Loading…
Loading…
1,548 results • Best match
Sinking of Tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 250 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for of Chakla PWSS
Soil investigation R.C.C. Elevated Reservoir of capacity 300cum and staging height 20.00 mtr. as per Departmental Drawing (Intze type with pile foundation) with allied works under JJM for Naichhanpur and its Adjoining Mouzas PWSS in Moyna Block
Construction of 150 CUM capacity OHR,including Soil Investigation, 5.09mX4.1 m Pump House,Chlorine Room with Sanitary...Laying of Rising Main and Distribution System FHTC and const.Boundary Wall...Ulandi PIPED WS SCHEME within Birbhum Divn, PHE Dte
Const. of 200 CuM. capacity OHR with Soil Investigation, 5.90mX4.10m Pump/Chlorine room with sanitary arrangements Laying of Rising Main, Distribution System with FHTC incl. diff. works related to FEUGRAM PIPED WS SCHEME within Birbhum Division,PHED
Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 300 Cum OHR ( with pile foundation ) Accommodate FHTC ( 534 Nos) under JJM with allied work for Uttar Gopalpur Its Adjoining Mouzas Water Supply Scheme within Ramnagar-I
Construction of 500 m3 capacity 20 M. staging height R.C.C. Over Head Water Reservoir as per departmental design, drawing and specification including R.C.C. Bored Pile and Pile Cap after soil investigation alongwith Providing 100 FHTC and Laying
Const of Pump,Chlorine room with sanitary arrangts,200 CuM OHR, Boundary wall, Soil Investigation, Land development,Rising main,Laying distribution,Providing FHTC connection related to WS scheme at CHHORA its adjoining mouzas under BIRBHUM Divn,PHED
Construction of 200 Cu.M. capacity RCC Elevated Reservoir of 20 mtr. Staging Height with laying distribution system, soil investigation, rising main, boring of deep tubewells by ODEX-165 .......under Jal Jeevan Mission for PATHAR HIRHIRAR CHHAT PWSS
Construction and Commissioning of RCC OHR_inclu. Soil investigation work of cap. 300 CuM and staging height 20 mtr. as per approved drawing with allied works for Vidyasagar Industrial Park_Z_1 W_S Scheme Kharagpur under Midnapore Divn PHE Dte.
Soil investigation R.C.C. Elevated Reservoir of capacity 350cum and staging height 20.00 mtr. as per Departmental Drawing (Intze type with pile foundation) with allied works under JJM for Ramchandrapur and its Adjoining Mouzas PWSS in Moyna Block
Const. of 200 CuM. capacity OHR with Soil Investigation, 5.90mX4.10m Pump/Chlorine room with sanitary arrangements Laying of Rising Main, Distribution System with FHTC incl. diff. works related to MADDA PIPED WS SCHEME within Birbhum Division, PHED
Construction and Commissioning of 250 Cum OHR Soil Investigation Pump House Boundary wall Rising main FHTC work with 2 years o and m for Proposed Chhoto Nakdana PWSS Block_Garhbeta_II Dist_Paschim Medinipore under Midnapur Division PHE Dte. PART_I
The DPR will consist of detailed survey, soil investigation report, detailed drawing, detailed estimate, C.D. work, drainage work, protection work also including all photographs under RIDF. Rate to be quoted on percentage basis with respect to its
Engagement Of Consultant For design, drawing, topographical survey including necessary soil investigation for emergent river bank protection work at left bank of river Teesta for protection of 12th Mile at NH-10 in P.S. Kalimpong Under KID
Soil Investigation work for construction of OHR (600 CUM CAPACITY) under Augmentation of Barjora Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase- I) within Barjora Block under Bankura Sadar Sub Division ( (Zone- IB)
Sinking of Tubewell, Laying of Rising Main an Distribution System, Providing FHTC, Construction of 400 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House etc. for Augmentation of Harirampur PWSS at Harirampur Block
Preparation and submission of Detailed Project Report with preparation of PPT conducting Traffic Census as per IRC 009 1972 for 7 days continuous 24 hrs, Soil investigation, Topographical Survey with Total Station alongwith Axle Load Survey, Falling
Construction of 700 cum capacity 20 Mtr. staging height RCC Over Head Reservoir (including pile foundation), pipe connection and cost of pipes, specials and Soil Investigation for Construction of 700 cum OHR at Kamgachi Zone-I PWSS
Consultancy Services for Hydrological, topographical and Geotechnical survey including detailed design of culverts or bridges for design of the proposed fencing at GIN 58,59,63,64,65,66,71,72,73,74,75,76,78,79,80,81,82 and 83 (Total Length - 44.52 Km) at Murshidabad district West Bengal. SW: - Washing, mopping and cleaning etc. manually at BFD-VII, IBBZ-I, CPWD, Murshidabad during 2026-27.
Augmentation of BULBULCHANDI Piped water supply scheme for the work of Geotechnical Study, construction of 700
GeoTechnical and Hydro- geological Sub Surface Investigation, Surveying, Planning, Designing, Construction and commissioning under AMRUT project.
Geo Technical Investigation at Different Locations in Between Ch. 0.00 to 420.00 of Dy-08 of SMC in Block and P.S.- Khatra in District- Bankura of K.C. Sub-Division No-V under Kangsabati Canals Division No.-II
Supply of water and soil testing kits for 69 Blocks Level laboratories cum Training centre in three districts South 24 Pgs, North 24 Pgs and Purba Medinipur.
Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall, soil investigation , 50 cum OHR Accommodate FHTC (131 nos) under JJM with allied work for PANCHBERRYA PWSS in Sahid Matangini Block including supply of all labour
MAGRA PWSS with Sinking of Tubewell LDS Rising Main FHTC Construction of 250 cum capacity OHR with 20.0 mtr. with Sta height soil investigation 5.40mx3.60m boundary walls with gate at TW siteBlock MemariI Dist Purba Bardhaman NEW SCHEME
Construction of 200 CuM. capacity OHR with Soil Investigation, 5.90 m X 4.10 m Pump,Chlorine room ....... FHTC and different works related to BHEPUR PIPED WSUPPLY SCHEME (including supply of all labour, materials under Birbhum Division, PHE Dte
Soil investigation construction of 200 cum OHR (Intze type with pile foundation) under JJM with allied work for JAMITTA PWSS in Sahid Matangini Block including supply of all labour materials within Tamluk Sub-Division under Tamluk Division, P
Soil Investigation work for construction of CWR (250 CUM CAPACITY) under Augmentation of Sub Surface Water Based Water Supply Scheme for Saltora PWSS under Bankura Sadar Sub Division of Bankura Division, P.H.E. Dte. (Head Work Site) (2nd Call)
Sinking of tubewell, Laying of Rising Main an Distribution System, Providing FHTC, Construction of 450 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Repairing of Pump House etc.for Augmentation of Teor PWSS at Hili Block
Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 250 cum OHR (Intze type with pile foundation) Accommodate FHTC (55 nos) under JJM with allied work for Bathuari (Zone-III) PWSS within Egra
Const of 250 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design and Drawing including pipe connection, Soil Investigation and Providing FHTC for Sakullapur Piped W/S at Kaliachak-II Block under MAAD
Aug. of DOGACHIA PWSS with LDS, FHTC, Rising main, Construction of 200 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation and BW construction at 2nd TW site under Purbasthali-I Block, Dist-Purba Bardhaman
Hiring of Consultants - Milestone/Deliverable Based - Structural Design, Soil Investigation and Estimate Abstrack & Yardstick including BoQ and Current Market Rate Analysis for Provn of 7600 MT Amn Storage at Katihar (PH-II of Two Phs); DPR, RFP Prepa..
Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 250 cum OHR (Intze type with pile foundation) Accommodate FHTC (48 nos) under JJM with allied work for Bathuari (Zone-IV) PWSS within Egra-
Tube well, Pump House, 350 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (2353 nos) under JJM with allied work for Chingur Dania- PWSS
Pump House ,250 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (511 nos) under JJM with allied work of Manikjor PWSS within Bhagwanpur-II
Const. of 500 Cum capacity 20 Mtr. staging height RCC OHR as per Departmental Design and Drawing including pipe connection, Soil Investigation and Providing FHTC for Khaschandpur Piped Water Supply Scheme at Kaliachak-I under MAAD (2nd Call)
Tube well, Pump House ,250 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, RCC Culvert, CC Pavement, Boundary Wall, Soil investigation Accommodate FHTC (195 nos) under JJM with allied work
Aug. of Hatkalna PWSS with LDS FHTC Const. of 1000 cum capacity OHR with 20.0 mtr. with Staging height soil investigation construction of switchrooms boundary walls at TW site repairing of switch rooms under KalnaI Block Dist PurbaBardhaman
Sinking of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 250 cum OHR (Intze type with pile foundation) Accommodate FHTC (24 nos) under JJM with allied work for Bathuari (Zone-II) PWSS within Egra-
Const. of 900 Cum capacity 20 Mtr. staging height RCC OHR as per Departmental Design and Drawing including pipe connection, Soil Investigation and Providing FHTC for Alipur Piped W/s Scheme at Kaliachak-I under MAAD.(2nd Call)
Sinking deep tubewell , Pump, Chlorine room with sanitary arran.350,300,150 CuM capacity OHR. 300 CuM CWR, and Soil Investigation, Laying distribution..Zone-I,II,III , Providing FHTC related to ws scheme AYAS its adj.mouzas under BIRBHUM Divn,PHEDte
Interconnection between tube wells and OHR and Construction of OHR 350 cum capacity (DRG. NO.- PC-I/OHR/12/2012) 20.0mtr staging height along with pipe connection, soil investigation design etc for Raspur PWSS in Amta-I Block
Const. of 150 Cum. capacity OHR with Soil Investigation, 5.90mX4.10m Pump/Chlorine room with sanitary arrangements Laying of Rising Main, Distribution System with FHTC incl. diff. works related to GOALDIHI PIPED WS SCHEME within Birbhum Divi.,PHE Dte
Pump House ,300 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (460 nos) under JJM with allied work of Bahadurpur PWSS within Bhagwanpur-II
Aug. of Borshul Z I PWSS(Mouzas Barshul Tatkhanda Dakshin Goplapur with LDS FHTC Rising main Construction of 250 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation under BARDHAMAN II Block Dist Purba Burdwan
Construction of 300 cum capacity 20 Mtr. staging height RCC Over Head Reservoir including pipe connection and cost of pipes, specials including soil investigation for ITLA and its adj. mouzas W.S. scheme under Burdwan Division, P.H.E. Dte.Ref. Dr
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 50 Cum OHR Accommodate FHTC ( 236 Nos) under JJM with allied work for DAKSHIN KALYANPUR Its Adjoining Mouzas Water Supply Scheme within Ramnagar-I
Sub Surface Based PWS Scheme with LDS,FHTC, Constn. of different capacity RCC OHRs with 20.0 mtr. Staging height including soil investigation, Constn. of CWR ........... of SHILLA PWS Scheme under Galsi-II Block, District- Purba-Bardhaman. NEW SCHEME
Construction of 400 M3 Capacity OHR with Soil Investigation and FHTC of Uttar Harishchandrapur Zone-II Piped Water Supply Scheme at Harishchandrapur-I and II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.