Loading…
Loading…
1,548 results • Best match
Construction of 600 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation and FHTC In Daluigaccha Mouza For AUG Of KAMARKUNDU (ZONE-VI) Piped Water Supply Scheme under Chandannagar Sub Division Block-SINGUR , District Hooghl
Soil investigation, 50 cum OHR ( type with pile foundation) under JJM with allied work for BANCHBERA PWSS within Egra-II Block including supply of all labour materials under Digha Sub-Division of Tamluk Division, PHE Dte. (PART-C)
Tube well, Pump House ,250 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, RCC Culvert,CC Pavement, Boundary Wall, Soil investigation Accommodate FHTC (1582 nos) under JJM with allied work
Pump House ,300 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (1750 nos) under JJM with allied work for BIJAYNAGAR PWSS in Bhagwanpur-II
Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 300 cum OHR (Intze type with pile foundation) Accommodate FHTC (291 nos) under JJM with allied work for ASTICHAK (ZONE-I) PWSS within Egra-
Soil Investigation work for construction of Single Lane Bridge over Sangrampur khal at Bamna near Uttar Bamna Polepara Jame Masjid under Diamond Harbour Irr Sub-division of Canals Division of Canals Division in Mouza- Bamna, Block-Magrahat etc.
Construction 100 cum capacity of RCC OHWR and Soil Investigation and laying of Rising Main, Distribution Main with FHTC from existing and new proposed distribution system at Garibpur WS Scheme under Bongaon Sub-Divi,PHE Dte.(New Scheme)
Soil investigation for construction of proposed R.C.C. Bridge over Drainage Gangur Channel at Ch. 1581 Village Kola G.P. Badla Block Kalna II District Purba Bardhaman and R.C.C. Bridge cum Regulator Gate over Behula at Ch. 256 Village Madhupu
Construction of 300 Cum capacity OHR (20 mtr Staging Height) including design and drawing of Pile Foundation an Pile Cap after Soil Investigation along with Laying distribution system, Rising main, ... for Augmentation of KULDIA of MOGRAHAT-II Block
Sinking of 150 mm X 100 mm Dia deep tubewell, const.100 CuM capacity OHR with soil Investigation, Pump,Chlorine room ..... FHTC and different works related to SEKUPUR and adjoining mouzas WS scheme under BIRBHUM Division, PHE Dte.
Construction of 350CuM cap. 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials including soil investigation for GOLGRAM and its adj. mouzas W.S. scheme Durgapur Sub-Divn. under Burdwan_Divn_ PHE Dte.
Consultancy
Preparation of DPR as per NIeT
Laying distribution pipe line, soil test and construction of R.C.C. Over Head Reservoir of capacity 500 Cum and staging height 20.00 mtr. and FHTC under JJM with allied work for Monoharpur
CONSTRUCTION OF SINGLE STORIED SCHOOL BUILDING OF JODHPUR PARK BOYS SCHOOL (HS), Soil Test must be done by Lowest Tenderer (L1 Bidder) before starting of the work by his own cost
Laying distribution pipe line, soil test and construction of R.C.C. Over Head Reservoir of capacity 200 Cum and staging height 20.00 mtr. with allied work under Augmentation of Belda Zone-II
Geo-Technical investigation, Design (only sub-structure i.e. foundation part) and Construction of RCC Elevated Over Head Reservoir (Intze type) of capacity 550 cum of staging height 20 meter...at Zone-I in ward no. 14, Chakdah Municipality
Soil investigation Construction of RCC over Head Reservoir of capacity 300 cum and staging height 20.00 mtr as per Deptt. drawing ( Intze type with pile foundation), under JJM with allied work for Harshankar PWSS in Tamluk Dev. Block including
250 cum OHR (Intze type with pile foundation), Rising main, Laying distribution pipe line,Pump House , Boundary Wall, Soil investigation and Accommodate FHTC (460 nos) under JJM with allied work for Ita Baria- PWSS in Bhagwanpur Block within Contai
Construction of 450 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Sadipur Piped W/S scheme at Kaliachak-II Block under MAAD (2ND Call).
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 300 Cum OHR Accommodate FHTC ( 238 Nos) under JJM with allied work for KANPUR (Z-II) PWSS within Ramnagar-II Block under Digha Sub-Division
Laying of Rising Main, Construction of 400 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Repairing of Pump House (H/W site and 2nd TW site) and construction of Boundary Wall for Augmentation of KUMARGANJ PWSS.
Const. of 250 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design and Drawing including pipe connection, Soil Investigation and Providing FHTC for Bakrabad Piped W/S scheme at Kaliachak-III Block under MAAD
Pump House ,200 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (357 nos) under JJM with allied work of PACHAHRI PWSS within Bhagwanpur II B
Pump House ,50 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (20 nos) under JJM with allied work of GARA BAR PWSS within Bhagwanpur-II
Soil investigation, 150 cum OHR (Tortch type with pile foundation) under JJM with allied work for Mirjapur PWSS within Egra-II Block including supply of all labour materials under Digha Sub-Division of Tamluk Division, PHE Dte. (PART-D)
Const. of 700 Cum capacity 20 Mtr. staging height RCC OHR as per Departmental Design and Drawing including pipe connection, Soil Investigation and Providing FHTC for U. Jadupur Piped Water Supply Scheme at English Bazar under MAAD(2nd Call)
Construction of 300 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Kadamtala Piped W/S scheme at Kaliachak-I Block under MAAD.(3rd Call)
Soil investigation work for the proposed bridges and sluice gate over Tilbona Kandar near ch.2140 (Lat 23.659841 and long- 88.051334), Ch. 3360 (Lat -23.665088 and long- 88.058708) and Ch. 4392 (Lat 23.66756029 and long- 88.06433797) Under Salar (I)
Tube well, Pump House, 50 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, RCC Culvert, CC Pavement, Boundary Wall, Soil investigation Accommodate FHTC (227 nos) under JJM with allied work for
Tube well,Pump House ,250 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, RCC Culvert, CC Pavement, Boundary Wall, Soil investigation Accommodate FHTC (1808 nos) under JJM with allied work for
Soil investigation, 250 cum OHR (Intze type with pile foundation) under JJM with allied work for Rajendrachak PWSS within Egra-II Block including supply of all labour materials under Digha Sub-Division of Tamluk Division, PHE Dte. (PART- D)
Soil Investigation and Total Station Survey work in connection with the work of Construction of RCC Road Bridge Cum Sluice at Dhosa over Hobka Khal under Block , P.S. Joynagar I under Mograhat Drainage Division during the year 2019 -2020.
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 209 Nos) under JJM with allied work for KANPUR (Zone-IV) PWSS within Ramnagar-II Block under Digha Sub-Division
MOHANPUR PWS Scheme with sinking of Tube-well, LDS, Rising Main,FHTC, Constn. of 600 cum capacity RCC OHR with 20.0 mtr. Staging ht. including soil investigation ....... at different TW site under Galsi-II Block, District- Purba-Bardhaman.NEW SCHEME.
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 321 Nos) under JJM with allied work for SANKARPUR (Zone-V) PWSS within Ramnagar-I Block under Digha Sub-Division
Construction of 250 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials including soil investigation for TEHATA-Zone-II and its adj. mouzas W.S. scheme under Burdwan Division, P.H.E. Dte.
Soil investigation R.C.C. Elevated Reservoir of capacity 250 cum and staging height 20.00 mtr. as per Departmental Drawing (Intze type with pile foundation) under JJM with allied work for Dakshin Ankha PWSS in Moyna Block including supply of all
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 184 Nos) under JJM with allied work for KANPUR (Zone-V) PWSS within Ramnagar-II Block under Digha Sub-Division
Soil investigation work for the proposed R.C.C bridge in place of R.C.C. Single vented box culvert in Bamunmura at Ch. 12.02 Km over river Sunti under Barasat Municipality, P.S Barasat, District of North 24 Parganas under Bidyadhari Drainage Divisio
Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Sabdulpur Piped W/S scheme at Kaliachak-III Block under MAAD.(3rd Call)
Tube well, Pump House ,150 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (1018 nos) under JJM with allied work for Nonakourda- PWSS in Pata
Construction of 450 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and Providing FHTC for Hamidpur Piped W/S scheme at Kaliachak-II under MAAD. (3rd Call)
Soil Investigation work in connection of construction of RCC Over Head Reservoir (Capacity-400Cum) due to change of land with Laying of Balance Distribution Pipe Line for provided balance FHTC and other allied works of Narandiha Piped Water Supply
Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Gayeshbari Piped W/S scheme at Kaliachak-I Block under MAAD. (2ND Call)
Construction of Pump House for installation of pump machineries and L.T.panel at tail regulator gate at TMLC of IandWD department for alternate arrangement of intake at fulbari along with soil investigation for the construction of pump house for inst
Construction of 300 cum cap. 20 Mtr. staging height RCC Over Head Reservoir including pipe contn. and cost of pipes, specials including soil investigation for DEBSALA and its adj.Mouzas W.S. scheme under Durgapur Sub-Divn.under Burdwan Divn._PHE Dte.
Pump House ,200 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (1373 nos) under JJM with allied work of DAKSHIN PATHAR BERYA AND ITS ADJOIN
Bilaspur (Zone-I) Water Supply scheme with LDS, Rising main, FHTC work, Pump House, 450 cum capacity OHR with 20 mtr. staging height including soil investigation at Jangipara Block in Serampore Sub-Division, DiSt- Hooghly under Hooghly Divn.PHE DTE.
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 99 Nos) under JJM with allied work for KANPUR (Zone-III) PWSS within Ramnagar-II Block under Digha Sub-Division