Loading…
Loading…
1,548 results • Best match
Laying of Distribution System...Providing FHTC including supplying..all complete...Construction of 200cum capacity 20Mtr. staging height RCC Over Head Reservoir...soil investigation..for Karimpur Jalangi Zone-IXB to accommodate FHTC..under Nadia Divn
Construction of Boundary wall Soil investigation Construction and Commissioning of RCC OHR of capacity 200 cum and Accommodate FHTC under JJM for Pachra PWSS in Midnapore Sadar block under Midnapore Division PHE Dte. PART_B
Construction of 200 CuM capacity O.H.R.with Soil Investigation,5.90 m X 4.10 m Pump, Chlorine room with sanitary arrangements,....FHTC and different works related to RANIBAZAR PIPED WS SCHEME within Birbhum Division, PHE Dte.
Construction of Boundary wall Soil investigation Construction and Commissioning of RCC OHR of capacity 100 cum and Accommodate FHTC under JJM for Khangardihi PWSS in Midnapore Sadar block under Midnapore Division PHE Dte. PART_B
Construction of 150 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with Laying D.I. Pipe Line including design drawing of foundation after soil investigation for Buraburirtat Water Supply Scheme, Block - Pathar Pratima
Providing FHTC including supplying..all com,plete...Construction of 250 cum capacity 20 Mtr. staging height RCC Over Head Reservoir...soil investigation..for Bagula Zone-I to accommodate FHTC...under Nadia Division P.H.Engineering Dte
Construction Pump,Chlorine room with sanitary arrangements, 250 CuM OHR, Boundary wall, Soil Investigation, Land development, Rising main, Laying distribution, road restoration and Providing FHTC..at HANSAN WS scheme under BIRBHUM Division, PHE Dte.
Soil Investigation work for the Extension of 5 nos of CD at Ch. 923.35, Ch 943.35, Ch 988.85, Ch. 1007.35, Ch 1054.00 of KSMC under Bolpur (I) Sub-Division under Mayurakshi south canals Division.
Sinking of Tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 500 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House etc. for implementation of Bartakkigram PWSS.
Laying dist. system and constn. of RCC OHR of 400 cum capacity along soil investigation of KAYRAPUR and its adj. mouzas W.S. Scheme _PART-A_ of Ausgram - I Block under Burdwan Division_ PHE. Dte.
Construction of 600 cum capacity 20 mtr. Staging height RCC Elevated Reservoir as per Departmental Design Drawing including Soil Investigation, Design of Pile foundation and all pipe connections for KHILA PWSS of Udaynarayanpur Block
Construction of 200 cum cap. 20 Mtr. staging height RCC Over Head Reservoir including ............... including soil investigation for PRATAPPUR-Zone-I and its adj.mouzas W.S. scheme under Durgapur Sub-Division_under Burdwan Division_ P.H.E. Dte.
Laying of Distribution System including specials,valves...all compl..Providing FHTC ..with all necessary ..Construction Of 500Cum Capacity..RCC OHR..Soil Investigation all complete..Ground Based WS Scheme at Payradanga under Nadia Divn,PHED
Soil investigation work of proposed construction of New District EVM _ VVPAT warehouse in front of Land Acquisition Office, in the compound of old collectorate building, Chinsurah, under Hooghly Division, P.W.D. during the year 2023_2024.
Soil investigation for the proposed Construction of a new cart bridge at ch.514.00 of DaBC under DC No-III Sub-Division of Damodar Canal Division,Block-Aushgram-I,P.S.-Aushgram, District-Purba Bardhaman
Soil investigation for construction of a new Sluice structure with bridge , Head Regulator Structure over Dev Khal at Vill -Teandul, G.P. Natu, Block - Raina - I under Seharabazar (I) Sub-Division under Damodar Canal Division
Construction of 350 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for JAGADISHPUR Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block
Soil Investigation for Construction of 01 (One) No of Overhead Reservoir, Construction of 350 Cum capacity .....providing Functional House Hold Tap Connection (FHTC)....Binodnagar water supply ...under Nadia Arsenic Civil Division - II P.H.E. Dte
Soil Investigation for Construction of 01 (One) No of Overhead Reservoir, Construction of 100 Cum capacity .....providing Functional House Hold Tap Connection (FHTC)....Jayrampur water supply ...under Nadia Arsenic Civil Division - II P.H.E. Dte
Preparation of Detailed Project Report along with Topographical Survey, Soil Investigation, Traffic Survey and Axle Load Survey etc related to the work Belpahari-Banspahari Road from 12.00 KMP to 23.80 Km, Widening and Strengthening
Preparation of Detailed Project Report along with Topographical Survey, Soil Investigation, Traffic Survey and Axle Load Survey etc related to the work Gopiballavpur-Nayagram Road (SH-9) 35.00 Kmp to 41.60 Km Strengthening work
Supplying Installation and Demonstration of different instruments equipment to the Quality Control Laboratory Soil Testing Laboratory under Quality Control Division II Siliguri 2nd call
Hiring of Consultancy Services - Percentage based - Technology Consultants, Soil Investigation for provn of deficient Married Accommodation for service and civilian personnel at Service Selection Board, Kolkata (New proposed site for 2 x Md accn for ..
Construction of 150 CUM capacity OHR,including Soil Investigation, 5.09mX4.1 m Pump House,Chlorine Room with Sanitary...Rising Main and Laying Distribution FHTC and const.Boundary Wall...Bheter PIPED WS SCHEME within Birbhum Divn, PHE Dte
Laying of Rising Main, Providing FHTC, Construction of 300 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Shyampur Piped Water Supply Scheme
Const. of 100 cu.m. RCC Reservoir..... laying distri. system, Soil Investigation, RM, Deep TW, PH, Boundary Wall, FHTC under JJM for Augmentation of Hansqua Tea Garden of Phansidewa block under Siliguri Sub Divn, PHE Dte.
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 350 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Panchhata PWSS
Sinking Of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 300 cum OHR ( Intze type with pile foundation) and Accommodate FHTC under JJM with allied work for Gopinathpur W/S scheme
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 600 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Lohaganja PWSS
Laying of Rising Main, Partial Distribution of pipeline, Providing FHTC, Construction of 300 Cum capacity OHR with 20m Staging Height including Soil Investigation, Construction of Pump House for implementation of Bhoir Piped Water Supply Scheme.
Laying of Distribution System, Providing FHTC, Soil investigation, Construction of 300 cum capacity OHR, Construction of Pump House, Boundary Wall, Service Road, for Gar Shyamnagar in under N 24Pgs W/S Div-I, PHE Dte
Construction of 450 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for SERPUR Piped Water Supply Scheme to accommodate FHTC in Bhangar-I Block
Soil investigation in connection with construction of bridge over Kamakhya Khal under Damodar Canal Division at Village-Chandipur, G.P.-Mertala, Block- Purbasthali-II. Purba Bardhaman. (IW/SI-94/2025-26), Project ID- IW2526343055000 (3rd Call)
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 350 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Installation of IEP, Pump House etc. for implementation of Saraihat Bajedonor PWSS.
Const of 200,350 CuM OHR (ZONE-I,II) with Soil Investigation, Laying distribution Boundary wall,Land development,road restoration and Providing FHTC and different works related to KUSUMBA WS scheme under BIRBHUM Division, PHE Dte
Construction of 400 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection and soil investigation under GOPIKANTAPUR Piped W/S. Scheme within Jamalpur Block under Burdwan Division, P.H.E Dte._3RD CALL
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 100 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Kakhar PWSS
Augmentation of SELIMABAD PWSS with LDS FHTC Risingmain Construction of 350 cum capacity OHR with 20.0 mtr Stag he soil investigation including construction of switchrooms 5.40mx3.6m Boundary walls for new site under Jamalpur BlockDist PurbaBurdwan
Augmentation of NADRA Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation and Rising Main under BARDHAMAN-II Block, District- Purba-Bardhaman. _2ND CALL.
Soil Investigation for proposed work Improvement of Irrigation potential in Kafran bundh minor irrigation system at G.P.Paraj Block Galsi I and Gajabali bundh minor irrigation system at G.P. Eral Block Ausgram II, Dist Purba Bardhaman.
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Jougram Khanpur Road from 6.50 km to 10.27 km Strengthening work including Reconstruction of 3 Nos. HP
Pump House ,150 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (1023 nos) under JJM with allied work of BRINDABANPUR PWSS
Soil investigation work for the proposed Pump House over Charial Khal at outfall point (Ch. 17.85 Km) under Budge Budge Municipality, Dist. South 24 Parganas under Suburban Drainage Sub-Division No.II of Suburban Drainage Division
Construction of 300CuM cap. 20 Mtr. staging height RCC Over Head Reservoir including pipe connection_cost of pipes,specials including soil investigation for BHATKUNDA and its adj.Mouzas W.S.Scheme under Durgapur Sub-Divin. under Burdwan Divn_PHE Dte.
BALUNDI SELALPUR MADHABPUR DHARKUNDU Z-II PWSS with TW Switch room boundary wall LDS FHTC RCC OHR with 20 mtr. soil investigation work at ARAMBAGH Block under Arambagh Sub-Division under Hooghly Division, PHE Dte.
Augmentation of MADHABPUR ZONE-I Piped Water Supply Scheme Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation and Rising Main under JAMALPUR Block, District- Purba-Bardhaman_3RD CALL.
Laying of Distribution System including specials,valves...all complete..Providing FHTC ...with all necessary ...Construction Of 300 Cum Capacity.. RCC OHR...Soil Investigation all complete..Ground Based WS Scheme at Andharkota under Nadia Divn, PHED
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 600 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Berail PWSS
Construction of 350 cum OHR with soil investigation, pump house cum chlorine room, Laying rising and distribution main pipe line with FHTC for NALMURI Piped Water Supply Scheme to accommodate FHTC in Bhangar-I Block
Laying of Distribution System including specials,valves...all compl..Providing FHTC ..with all necessary ..Construction Of 450Cum Capacity..RCC OHR..Soil Investigation all complete..Ground Based WS Scheme at Krishnagar Rural under Nadia Divn,PHED