Loading…
Loading…
1,548 results • Best match
Allied works for Construction of Approach road, Guard Wall and Laying UPVC Pipeline Soil Investigation Study of Gourinagar Water Supply Scheme in Burwan Block of Kandi Sub Division under Murshidabad Division, P.H.E.Dte..
Providing FHTC including supplying..all com,plete...Construction of 100 cum capacity 20 Mtr. staging height RCC Over Head Reservoir...soil investigation..for FATEPUR to accommodate FHTC...under Nadia Division P.H.Engineering Dte
Soil investigation for proposed R.C.C. Sluice cum Bridge at Right Bank of Hooghly river over Chandipur Khal near Jelepara in G.P-Belari, Block Shyampur-I, Dist. Howrah. Under Lower Damodar Construction Division
Construction and Commissioning of 450 Cum Capacity OHR Soil Investigation Construction of Pump House Boundary wall and FHTC for Proposed Sasha Bedia PWSS Block_Garhbeta_II Dist_Paschim Medinipore under Midnapur Division PHE Dte. PART_I
Augmentation of SATGACHIA Zone I PWSS with LDS FHTC Rising main Construction of 500 cum capacity OHR with 20.0 mtr Staging height inclusive of soil investigation under MEMARI II Block District PurbaBurdwan.
Construction of Pump House Boundary wall Soil investigation Construction of 450 cum OHR and FHTC under JJM with allied work for Piasala PWSS in Garbeta_II block under Midnapore Division PHE Dte. PART_II
Cons. of 450 cum capacity 20mtr staging height RCC OHR as per Deparmental deign, drawing and specification inlcluding bored pile, soil Investigation at Kurulia (Zone-II) ws scheme, under Barasat Division, P.H.E.Dte
Providing FHTC including supplying..all com,plete...Construction of 100 cum capacity 20 Mtr. staging height RCC Over Head Reservoir...soil investigation..for Anjangarh to accommodate FHTC...under Nadia Division P.H.Engineering Dte
Laying of Rising Main, Providing FHTC, Construction of 150 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House repairing, Construction of Boundary Wall for Augmentation of DAULATPUR PWSS
Aug. of ANUKHAL PWSS with LDS, FHTC, Rising main, Construction of 250 cum capacity OHR inclusive of soil investigation with construction of boundary wall at Head works site under Kalna-II Block
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Rahimpur Rajballhat Tararmore Road from 0.00 kmp to 8.36 km Widening and Strengthening work
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Boinchee Haral Road from 0.00 kmp. to 5.60 km for Widening and Strengthening work
Soil investigation work for the proposed boosting pump house over Charial Khal at ch.9000.00 m under Thakurpukur Maheshtala Block,Dist.South 24 Parganas under Suburban Drainage Sub Division.No.II of Suburban Drainage Division
Soil Investigation for rejuvenation of cross regulator gate (Four vent) across Kanki River including protection work at the downstream right side of village -Karanda, GP-Nabasta, Block-Burdwan-II, Dist-Purba Bardhaman
Repairing of Bituminous Road From Malipara More To Soil Test Company From Mali Para More To Ration Shop In Ward No-34 Under Rajpur Sonarpur Municipality
Augmentation of PARHATI PWSS with LDSConstruction of 350cum capacity OHR with 20.0 mtr Staging height inclusive of soil test FHTC under BurdwanI Block Dist Purba-Burdwan
Supply, delivery, installation, Testing and Commissioning of Soil Testing Minilab. Make INFOSYSTEM DIGITAL SOIL ANALYSIS KIT. (Annexure-X for Brand and Technical Specifications)
Hiring of Consultants - Milestone/Deliverable Based - Structural Design, Soil Investigation and Estimate Abstrack & Yardstick including BoQ and Current Market Rate Analysis; DPR, RFP Preparation & Bid Process Management; No; Hybrid(As specified in sco..
Laying of Rising Main, Providing FHTC, Construction of 200 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House for implementation of Baragram Piped Water Supply Scheme at Banshihari Block
Augmentation of KETUGRAM ZONE-I PART-A B PWSS with LDS FHTC Construction of700cum 200 Cum capacity OHR with 20.0 mtr Staging height inclusive of soil investigation respectivelyunder Ketugram-I Block Dist PurbaBurdwan
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 150 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Repairing of Pump House etc. of Augmentation of Jalghar PWSS
Laying distribution pipe line, soil investigation, 150 Cum OHR ( with pile foundation ) Accommodate FHTC ( 392Nos) under JJM with allied work for Dakshin Shitala Its Adjoining Mouzas Water Supply Scheme within Ramnagar-II Block
Laying of Distribution System including specials, valves...Construction of 300Cum Capacity 20 Mtr. Staging Height RCC Over Head Reservoir...Soil Investigation...at Hanspukuria Zone-II to accommodate FHTC under Nadia Divn, PHE Dte.
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Ujalpukur Rampara Toralpur Road from 2.00 kmp. to 3.95 km for Widening and Strengthening work
Construction of 600 M3 Capacity OHR with Soil Investigation and FHTC of Gauria Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Soil investigation work for the proposed re-construction of Bridge at Ch. 390,00 over Dy-4 of Kopai South Main Canal under Kirnahar Irrigation Sub-Division of Mayurakshi South Canals Division, Bolpur, Birbhum.
Soil Investigation of 5(FIVE) Nos existing sluice points and 2(TWO) Nos proposed new sluice points out-falling in river Kuya -Babla under Salar (I) Sub-Division within Mayurakshi South Canals Division.
Hiring of Consultants - Milestone/Deliverable Based - Architectural Drawings, Structural Design, Soil Investigation, Topographical Survey and Estimate on SSR 2020, Market Rates, Abstract & Yardstick and Current Market Rate Analysis for Provn of OTM A..
Soil investigation for the proposed Construction of a new cart bridge at ch.565.00 of DaBC under DC No-III Sub-Division of Damodar Canal Division,Block-Bhatar,P.S.-Bhatar District-Purba Bardhaman.
Soil Investigation work for construction of Single Lane Bridge over Keorapukur khal at Jalasi under Diamond Harbour I Sub-division of Canals Division in Mouza-Kamarpukur, Block-Magrahat-II Dist-South 24 Parganas.
Construction of 750 M3 Capacity OHR with Soil Investigation and FHTC of Kharba Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Soil investigation work in 32 locations in connection with New or Re construction of sluices in different Blocks under Howrah and Hooghly District under WBMIFMP FM Package XI, comprising 4 Lots LOT 4
Soil Investigation work for the proposed 2 nos check Dam at Monoharpur Lat 23.6820N, Long 87.6209 E and Sangri Mahula Lat 23.7440N, Long 87.7361 E in Block Bolpur Sriniketan, PS.-Bolpur, dist. Birbhum.
Soil investigation of for proposed R.C.C Sluice over Left Bank of Rupnarayan River over Laharipara Khal near Anantapur in G.P- D.M Ghat-II, Block-Shyampur-II, Dist-Howrah under Lower Damodar Construction Division.
Soil investigation work in 32 locations in connection with New or Re construction of sluices in different Blocks under Howrah and Hooghly District under WBMIFMP FM Package XI, comprising 4 Lots LOT 3
Soil investigation on the right bank of river Ganga under Jangipur Irrigation Sub-Division No-II of Ganqa Anti Erosion Division No-I at Kamalpur and Loharpur within Block Samserganj, Murshidabad.(2nd Call)
Construction of 300 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection and soil investigation under HATGOBINDAPUR Piped W.S. Scheme within Burdwan- II Block under Burdwan Division, P.H.E Dte.
Construction of 500 M3 Capacity OHR with Soil Investigation and FHTC of Choupaldanga Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Construction of 250 cum. capacity 20 mtr. staging height RCC Over Head Reservoir alongwith Soil Investigation work, Laying Distribution System .. for Kashinathpur Piped Water Supply Scheme, Block-Bhangar-I, District-South 24-Parganas
ENGAGEMENT OF REPUTED CONSULTANCY / PROFESSIONAL FOR PREPARATION OF SOIL INVESTIGATION REPORT, TRAFFIC SURVEY REPORT AND PAVEMENT DESIGN REPORT AT GOPAL NAGAR KHELAR MATH TO GOPAL NAGAR BANSTALA IN WARD NO-142, BR-XVI.
Construction of 200 cum capacity R.C.C. Elevated Reservoir including Soil investigation, Construction of Boundary Wall and Land Improvement at Iswarchandrapur Water Supply Scheme under Nadia RWS Sub-Division under Nadia Division PHE Dte
Soil investigation total station survey Planning design detail engineering preparation of estimate working drawing BOQ DPR etc for Construction of G plus 10 Paribahan Bhaban within WBTC Kasba Depot compound Kolkata 700 107
Soil investigation for Construction of lock gate at Khargram Kaki gore Danga irrigation channel at khargram in Mouza - palsit bridge and lock gate from kana nadi irrigation channel near sanat Mukherjee and p
Sinking of Tube well Laying of Rising Main Pump House Boundary wall Soil investigation 100 CuM OHR and FHTC for Augmentation of Amrakuchi PWSS in Keshpur block under Midnapore Division PHE Dte._PART_C
Augmentation of SASINARA ZONE II PWSS with LDS FHTC Rising main Construction of 350 cum capacity OHR with 20.0 mtr Staging height inclusive of soil investigation under MEMARI I Block District Purba Burdwan.
Construction of 700 M3 Capacity OHR with Soil Investigation and FHTC of Kushida Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Augmentation of NATUNGRAM Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation and Rising Main under BARDHAMAN-I Block, District- Purba-Bardhaman.
KARAIL Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC with Staging height including soil investigation .............. at different TW site under Purbasthali-I Block, District- Purba-Bardhaman. NEW SCHEME.
Soil Investigation work for proposed Single Lane RCC Bridge of Carriageway 4 point 250 M at Mouza-Dadpur Ch 275 Over Suryapur Inner Channel under Block Mograhat II PS Mograha, Dist.South 24 Parganas.
Soil investigation work in 32 locations in connection with New or Re construction of sluices in different Blocks under Howrah and Hooghly District under WBMIFMP FM Package XI, comprising 4 Lots LOT 2