Loading…
Loading…
1,854 results • Best match
12 Watt White-LED Based Solar Street Lighting System As
12 Watt White-LED Based Solar Street Lighting System As
Solar Water Heating System as per IS 12976:1990 (Q3)
12 Watt White-LED Based Solar Street Lighting System As
12 Watt White-LED Based Solar Street Lighting System As
12 Watt White-LED Based Solar Street Lighting System As
12 Watt White-LED Based Solar Street Lighting System As
12 Watt White-LED Based Solar Street Lighting System As
12 Watt White-LED Based Solar Street Lighting System As
12 Watt White-LED Based Solar Street Lighting System As
Xergy Solar Light Outdoor waterproof Dancing Fire Marshaal Flame tourch
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6493802 Dated : 29-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Solar Street Lighting System (NTPC) (Q3), Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3)
Solar Street Lighting System (NTPC) (Q3), Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3)
Supply, Installation and commissioning of 2.5 MW Outdoor type PCU for 100MW Solar project at Raghanesda
Custom Bid for Services - Development and Maintenance of of RE Portal for Processing Applications of Solar Wind and Hybrid SolarWind and Integration with existing Solar Rooftop Portal
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7038877 Dated : 24-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7039378 Dated : 24-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Solar Micro Pumping Systems as per MNRE Specification (Q3) (3 (3 ))
Solar Micro Pumping Systems as per MNRE Specification (Q3) (3 (3 ))
Solar powered robotics manhole cleaning robot with Electric towing cart (Q3)
Solar Micro Pumping Systems as per MNRE Specification (Q3) (3 (3 ))
Solar Micro Pumping Systems as per MNRE Specification (Q3) (3 (3 ))
waig solar 5 Star Electric Ceiling Fan with Brushless DC Motor
inverters solar inverter Bidder Turnover (Last 3 Years) 4 Lakh (s)
inverters solar inverter Bidder Turnover (Last 3 Years) 20 Lakh (s)
inverters solar inverter Bidder Turnover (Last 3 Years) 4 Lakh (s)
inverters solar inverter Bidder Turnover (Last 3 Years) 12 Lakh (s)
solar water heating system Experience with Government Required 3 Year (s)
SUPPLY OF SOLAR ROOF TOP PLANT 4KV AS PER DEMAND (Q3)
Solar Micro Pumping Systems as per MNRE Specification (Q3) (3 (3 ))
supply of 1cx4sqmm EBXL XLPO cables to NTPC Gandhar Solar Project
Solar Micro Pumping Systems as per MNRE Specification (Q3) (3 (3 ))
Custom Bid for Services - SITC of Solar and DG synchronization System
Supply installation and commissioning of Solar street Lights EnergyConservation Capital budget at NTPC Jhanor
Solar Panel 335 Watt, Inverter, Projector Screen With Stand, Bullet Camera, Emergency Light, Music Speaker, Acrylic Singular OP Name Board, Radium Tape 2 inch, DC Cable
Unbranded Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar, Unbranded Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar powered drinking water cooler, Capacity 150 (Litres/Hour)
Unbranded Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar, Unbranded Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar powered drinking water cooler, Capacity 40 (Litres/Hour)
aqueous Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar, aqueous Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar powered drinking water cooler, Capacity 150 (Litres/Hour)
Unbranded Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar, Unbranded Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar powered drinking water cooler, Capacity 40 (Litres/Hour)
Unbranded Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar, Unbranded Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar powered drinking water cooler, Capacity 40 (Litres/Hour)
Supply installation testing and commissioning of Solar Street Lighting at various Campuses of BSF SH SITC of Solar Street Lighting at various Campuses under Ftr HQ BSF Gujarat
Facility Management Services - LumpSum Based - Solar LED Camera Streetlighting System 20 Nos; Solar LED Camera Streetlighting System; Consumables to be provided by service provider (inclusive in contract cost)
Solar Street Lighting System (NTPC) (Q3), MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2)
usha Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar powered, usha Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar powered drinking water cooler, Capacity 150 (Litres/Hour)
usha Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar powered, usha Stainless Steel(Grade AISI 304),thickness >= 0.8 mm Solar powered drinking water cooler, Capacity 150 (Litres/Hour)
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3)
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3)
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3)
Solar Water Heating System as per IS 12976:1990 (Q3) (3 (3 ))