Loading…
Loading…
1,548 results • Best match
Consultancy services for hydrological investigation, topographical surveying, and geo-technical investigation of sites including submitting detailed architectural and structures like (Culvert and bridges) with detailed project report (DPR) and detailed estimate duly vetted from IIT/NIT or any other Govt. Engineering College along GIN 58, 59, 63, 64, 65, 66, 71, 72, 73, 74, 75, 76, 78, 79, 80, 81, 82, and 83 (Total Length 44.52 Km) at Murshidabad district, West Bengal. Subwork/Packages: Same as Name of work
Soil investigation in connection with the construction of R.C.C. bridge over storm water flow channel at Ch. 31.306 KM in P.S Haroa, Block Haroa, Dist. North 24 Parganas
Construction of 200 cum. capacity 20 mtr. staging height RCC Over Head Reservoir alongwith Soil Investigation work, Laying Distribution System .. Garanberia Piped Water Supply Scheme, Block-Bhangar-I
Construction of 250 cum. capacity 20 mtr. staging height RCC Over Head Reservoir alongwith Soil Investigation work, Laying Distribution System .. Mathurapur Piped Water Supply Scheme, Block-Bhangar-I
Augmentation of SAGRAI PWSSwithLDS FHTC Risingmain with necessary interconnections construction of 400cum capacity OHRwith 20.0 mtr Staging height inclusive of soil investigation under KHANDAGHOSH Block Dist Purba Burdwan
Engagement of Consultant For design, drawing, topographical survey including necessary soil investigation and Preparation of DPR for river bank protection work Under Kalimpong Irrigation Division, Gorkhaland Territorial Administration.
Soil Investigation work in connection with Construction of proposed RCC Bridge over Veragachi Khal at Majlishpukur Badartala under Mouza Dhapdhopi Block and PS Baruipur Dist South 24 Paraganas.
Aug of CHAMPAHATI PWSS with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR inclusive of soil investigation with construction of boundary wall under Kalna-II Block.
Soil Investigation work at various chainages of Pichaboni khal, Ramnagar khal and Sapua khal for proposed re-excavation works within Blocks- Ramnagar-I and II, Dist.- Purba Medinipur
Soil investigation work at various Chainages of OCC Khal, Champa Channel and Chhatri Channel for proposed re-excavation works within Block-Egra-I,Ramnagar-I, Dist-Purba Medinipur
Soil investigation due to change in land of Head Work site in connection with construction of RCC Over Head Reservoir (capacity 50 cum) for Jhaugerya water supply scheme
Augmentation of KAITY PWSS with LDS FHTC Risingmain Construction of 700cum capacity OHR with 20.0 mtr Staging height inclusive of soil investigation under RAINA II Block Dist PurbaBurdwan
Soil investigation inconnection with the construction of proposed pumping station at the outfall of Storm Weather flow Channel at Ghusighata in P.S. Haroa, Block Haroa, Dist-North 24Parganas.
Soil investigation in connection with construction of a bridge over 14(ABC) at Ch. 375.00 at village-Saota, G.P.-Negon,Block-Mongalkote ,Purba Bardhaman under Damodar Canal Division.
Construction of 300 cum. capacity 20 mtr. staging height RCC Over Head Reservoir alongwith Soil Investigation work, Laying Distribution System .. Chandpur Piped Water Supply Scheme, Block-Bhangar-I
Construction OF Repairing and Renovation for north side room of main building of Soil Testing Laboratory, Raiganj, Uttar Dinajpur
Soil Test for Proposed Constrution of New Three Storied Integrated English Medium School at Kahi Nagar Under Murarai I Block, Birbhum, W.B.
E-Quotations for Soil Test of Construction of Modern Guest House at Township River Side under ward no -29 within Haldia Municipality.
Geotechnical exploration at proposed Balason HEP 38 MW, Darjeeling District
Geotechnical Exploration at proposed Rishi SHP 04 MW, Kalimpong District
procurement of 1 no. of GEOTECHNICAL BEAM CENTRIFUGE SET UP
Construction of 400 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation and Providing FHTC IN MAYAPUR Water Supply Scheme under ARAMBAGH SUB DIVISION Block-Arambagh
IPGMER SSKM Hospital Soil investigation for the proposed construction of (G plus 2) storied Surgery OPD Building during the year 2023-24.(2 Nos 30.00 Mts Depth of boring)
Construction of Pump House Boundary wall Soil investigation Construction of 100 cum OHR and FHTC under JJM for Chaulisingpur PWSS in Ghatal block under Midnapore Division PHE Dte._PART_A
Augmentation of DEWANDIGHI PWSS with LDS FHTC Rising main with necessary interconnectionConstruction of 200cum capacityOHR with20.0 mtrStaging height inclusive of soil investigation under Burdwan-I Block Dist Purba-Burdwan
Soil Investigation for construction of proposed R.C.C Bridge over Gaighata Khal at Paschim khalna, G.P- Khalna Block-Amta-II ,P.S-Joypur, District-Howrah under LDC Sub-Division No-I.
Soil Investigation Work Near Childrenpark At Ptalnagar Of Cantonment Khal At Ward No 22 Of Dum Dum Municipality District Noth 24 Parganas Under Calcutta Canals Subdivision Of Canals Division.
Soil investigation work in connection with construction of additional building for Cosumer Affairs Department at Shed No14 in Khadya Bhawan Campus_11A_Mirza Galib Street_ Kolkata _700087 during the year 2023_24
Soil Investigation for construction of a Blue Alpine Bridge over River Karati under Mouza Hedia Moukhali Kumarkhali within Canning II under Canning I Sub-Division of Joynagar Irrigation Division
Soil Investigation for construction of Proposed New Bridge at Ch. 25.32 of 46L of Midnapur Branch Canal at Maitygola,Mouza GP-Panchkhuri ,Block PS -Midnapur Sadar, Dist-Paschim Medinipur.
Soil Investigation Work forconstruction of Proposed multistoried residential building for GrD employees of the Damodar Headworks Division within DVC new colony under DHWD in DurgapurMunicipal Corporation Dist Paschim Bardhaman
Laying of Distribution System including specials valves, pipe Supporting structure..Soil investigation for construction of one No. 450 Cum OHR.at Gadigachha in Nabadwip Block under Nadia Division,PHE Dte.
Soil investigation for reconsideration of another Pump House near the existing Kurebhanga Pump House over Jorha Khal at Mouza Jogendranagar, Block Canning-II, District South 24 Parganas. (2nd Call)
Providing FHTC including supplying, laying..Construction Soil investigation of 700 Cum Capacity RCC OHR.for UDAYPUR to accommodate FHTC in Santipur block of Nadia District under Nadia Division P.H.Engineering Dte.
Soil investigation report for proposed construction of new office building for B.L. and L.R.O. Habra-II at Ashoknagar in the District of North 24 Parganas under Barasat Division, PWD.
Sub-soil exploration report for construction of a new bridge in replacement of existing steel truss bridge at 4th km of Sukna - Adalpur Road in the District of Darjeeling under North Bengal Construction Division, P.W.D. During the year 2021-2022.
Soil testing for construction of a Bridge/ Culvert at char Bhabanipur within Block and PS- Balagarh,GP-Jirat , Dist- Hooghly.
Construction of Fish Feed, Water and Soil Testing Laboratory Building at Moyna Dev. Block in the District of Purba Medinipur.
Soil Test in connection with the construction of RCC Jetty with Approach Road and Protective work at Dhakir Mukh Ferry Ghat RIDF-XXIX
Soil test for dyke stability of ash pond 1 and ash pond 2 of STPS as per audit report recommended by IIT Kharagpur
Construction of 23 Nos. different capacity R.C.C OHR (based on Departmental Design Drawing) with 20 mtr. staging height including Geo-Technical investigation .. of Canning-I, Canning-II, Basanti Block
Augmentation of RAINA PWSS with LDS FHTC Rising main Construction of 300 cum capacity OHR with 20.0 mtr. Staging height of soil investigation under Raina-I Block Dist Purba-Burdwan
05 (Five) Nos. Soil Investigation for the construction of different Capacity Over Head Reservoir as mentioned in ANNEXURE-A under different Water Supply Scheme under Siliguri Sub Division, PHE Dte.
Augmentation ofBAHRAN BIRAHIMPUR PWSS with LDSFHTCRisingmain Construction of 250 cum capacityOHR with 20.0 mtrStaging heightinclusive of soil investigation with repairing of Pump house I II under KetugramII Block Dist PurbaBurdwan
Soil investigation work for the proposed Bridge at Ch. 181.00 of Bakreswar Irrigation Main Canal under Bolpur Irrigation Sub-Division of Mayurakshi South Canals Division within Block- Dubrajpur, Bolpur, Birbhum.
Soil Investigation work in connection with Construction of proposed RCC Bridge at Ch 15550 over Adiganga Channel in Shikharbali I GP under Block and PS Baruipu, Dist. South 24 Paraganas.
Soil investigation at OHR site and construction of 450 Cum OHR at zone 1 for Augmentation of Birpara PWSS at under Alipurduar Division of North Bengal Circle I PHE Dte
06 (Six) Nos. Soil Investigation for the construction of different Capacity Over Head Reservoir as mentioned in ANNEXURE-A under different Water Supply Scheme under Siliguri Sub Division, PHE Dte.
Soil Investigation work for the proposed reconstruction of distressed bridge at Ch.191.17 of 1BC under Block-Galsi-II,P.S.- Galsi,Dist-Purba Bardhaman of Damodar Canal Division.(2nd call)
Laying distribution pipe line Rising Main Boundary wall Soil investigation 350 CuM OHR and FHTC allied work for Augmentation of Dharma PWSS in Daspur_I block under Midnapore Division PHE Dte.