Loading…
Loading…
1,548 results • Best match
Sinking of tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 500 Cum capacity OHR with 20m Staging Height including with Soil Investigation etc. for Augmentation of Hili Piped Water Supply Scheme.
Supplying, Laying, Distribution all type of specials..Providing FHTC laying, fitting..Construction Soil investigation of 350 Cum Capacity RCC OHR.Subarna Behar ZONE-II in Krishnagar-I Block of Nadia District under Nadia Division PHE Dte.
Laying distribution pipe line, Pump House, Boundary Wall soil investigation, Accommodate FHTC ( 500Nos) under JJM with allied work for Dakshin Sitala Its Adjoining Mouzas Water Supply Scheme within Ramnagar-II Block under Digha Sub-Division
Tantisal W/S scheme with LDS Rising mainFHTC workPump House(5.9mx4.1m) with sanitary w/s arrangementsPump house(4.1mx3.5m)450 cum capacityOHR with20 mtr. staging height including soil investigation at Khanakul-IBlockin ArambaghSub-Divn, Dist-Hooghly.
Laying of Rising Main, Providing FHTC, Construction of 200 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Sundail Piped Water Supply Scheme
Interconnection between Tube wells OHR and Construction of 700 cu.m. capacity 20 mtr staging height RCC Over Head Reservoir including Pipe connection soil investigation Baniban with foundation design Baniban Piped Water Supply Scheme (Zone-III)
Laying of Distribution System including specials,valves...all compl..Providing FHTC ..with all necessary ..Construction Of 450Cum Capacity..RCC OHR..Soil Investigation all complete..Ground Based WS Scheme at Durgapur Chowgacha under Nadia Divn,PHED
Sinking of Tubewell, Laying of Rising Main, Providing FHTC, Construction of 450 Cum capacity OHR with 20m Staging Height including Soil Investigation, Construction of blower room and Pump House, etc. for Augmentation of Kamarpara PWSS
Soil Investigation of SAMD (Part-1) Channel and 17 (Seventeen) Nos non I and WD Khals within Rajpur-Sonarpur Municipality, GP-Sonarpur-II, Bonhooghly-II, South Garia, Begampur and Ramnagar-II, Block-Sonarpur and Baruipur
Sinking of Tubewell, Laying of Rising Main an Distribution System, Providing FHTC, Construction of 600 Cum capacity OHR with 20m Staging Height including with Soil Investigation etc for implementation of Baldu Piped Water Supply Scheme.
ORGRAM Piped Water Supply Scheme with Rising Main and Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation at Head work site under Ausgram Block, Distric- Purba-Bardhaman.
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 500 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Chandipur PWSS
Estimate for Soil Investigation for Ranaghat Krishnanagar State Highway SH-11 under Ranaghat Highway Sub-Division of Nadia Highway Division NoII P.W.Roads Dte in the district of Nadia during the year 25-26 2nd Call
Construction Pump,Chlorine room with sanitary arrangements,350 CuM OHR,Boundary wall,Soil Investigation,Land development,Rising main, Laying distribution,road restoration,Providing FHTC..at NARAYANPUR,Zone-I-II WS scheme under BIRBHUM Division,PHEDte
Soil Investigation for construction of Proposed RCC Box Culvert over Moukhali Khal at Ch. 1.10km near Rajjak Molla House under Mouza- Moukhali Kumrakhali, P.S- Jibantala, Block- Canning-II under Canning (I) Sub-Division of JID
Soil investigation work in connection with the construction of new bridges over river Banka near Bidyarthi Bhaban Girls High School and at Raynagar in Burdwan municipalityan and Block Burdwan-I, P.S - burdwan, District- Purba Bardhaman
Custom Bid for Services - Area survey, soil investigation and underground mapping for installation of pipelines and other infrastructure for sourcing Oxygen, Nitrogen and Argon gases from DSP to ASP Similar Category GIS related Survey Services
Soil Investigation work in connection with the work of Construction of RCC Bridge over Peali Channel at 2580 M in mouza Machpukur under GP Brindakhali under Block and PS Baruipur in Dist South 24 Parganas
Sinking of 300X200 mm Dia and 180 m deep tubewell, Pump/Chlorine room 250 CuM OHR, Boundary wall, Soil Investigation, Laying distribution etc.. Providing FHTC at Dhananjaypur its adjoining mouzas under BIRBHUM Division, PHE Dte
Construction of 600 cum capacity 20 mtr. Staging height RCC Elevated Reservoir as per Departmental Design Drawing including Soil Investigation, design of pile foundation and all pipe connections for UDAYNARAYANPUR ZONE-1 and 2 PWSS
Soil investigation work (laboratory investigation in Departmental lab) for the proposed construction of R.C.C Bridge at 10.00 km. of Keorapukur Khal at Basapara, opposite to L.J.D. Law College within Mouza - Raghabpur, G.P - Panakua, Block - Bishnupu
Laying of Rising Main and Distribution System, Providing FHTC, Construction of 500 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Nahit PWSS
Construction of Pump House Boundary wall Soil investigation Construction of 500 cum OHR and Accommodate FHTC with allied work under JJM for Krishnapur PWSS in Chandrakona II block under Midnapore Division, PHE Dte. PART A
Augmentation of SEHARA PWSS with LDSRising mainConstruction of 350 cum capacity OHR with 20.0 mtr Staging height inclusive of soil test FHTC under BurdwanI Block Dist Purba-Burdwan
Augmentation of SANKARI PWSS with LDSRising main Construction of 250 cum capacity OHR with 20.0 mtr Staging height inclusive of soil test FHTC under Khandaghosh BlockDist Purba-Burdwan
Soil Test in connection with the work of diversion and renovation of existing damaged and silted up precast pile Debipur Ghat Jetty located opposite of Majher Kheya Jetty
NIT FOR PURCHASE OF LABORATORY CHEMICALS AND FILTER PAPERS FOR SOIL TESTING LABORATORY, BURDWAN, BANKURA AND MALDA UNDER SOIL HEALTH AND FERTILITY SCHEME OF RKVY
Construction of (G plus 5) building for structural engineering laboratory, geotechnical engineering laboratory, traffic engineering laboratory and classrooms under civil engineering department in the IIEST shibpur campus, Howrah. SH: Recommendation from West Bengal Fire and Emergency Services, Govt. of West Bengal and approval/sanction of plan from Howrah Municipal COrporation.
Hiring of Consultants - Milestone/Deliverable Based - Structural Design, Soil Investigation and Estimate Abstrack & Yardstick including BoQ and Current Market Rate Analysis for Provn of 06 x Class Room in Children School at Tezpur; DPR, RFP Preparatio..
Laying of Distribution System, Providing FHTC, Soil investigation, Construction of 500 cum capacity OHR, Construction of Pump House, Boundary Wall, Service Road, for Khamarkalla Zone-II in under N 24Pgs W/S Div-I, PHE Dte
Pump House ,150 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (124 nos) under JJM with allied work of BASUDEB BERYA PWSS
600 cum Capacity 20mtr. Staging Height RCC Elevated Reservoir As Per Departmental Type Design (Ref Dept. Super Struc. DRG. No. PCI/ OHR/8/2012) including Soil Investigation Foundation Design All pipe Connection ForDomjur ZoneVIII Domjur CT
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 162 Nos) under JJM with allied work for Chirulia-Chatla (Zone-I) PWSS within Egra-I Block
Sinking of deep tubewell....Pump,Chlorine room with sanitary arrangements,Boundary wall,Soil Investigation,Land development,Rising main,Laying distribution,road restoration for Zone-I,II...Providing FHTC....Hazarpur Zone-I,II WS Scheme,BIRBHUM Divn
Sinking of Tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 450 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road of Musan PWSS
Laying of Distribution System including specials,valves...all complete..Providing FHTC ..with all necessary ..Construction Of 900 Cum Capacity..RCC OHR..Soil Investigation all complete..Ground Based WS Scheme at Chapra Bangaljhi under Nadia Divn,PHED
Construction of 400 Cum. OHR with Soil Investigation,Pump,Chlorine Room with sanitary arrangement,Laying of Rising Main Distribution System with FHTC and different works related to LAYEKPUR PIPED WS SCHEME within Birbhum Division, PHE Dte
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 210 Nos) under JJM with allied work for Chirulia-Chatla (Zone-III) PWSS within Egra-I Block
Soil investigation in connection with construction of bridge over river Mori Ganga under Damodar Canal Division at Village-Champahati, G.P.-samudragarh, Block-Purbasthali-I. Purba Bardhaman. (IW/SI-96/2025-26), Project ID- IW252634310S000 (3rd Call)
Preparation of PPT and DPR Conducting traffic census including axle load survey (VDF) for a continuous period of 7days(7x24 hrs) along with complete Soil investigation, Topographical survey videography and photography in connection with Widening and
Sinking of Tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 200 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road of Gurkhair PWSS
Soil Investigation for widening and strengthening of B T Road from ch 17 00 km to ch 24 30 km in the district of North 24 Paraganas under Kolkata North Division during the year 22 23
Soil investigation for construction of proposed two 2 nos. R.C.C Bridge over Navigation Channel at Mouza Dilalpur G.P. Bagila Ch. 3156.00 and at Mouza Kanaidanga G.P. Daluibazar II Block Memari I Dist. Purba Bardhaman under Executi
Construction of 200 cum capacity RCC Elevated Reservoir, distribution system, rising main, IEP, Pump House, Boundary wall, FHTC, Soil Investigation for augmentation of ORD Terai Tea Garden PWSS under Naxalbari block under Siliguri Sub Division, PHED
Soil Investigation for construction of Proposed RCC Box Culvert over Moukhali Khal at Ch. 2.60 km near Ganesh Mandal House under Mouza- Moukhali Kumrakhali, P.S- Jibantala, Block- Canning-II under Canning (I) Sub-Division of JID
Preparation of Detailed Project Report along with Topographical Survey Soil Investigation Traffic Survey and Axle Load Survey etc related to the work Hatigeria Kultikri Rohini Rogra Road 0.00 Kmp to 25.427 Kmp Strengthening under Jhargram Highw
Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 300 Cum OHR ( Intze type with pile foundation ) Accommodate FHTC ( 900Nos) under JJM with allied work for Kadua Its Adjoining Mouzas Water Supply Scheme within Ramnagar
Sinking of Tubewell, Laying of Rising Main and Distribution System, Providing FHTC, Construction of 100 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road of Amai PWSS
Construction of 600 M3 capacity OHR with Soil Investigation and FHTC (Mouza- Hatinda, Kanua and Alihanda) of Hatinda Piped Water Supply Scheme at Chanchal-I Dev. Block under Malda Division, PHE Dte, Govt. of West Bengal.
soil investigation work for the Bridge located at 13.24 Km of Kanchanpur-Udaypur-Sindurpur-Pahargora (Santaldih) Road under Raghunathpur Sub Division PWD of Purulia Division PWD in the district of Purulia during the year 2022-23