT KHALSAR FOR ASC COY UNDER GE 873 EWS Similar Category Hiring of Consultancy Services - Percentage based Project Management Consultancy (PMC) Service for NHAI Testing Service for On-Board/Commissioned Equipment/Instrument related to Plant
Implementation of augmentation and strengthening of water supply scheme within Shantipur Municipality under AMRUT 2.0 which includes Supplying and laying of DI-K9 Rising Main, Construction of OHRs with Geotechnical ...works complete in all respect.
Soil Test in connection with the construction of precast RCC Jetty at Kantamari Ferry Ghat RIDF-XXIX
Upgradation of bituminous road at Soil Test to STP in Ward No-35 under Rajpur-Sonarpur Municipality.
Construction of Integrated District office complexes and Residential Quarters Package No.X (Medchal, Ranga Reddy (Shamshabad) and Vikarabad Districts - Sub Work: Procuring new machinery for material testing laboratory and soil testing laboratory for Road Research station(R&B), O/o Engineer-In-Chief(R&B), NH & Buildings, Errummanzil, Hyderabad(2nd call).
Annual Maintenance to E.I work to Engineer -In -Chief office(R&B), National High ways ,Quality control building SE Headquarters circle & soil testing for the period from 01.04.2023 to 31.03.2024 in the Premises of O/o the Engineer- in-Chief(R&B) Errummanzil for the Year 2023 24 ( 12 Months).
Soil Exploration in connection of the work of proposed RCC Pile Jetty with Approach Road on the river Dansa at Bowthakurani Khati Ghat in GP Sandeshkhali Block-Sandeshkhali-II CED-III SDB
Soil Exploration in connection with the work Construction of R.C.C. Pile Jetty with Approach Road on the river Bidyadhari at Opposite Gazikhali Ghat in GP Hatgachi Block Sandeshkhali-I CED-III SDB
Conducting soil investigation, topographical survey and supplying design and working drawings for the proposed new 2-Pump Fire Station at Manteswar, Purba Bardhaman
Jal Jeevan MissionCWSS to Nattika Firka Nattika Grama Panchayath SWSM Reappropriation Construction of 5 LL OHSR at Nattika Sub Division Office Soil investigation
Soil investigation work _Construction of 150 CuM RCC OHR with FHTC works for Panna Water Supply Scheme under Midnapore Division, PHE Dte. PART_C
Construction of 350 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) including soil investigation including for Laxmipur Water Supply Scheme, Block - Kakdwip
Provn of hard standing and approach Road to certain SWT and storage sheds at FOD under AMWP 2019-20 (LIST-IV) Soil Investigation
Soil Investigation for proposed construction of Boys and Girls Hostel and playground for Aliah University at 33 Gorachand Road Park Circus Kolkata _700017
SH-Preparation of Hydraulic Survey data investigation i.e. bearing capacity test, Soil investigation, preparation of Architectural drawings, Structural designs and detailed estimates etc
Soil investigation for construction of R.C.C. Bridge at Thakuranichak Dhobaghat over Darkeswar river G.P. Thakuranichak within Block Khanakul I P.S. Khanakul Dist. Hooghly.
Soil Investigation work for construction of OHR (200 CUM CAPACITY) under Augmentation of Indpur Piped Water Supply Scheme, Block- Bankura- I, District- Bankura.
Soil Investigation for proposed construction of Boys and Girls Hostel and playground for Aliah University at 33, Gorachand Road, Park Circus, Kolkata - 700017.
Hiring of Consultancy Services - Percentage based - Technology Consultants; GIS Expert, Topographical survey and soil investigation; Yes; Hybrid(As specified in scope of work)
Proposed consultancy service for 8 lane widening of Kamarajar Salai Promenade block cost estimate Reach -I 0-700m to conduct Topographical survey Geotechnical Preparation of drawing Detailed design BOQ preparation consultancy service at Zone 09.
Proposed consultancy service for widening of Gandhi Mandapam Both side Slip road North Side West South Side East to conduct Topographical survey Geotechnical Preparation of drawing Detailed design BOQ preparation consultancy service at Zone 13
Consultancy services for Preparation of Detailed Project Report (Survey/Geotechnical investigations/preparation of GAD/ Estimate/ DTP) for Construction of Railway Over Bridge/ Railway Under Bridge with service Road Gangakhed Akoli Kodri Road SH-234 i
Hiring of Consultancy Services - Percentage based - Selection of Agency for Geotechnical Investigations for Construction and Development of Infrastructure Works at Bn HQRs Siddarthnagar UP Bn HQRs SitamarhiII Bihar Bn HQRs Araria Bihar Bn HQRs Thakur..
03/KMDA/CIVIL/EE(ECPD-I)/EnAM OF 2024-25.
The new building is proposed to construct three storied framed structure building . In this work Five bore holes are proposed
As per BoQ and Tender Document
As per Tender
As per NIT