Loading…
Loading…
1,548 results • Best match
Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Mosimpur Piped W/S scheme at Kaliachak-I Block under MAAD. (3rd Call)
Pump House ,250 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (475 nos) under JJM with allied work of KAYEMGIRI PWSS within Bhagwanpur-II B
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 267 Nos) under JJM with allied work for SANKARPUR (Zone-III) PWSS within Ramnagar-I Block under Digha Sub-Divisi
Sinking Of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 600 cum OHR (Intze type with pile foundation) and Accommodate FHTC under JJM with allied work for Sabra and its adjoining mouzas W/S scheme
Detailed topographical and hydrographical survey including Soil investigation on Lower Bagjola Khal and BB-1 khal for a approx length of 31.73 KM consisting of survey and preparation of maps, plan, cross section and long section within Block- Rajarha
Pump House ,200 cum OHR (Intze type with pile foundation), Rising main, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (845 nos) under JJM with allied work of KAPASDA PWSS within Contai-I Block under Contai Sub-
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 355 Nos) under JJM with allied work for SANKARPUR (Zone-I) PWSS within Ramnagar-I Block under Digha Sub-Division
Sinking of Tubewell, Laying of Rising Main, Providing FHTC, Construction of 600 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Repairing of Pump House and Blower Room etc. for Augmentation of K.D. Trimohini Zone-II PWSS.
Construction 350 cum capacity of RCC OHWR and Soil Investigation and laying of Rising Main, Distribution Main with FHTC from existing and new proposed distribution system at Purana Bongaon WS Scheme under Bongaon Sub-Divi,PHE Dte.(New Scheme)
Pump House ,300 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (500 nos) under JJM with allied work for URURI- PWSS in Bhagwanpur-II Block
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 50 Cum OHR Accommodate FHTC ( 158 Nos) under JJM with allied work for Jhaugerya Its Adjoining Mouzas Water Supply Scheme within Ramnagar-I Block un
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 294 Nos) under JJM with allied work for SANKARPUR (Zone-IV) PWSS within Ramnagar-I Block under Digha Sub-Division
KUSHA PWSS with sinking of Tubewell LDS Rising Main FHTC Cons of 150 cum capacity RCC OHR with 20.0 mtr. with Sta soil investigation cons switchrooms boundary walls at different TW site under BardhamanII Block Dist PurbaBardhaman NEW SCHEME
Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Mobarakpur Piped W/S scheme at Kaliachak-II Block under MAAD.(3rd Call)
Pump House,350 cum OHR (Intze type with pile foundation), Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC under JJM with allied work for TIKASHI- PWSS in Khejuri-I Block within Contai Sub-Division under Tamluk Di
Constn. of 400 cum capacity 20 Mtr. staging height RCC O.H. Reservoir including pipe connection and cost of pipes,specials including soil investigation for AMRARGARH and its adj.mouzas W.S. scheme under Durgapur Sub-Divn. under Burdwan Divn, PHE Dte
Const. of 700 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design and Drawing including pipe connection, Soil Investigation and Providing FHTC for Deonapur Piped W/S scheme at Kaliachak-III Block under MAAD.
Const of 5.90 m X 4.10 m Pump room with sanitary arrangts, 250 and 350CuM OHR (ZONE-Iand II) Soil Investigation, Land development, Laying distribution, road restoration and Providing FHTC at MASHRA WS scheme under BIRBHUM Division, PHE Dte
Construction 200 cum capacity of RCC OHWR and Soil Investigation and laying of Rising Main, Distribution Main with FHTC from existing and new proposed distribution system at Paschim Huda WS Scheme under Bongaon Sub-Divi,PHE Dte.(New Scheme)
Estimate for Soil investigation Gobindapur by pass to Mukundapur road via baganchara bhaluka from Ch 5.5km to Ch 19.95 Km under Ranaghat Highway Sub Division of Nadia Highway Division no II PW Roads Directorate in the district of Nadia
Soil Test of Construction of G plus 2 building for pay and use toilet stall, rest room, ticket counter etc. at Township Central Bus Stand under ward no -29 within Haldia Municipality.
Construction of 750 cum capacity 20 mtr staging height RCC Over Head Reservior with Pile foundation including Soil test , pipe connection and cost of pipes, specials for NANDAI and its adjoining mouzas
Laying distribution pipe line, soil test and construction of R.C.C. Over Head Reservoir of capacity 550 Cum and staging height 20.00 mtr ... within Midnapore Sadar Sub-division under Midnapore Division, PHE Dte.
see NIQ
Soil investigation, Construction of 50 cum OHR (tourch type with pile foundation) under JJM with allied work for Bhatsalia PWSS within Egra-I Block including Supply of all labour materials under Digha Sub-Division of Tamluk Division, PHE Dte. (PART
Soil investigation site, Construction of 100 Cum OHR at HW Construction of P/H 2nd and 3rd site, laying of rising main distribution line and providing FHTC as per departmentalDesignDrawing for DALMONI TG Zi ZI ZII underBirpara S-D Alipurduar Division
Details of Soil Investigation work for the proposed minor bridges at Ch. 1.85 km, 5.95 km and 8.10 km on Memari Jougram Road (0.00 kmp to 10.33 kmp) under Burdwan South Highway Division in the district of Purba Bardhaman. (Non-Plan)
Construction of High lift Pump House, 450 cum OHR along with soil investigation work, boundary wall and laying of rising main under Augmentation of BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-III)
LOAPUR PWS Scheme with sinking of Tube-well,LDS, Rising Main,FHTC, Constn. of 600 cum capacity RCC OHR with 20.0 mtr. Staging ht. including soil investigation ......... at different TW site under Galsi-I Block, District- Purba-Bardhaman. NEW SCHEME.
Aug of DHATRIGRAM PWSS with LDS, FHTC, Rising main, Cons. of 500 cum capacity OHR with 20.0 mtr. Staging height with soil investigation including switch-room , boundary wall and repairing of OHR, switch room and boundary wall under Kalna I Block.
Laying of Distribution System, Rising Main System, Providing FHTC, Soil Investigation, Construction of 550 cum capacity RCC OHR, Pump House Boundary Wall, Service Road, Improvement Of Land for of Z-VII AMULIA in under N 24 Pgs WS Div-I,PHEDte
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 50 Cum OHR and Accommodate FHTC ( 270 Nos) under JJM with allied work for Daha daya and Its Adjoining Mouzas Water Supply Scheme within Ramnagar-I
Soil Investigation,Construction of Over Head Reservoir of capacity 350 Cum(Zone-I) AND 300 Cum(Zone-II) related to water supply scheme at SAHAPUR and its adjoining mouzas...including supply of all labour, materials ...under BIRBHUM Division, PHE Dte
Laying of Distribution System, Rising Main System, Providing FHTC, Soil Investigation, Construction of 500 cum capacity RCC OHR, Pump House Boundary Wall, Service Road, Improvement Of Land for of Z-VI BASHBARUNI in under N 24 Pgs WS Div-I,PHEDte
Soil Investigation Work at the site for Construction of state of art whole sale fish market AT SARKAR BAZAR, UNDER RS DAG NO. 2512, LR-4374, 4375, LR KHATIAN-7663, MOUZA-HALISAHAR AT WARD NO.8 HALISAHAR MUNICIPALITY, North 24 Parganas.
Tube well,Pump House ,250 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (1847 nos) under JJM with allied work for AJAYA- PWSS in Khejuri-I
Pump House ,150 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (200 nos) under JJM with allied work for PANCH BAJARI PWSS in Bhagwanpur-II B
Soil investigation work for the proposed R.C.C Bridge in place of R.C.C. Single vented box culvert at Vill Madanpur Krishnapur at Ch. 6.70 Km over river Sunti under GP Kenia Khamarpara , Block Barasat II, P.S Madhyamgram, Dist North 24 Pargana
Soil investigation for construction of a new bridge at Ch. 983.00 of Panagarh Branch Canal at Mouza Deyasa GP Guskara II Block Ausgram I District Purba Bardhaman under Dignagar I Section of Guskara I Sub-Division under Damodar Headworks Di
Aug. of BHALKI ZONE-II Piped Water Supply Scheme with Rising Main and Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at Headwork TW site under Ausgram-II Block, District- Purba-Bardhaman.
NANAGAR PWS Scheme with sinking of Tube-well,LDS, Rising Main,FHTC, Constn. of 400 cum capacity RCC OHR with 20.0 mtr. Staging ht. including soil investigation ........ at different TW site under Katwa-I Block, District- Purba-Bardhaman. NEW SCHEME.
Aug. of BHALKI ZONE-I Piped Water Supply Scheme with Rising Main and Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at Headwork TW site under Ausgram-II Block, District-- Purba-Bardhaman.
Preparation of PPT Details Project Report and Topographical survey Axle load survey VDF Conducting traffic census for a continuous period of 7 days (7 x 24 hrs) along Soil investigation videography and photography in connection with W/S Ramkanali Rai
Filling the existing trench with moorum at the OHR site of Bejpura PWSS as per the soil Investigation Report by IIEST, Shibpur of Bejpura Piped Water Supply Scheme under Malda Division, PHE Dte. In the District of Malda. (4th Call)
Laying of Distribution System, Rising Main System, Providing FHTC, Soil Investigation, Construction of 450 cum capacity RCC OHR, Pump House Boundary Wall, Service Road, Improvement Of Land for of Z-I KAMDEBKATI under N 24 Pgs WS Div-I,PHEDte
Laying of Rising Main, Construction of 350 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Repairing of Pump House (H/W site and 2nd TW site), Blower room and repairing of Boundary Wall for Augmentation of AGACHHA PWSS.
Soil investigation Construction of RCC Over Head of capacity 200 cum and staging height 20.00 mtr as per Deptt. Drawing ( Intze type with pile foundation), under JJM with allied work for Nilkanthia PWSS in Tamluk Dev. Block including supply of all
Soil investigation work for proposed OHR construction of 150 cum OHR construction of P/H and B/W at bith TW site LDS as per Depratmental Design Drawing for DALMORE RAMJHORA TG PWSS under Birpara S-D Alipurdiar Division (2nd Call)
Construction of 250 cum capacity 20 Mtr. staging height RCC Over Head Reservoir, pipe connection and cost of pipes, specials and Soil Investigation for Construction of 250 CUM OHR at Bareya Zone-II W/S. scheme under Nadia Division P.H.E. Dte.
Laying of Distribution System, Rising Main System, Providing FHTC, Soil Investigation, Construction of 500 cum capacity RCC OHR,Pump House Boundary Wall,Service Road,Improvement Of Land for of Z-VIII CHYANGDANA in under N 24 Pgs WS Div-I,PHEDt