Loading…
Loading…
1,548 results • Best match
Soil Investigation for construction of Proposed RCC Box Culvert over Moukhali Branch Khal at Ch. 0.35km near Pratap Das House under Mouza- Moukhali Kumrakhali, P.S- Jibantala, Block- Canning-II under Canning (I) Sub-Division of JID
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design and with necessary Estimate for upcoming project work of Kakina Road, From 0.00 km to 8.75 km,W/S
Construction of 300 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection , soil investigation foundation design of Sealdanga PWSS at J.B.PUR Block of Howrah District under Howrah Division, P. H. E. Dte.
Construction of 350 Cum Capacity OHR with 20mtr. Staging height, including with Soil Investigation for Augmentation of Banshihari piped water supply scheme at Banshihari Block in the District of Dakshin Dinajpur, under Balurghat Division, PHE Dte.
Laying of Distribution pipe line including all necessary works...Providing FHTC...Construction of 500 cum capacity 20 Mtr. staging height RCC OHR...Soil investigation...Mohanpur Water Supply Scheme..North 24 Parganas Water SupplyDivision-I, PHE. Dte
Soil Investigation work for the proposed Construction of G Plus 6 Storied building in Dr B N Bose Sub Divisional Hospital Barrackpore North 24 Parganas under Barrackpur Sub Division II PWD during the year 2022 23
Sinking of Tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 350 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House for implementation of Dilkunthi Piped Water Supply Scheme
Construction of different capacity RCC OHRs, switch rooms and boundary walls soil investigation and Different works including Laying of Distribution System, providing FHTCs of Zone-I to XX at Khayrasole Block under Birbhum Division, PHE Dte
KHETIA Piped Water Supply Scheme with Rising Main and Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at different TW site under BARDHAMAN-I Block, District- Purba-Bardhaman.
Laying of Distribution System including specials, valves....Construction of 150 Cum Capacity 20 Mtr. Staging Height RCC Over Head Reservoir...Soil Investigation...at Kulgachi to accommodate FHTC under Tehatta Sub-Divn under Nadia Divn, PHE Dte
LDS and Constn of RCC OHR of 400 cum capacity along soil investigation and constn. of PH cum chlorine room with and without sanitary of Kamarhati_Zone_II WS Scheme of Raina_II Block under Burdwan Dv. PHE. Dte.
Sinking of Tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 100 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road of Purba Mustafapur
Laying of Rising Main, Construction of 300 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Sayedpur Piped Water Supply Scheme at Harirampur Block.
Preparation of Intake arrangement layout and drawing details study and report recommentation for bank protection work carryout EIA and EMP study from IIEST IIT Kharagpur or Jadavpur university including soil investigation works for Bagda and Bongaon
Laying of Distribution System including specials, valves....Construction of 500 Cum Capacity 20 Mtr. Staging Height RCC Over Head Reservoir...Soil Investigation...at Shyamnagar to accommodate FHTC under Tehatta Sub-Divn under Nadia Divn, PHE Dte
Soil Investigation for construction of Proposed RCC box culvert over Moukhali Khal at Ch. 1.97 km. near Abu Jaffers house under Mouza-Moukhali-Kumarkhali, P.S. Jibantala, Block- Canning-Il under Canning (1) Sub-Division of JID
Augmentation of KAIGRAM Piped Water Supply Scheme with LDS, FHTC Rising main Construction of 250 cum capacity OHR with 20.0 mtr Staging height inclusive of soil investigation and Construction of Boundary wall under Kalna Sub-Division
Preparation of Detailed Project Report along with Topographical Survey Soil Investigation Traffic Survey and Axle Load Survey etc related to the work Jhargram Sevayatan Baita Dheruaghat Road 0.00 Km to 12.00 Kmp Widening and Strengthening under
Construction of 450 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design and Drawing including pipe connection, Soil Investigation for Nabinagar Piped Water Supply scheme at Kaliachak-I Block under MAAD
Soil Investigation for construction of Proposed RCC Box Culvert over Moukhali Khal at Ch. 1.60 km near Moukhali High school under Mouza- Moukhali Kumrakhali, P.S- Jibantala, Block- Canning-II under Canning (I) Sub-Division of JID
Soil Investigation work for the proposed 2(Two) no Bridges at Ch 0.00 and 145.00 of Minor-5 of Dy no 10 of KSMC under Kirnahar (I) Sub-Division within Mayurakshi South Canals Division,Bolpur,Birbhum.
SONAIAIMA PWSS with sinking of Tubewell LDSRising Main FHTC Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Sta he soil investigation boundary walls at different TW site under AUSGRAMII Block Dist PurbaBardhaman NEWSCHEME
Providing FHTC all complete ..Construction of RCC Over Head Reservoir including pile foundation, Soil Investigation..Construction of Boundary Wall and allied works ..Restoration Work.. for Hijuli (Zone-I,II,III, IV) ...under NAD-I, PHE Dte
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design, axle load survey and with necessary Estimate for upcoming project work of Chilakhana-Natabari road, from 0.00km to 9.8
Laying of Distribution System, Providing FHTC, Soil investigation, Construction of 300 cum capacity OHR, Construction of Pump House, Boundary Wall, Service Road, for KAUGACHHI ZONE-II in under N 24Pgs W/S Div-I, PHE Dte
Soil Test for Construction of R.C.C Box Culvert at Ch.176.65 of Soa khal from Ramnathpur Bazar to Kotalpur Patna within Block- Polba-Dadpur and P.S-Polba, Dist-Hooghly.
Soil Test for proposed construction of RCC bridge at 2140.00 m of CC-1 Branch Channel near Hossainpur at Ward No. 108 of KMC, P.S. Anandapur under MDD-II
Survey Geo-technical Investigation Design and Drawing along with Vetting from competent Authority as per nature of work for construction of Development projects within Jiaganj - Azimganj Municipality complete in all respect as per direction of EIC
GEO Technical Investigation and Measurement of Earth resistivity at the proposed 200MW (125 MW in 1st Phase and 75mw in 2nd phase) Solar park project site located under block Ramnagar-II, District-Purba Medinipur, West Bengal
see nit
Construction of 200 cum Capacity 20mtr Staging Height RCC Elevated Reservoir As Per Departmenl Type Design (Ref Dept. Super Struc. DRG. No. PCI OHR 42012 including Soil Investigation,Foundation Design All pipe Connection ForIchapur PWSS at J.B.
Laying of Distribution System including specials, valves...Construction of 250 Cum Capacity 20 Mtr. Staging Height RCC OHR...Soil Investigation...at Karimpur Jalangi Zone-VIII to accommodate FHTC under Tehatta Sub-Divn under Nadia Divn, PHE Dte
Laying Distribution System Providing House Hold Tap Connection (FHTC) 450 cu.m capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection soil investigation including pile design of AJANGACHI PWSS in AMTA-II Block of Howrah
Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 300 Cum OHR ( with pile foundation ) Accommodate FHTC ( 1050 Nos) under JJM with allied work for Nij Maitana Its Adjoining Mouzas Water Supply Scheme within Ramnagar-II
Bilaspur Z-II W S scheme with LDS Rising mainFHTC work Pump House500 cum capacity OHR with 20 mtrstaging height including soil investigation at JangiparaBlock inSerampore SubDivnDist- Hooghly under Hooghly Divn, PHE Dte. New Scheme 2ND CALL
Laying dist. system _Part-B-Y and constn. of RCC OHR of 300 cum capacity along soil investigation of KAYRAPUR -Part-B and its adj. mouzas WS. Scheme of Ausgram-I Block under Burdwan Division_ PHE. Dte.
SAHAPUR PWSS with Sinof tubewell LDS Rising Main FHTC Cons 150 cum capacity RCC OHR with 20.0 mtr. with Sta soil investigation cons switchrooms boundary walls at different TW site under MemariI Block Dist PurbaBardhaman NEW SCHEME
Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 300 Cum OHR ( with pile foundatio ) Accommodate FHTC ( 414 Nos) under JJM with allied work for Islampur Its Adjoining Mouzas Water Supply Scheme within Ramnagar-II Bloc
Const. of 250 CuM. capacity OHR with Soil Investigation, 5.90mX4.10m Pump/Chlorine room with sanitary arrangements Laying of Rising Main,Distribution System with FHTC incl. diff. works to RAMKRISHNAPUR PIPED WS SCHEME within Birbhum Divi.,PHE Dte
Soil Investigation work for construction of OHR (550 CUM CAPACITY) under Augmentation of Sub Surface Water Based Water Supply Scheme for Saltora PWSS under Bankura Sadar Sub Division of Bankura Division, P.H.E. Dte (Zone- II) (2nd Call)
Soil investigation, R.C.C. Elevated Reservoir of capacity 550cum and staging height 20.00 mtr. as per Departmental Drawing (Intze type with pile foundation) for Nunhunda And Adjoining Moujas PWSS in Bhagwanpur-I Block including supply of all labour
Construction of 1 no. 350 cum. Over Head Reservoir (OHR), (20 mtr. Staging Height) along with soil investigation, Construction, placing and fixing of FHTC platform at every individual beneficiary, pump connections etc. for Augmentation of Kusumtala W
Construction of 700 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes,specials including soil investigation for MAHESHDANGA and its adj. mouzas W.S. scheme under Burdwan Division, P.H.E. Dte.
Laying of Distribution System including specials, valves...Construction of 700Cum Capacity 20 Mtr. Staging Height RCC Over Head Reservoir...Soil Investigation...at Tehatta Phase-II to accommodate FHTC in Tehatta-I Block under Nadia Divn, PHE Dte.
Preparation of Detailed Project Report with preparation of PPT with Traffic Census, Soil Investigation, Topography Survey with Total Station and Planning, Design, Drawing, Detailed Estimate in accordance with IRC 37-2018 and IRC 9-1972 for Sreepolly
Soil investigation construction of R.C.C. Elevated Reservoir of capacity 100 cum and staging height 20.00 mtr. with allied works under Agar its adjoining moujas water supply Scheme in Sahid Matangini Block including supply of all labour mate
Soil Investigation work for construction of OHR (150 CUM CAPACITY) staging hight 20 mtr. under Augmentation of water supply scheme for Ashna (Katjuridanga) and adjoining mouzas under Bankura (Sadar) Sub - Division within Bankura Division, PHE Dte. (Z
Preparation of Detailed Project Report with all necessary survey, field works, traffic census and soil investigation and with necessary Estimate for upcoming project work of Dinhata Balarampur Chilakhana Road, from 0.00 km to 20.00 km, W/S
Soil Investigation work for construction of OHR (250 CUM CAPACITY) under Augmentation of Sub Surface Water Based Water Supply Scheme for Saltora PWSS under Bankura Sadar Sub Division of Bankura Division, P.H.E. Dte (Zone- I) (2nd Call)
Const. of 300 CuM. capacity OHR with Soil Investigation, 5.90mX4.10m Pump/Chlorine room with sanitary arrangements Laying of Rising Main, Distribution System with FHTC incl. diff. works related to DASKALGRAM PIPED WS SCHEME within Birbhum Divi.,PHED