Loading…
Loading…
8,349 results • Best match
SOIL TEST EQPTS
Creation of Sweet Water lake at Sippighat_ SW_ Conducting Geo technical Investigation
Soil investigation of Muttar Thodu in Thiruvananthapuram corporation
Canteen cum dormitory - soil investigation and structural design
Job order for Soil investigation As per BOQ
Hiring of Consultancy Services - Percentage based - Design consultancy and soil investigation; Design consultancy and soil investigation; Yes; Onsite
Hiring of Consultancy Services - Percentage based - Design consultancy and soil investigation; Design consultancy and soil investigation; No; Onsite
Hiring of Consultants - Milestone/Deliverable Based - SOIL INVESTIGATION; SOIL INVESTIGATION; Yes; Hybrid(As specified in scope of work)
soil investigation-Soil investigation Providing lift Irrigation for Agricultural university Padasekharam near Attukal in Kalady ward Thiruvananthapuram Corpotration
Hiring of Consultants - Milestone/Deliverable Based - SOIL INVESTIGATION; SOIL INVESTIGATION; Yes; Hybrid(As specified in scope of work)
Hiring of Consultancy Services - Percentage based - Soil investigation; soil investigation; No; Hybrid(As specified in scope of work)
Consultancy for Soil Investigation for Provn of Miscellaneous Work for Firing Point-II at PXE Chandipur (soil investigation)
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation; Soil Investigation; No; Hybrid(As specified in scope of work)
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation; Soil Investigation; No; Hybrid(As specified in scope of work)
Hiring of Consultants - Milestone/Deliverable Based - SOIL INVESTIGATION; SOIL INVESTIGATION; No; Hybrid(As specified in scope of work)
GENERAL Soil investigation Construction of a new building for Govt UPS Anuvelil Panmana Soil investigation General Civil Work
General-Soil investigation for construction of new Vocational Higher Secondary block for Govt VHSS Veeranakavu-Soil Investigation work
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation; Soil investigation; No; Hybrid(As specified in scope of work)
Hiring of Consultants - Milestone/Deliverable Based - Soil Investigation; Soil Investigation; No; Hybrid(As specified in scope of work)
Construction of Shopping Mall Cum Office Complex at Vikasnagar Shimla HP 171009 SH Soil Investigation Rock Testing Slope Stability Analysis Hydrological Studies Geotechnical Laboratory Tests thereof
soil investigation work
Soil investigation works
SOIL INVESTIGATION WORKS FOR INSTALLATION OF IND RESIDH DEMONSTRATION PLANT AT PANIPAT
GENERAL-Soil Investigation for Staff Quarters GTSH ,Kottathara in Attappady,Palakka District
Soil Investigation of vaccant plot at Bihta PO Building under Patna Division
Main work : Construction of Submersible bridge across Hundri river parallel to existing aqueduct of K.C.Canal from Anand Theatre to swimming Pool in Kurnool District. sub work: conducting survey,investigation,sub soil exploration and soil testing(2ND call)
Conducting Pre- Survey Sub soil exploration Soil testing investigation and Preparation of DPR for Construction of High Level Bridge HLB at Km 29/6-8 of Arakonam to Renigunta Road (CTMD 052) in Chittoor District(2nd Call)
Conducting Investigation Sub Soil Exploration soil testing for Construction of High level Bridge across Penna River joining at Km 6/6-8 of Khajipeta to CK Road Via Pushpagiri Temple to Chinnamachupalli - Pushpagiri Road in YSR District
Conducting Survey investigation, Sub soil Exploration soil testing preparation of Land Plan Schedules and complete DPR for Construction of Hgh Level Bridge (HLB) at km 18/4-8 of kalikiri - Sadum road (via) Palamanda in Chittoor District
Conducting sub soil exploration soil testing and investigation for construction of vented causeway at km 14/6-10 of Ramapuram to Yerraguntla Vempalli road (Via) Balapanuru, Ingaluru, Agaduru, Santhakovvuru, Urutur road in YSR District (Near Inagaluru Village)
Selection of Laboratories for Testing of Products/Material - Soil; Geotechnical Investigation for the work Provision of Security Infrastructure and Addn/Altn at Building No P-1, MTRDC Main Building, Bengaluru; Depth upto 6 m or refusal, whichever is ..
Geotechnical Investigation works for the work Construction of Perimeter road i c Slope Stabilization work (Western Side) from CH. 920 to 1970 mtr and Shifting of Perimeter Fencing at Pakyong Airport, Sikkim.
Geotechnical and Sub soil investigation for construction of 100 bedded Girls Hostel for College of Agriculture at Susunia in the district of Bankura.
Geotechnical Sub-Soil Investigation and Topographical Survey by Total Station machine for all wings of Public Works Department in the district of Jalpaiguri
SOIL INVESTIGATION
Soil Investigation work for General Bipin Rawat Defence Industrial Corridor Jhansi Node and Chitrakoot Node
Soil investigation for Special rpr replacement of Main Mat at Parade ground at INS Shivaji
Soil Investigation of Ashuni Khari over 14.50 Km length
Sub soil investigation (Boring), Soil tests, Traffic survey and Inventory survey etc
GENERAL Soil investigation for construction of new building for Govt ITI Kayamkulam Kayamkulam ITI soil investigation General Civil Work
GENERAL-Soil Investigation work - Construction of new building for GHSS Koyilandy-(Part TS)-Soil Investigation work- General Civil Work
GENERAL-Vallikunnam Ayurveda Hospital Soil Investigation-Soil investigation works for the construction of Govt. Ayurveda Hospital Vallikunnam-Investigation Work
Consultancy service for preparation of DPR with the scope of carrying out Survey, Geotechnical Investigation Forest/ Environment work related study/ documents for clearance, Working Drawings, Detailed Designing, Detailed Estimate with BOQ, Modificati
Consultancy Services for the preparation of General arrangement drawing and detail Geotechnical Investigation by taking trial bores for proposed construction of road over bridge R.O.B. on Hadditola Railway Crossing at Gondia city
Geotechnical Investigation Work from Common Central Secretariat Station (excl.) to Indraprastha (excl.) for Extension of Line-8 (R.K. Ashram Marg to Indraprastha)- Central Vista Corridor of Phase-V(A) of Delhi MRTS.
Carrying Out Survey, Geotechnical Investigation and Preparation of BOQ, Detailed designing, Working Drawings, Detailed Estimate (DPR) including required modifications during Construction of new Bridge on Nuh Drain by dismantling old condemned bridge
RECONNAISSANCE SURVEY DETAILED ENGINEERING SURVEY TOPOGRAPHICAL SURVEY and GEOTECHNICAL INVESTIGATION SOIL SURVEYS CADASTRAL SURVEY AND PROVIDING SERVICES FOR ESTABLISHING ROU IN ROW FOR PROPOSED ATF PIPELINE FROM JATNI MARKETING TERMINAL TO BHUBANES
Reconnaissance Survey, Detailed Engineering Survey, Soil Surveys, Geotechnical Investigation and Providing services for establishing ROU in ROW and opening of ROW for proposed pipeline from existing RCP-05 (PRRPL) to Meramandali CUF
Hiring of Consultants - Milestone/Deliverable Based - As Per Nit; Appointment of agency for carrying out Geotechnical investigation works and soil Analysis for Formulation Of; No; Hybrid(As specified in scope of work)
Appointment of consultant for Structural design, drawings, estimation and geotechnical investigation for work of proposed stilt bridge of 10 m width for alternate to Nhave road near NMSEZ, Ulwe Node, Navi Mumbai.