Loading…
Loading…
1,674 results • Best match
Installation of Solar Base (Wireless) Traffic Signals at major squaresof the city. (IV call)
Repair/ Maintenance of street lights, perimeter lights and solar street lights at AFS Amla
ONLINE RCO FOR SUPPLY OF SOLAR DEHYDRATOR FOR THE YEAR 2023-24 AND ONWARDS
Repairing of 40kVA 3 phase Solar Inverter system including commissioning of Net Metering system.
SOLAR HIGH MASK LIGHT SHOULD BE INSTALLED AT VARIOUS LOCATION IN WARD NUMBER 11
SOLAR POWERED LED STREET LIGHTING SYSTEM SUPPLY AND INSTALLATION AT NTPC GADARWARA RESERVOIR AREA.
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years of Experience and Turnover
REPAIR REPLACEMENT AND ROUTINE MAINTENANCE OF SOLAR WATER HEATING SYSTEM AT AF STATION GWALIOR
REPAIR / MAINT OF STREET LIGHT, HIGH MAST LIGHT AND SOLAR LIGHT AT DRONACHAL BHOPAL
REPAIR/REPLACEMENT AND ROUTINE MAINT OF SOLAR WATER HEATING SYSTEM AT AF STATION GWALIOR
REPAIR MAINT OF SOLAR WATER HEATERS WITH OTHER ALLIED WORKS UNDER GE AWC MHOW
Installed of solar high mast system at village khukhedi-gulabganj road vidisha Dist- Vidisha
Balance work of Installation of Solar pumps 7 nos in nearby villages under CSR.
REPAIR MAINT OF SOLAR WATER HEATER AND GEYSERS UNDER GE MAINT INF SCHOOL MHOW
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years of Experience and Turnover
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
12 Watt White-LED Based Solar Street Lighting System As Per MNRE Specification (Q3)
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
Request for Proposal for Solar Roof top Projects in Madhya Pradesh under RESCO Model
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
External Electrification with Solar Street Light work at Toys Cluster Budhni District Sehore (M.P.)
Selection of Firm for Preparation of DPR for Identified Solar Parks in Madhya Pradesh
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years of Experience and Turnover
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years of Experience and Turnover
Supply of Solar Charge Controller 110 V/60 AMP Make- Tata B.P or equivalent.
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) (3 (3 ))
12 Watt White-LED Based Solar Street Lighting System As Per MNRE Specification (Q3)
12 Watt White-LED Based Solar Street Lighting System As Per MNRE Specification (Q3)
Supply and Insttalation of 150 nos of Solar Street light in Projectaffected and vicinity villages KHARGONE STPP
Supply, installation of the solar based portable Traffic Signals in Indore City Under IMC on Rental basis
Development of Transmission System for 1500 MW Solar parks in Madhya Pradesh in Agar Shajapur and Neemuch district
Solar Water Heating System as per IS 12976:1990 (Q3), Roti Making Machine (Q3) MSE Exemption for Years of Experience and Turnover
Solar Water Heating System as per IS 12976:1990 (Q3), Roti Making Machine (Q3) MSE Exemption for Years of Experience and Turnover
Supply and commissioning with buyback of 25 KW solar inverter and batteries at NH-3 shopping complex in Township of NTPC-Vindhyachal.
Solar Water Heating System as per IS 12976:1990 (Q3), Roti Making Machine (Q3) MSE Exemption for Years of Experience and Turnover
Solar Water Heating System as per IS 12976:1990 (Q3), Roti Making Machine (Q3) MSE Exemption for Years of Experience and Turnover
Solar Water Heating System as per IS 12976:1990 (Q3), Roti Making Machine (Q3) MSE Exemption for Years of Experience and Turnover
Solar Water Heating System as per IS 12976:1990 (Q3), Roti Making Machine (Q3) MSE Exemption for Years of Experience and Turnover
Solar Water Heating System as per IS 12976:1990 (Q3), Roti Making Machine (Q3) MSE Exemption for Years of Experience and Turnover
Solar Water Heating System as per IS 12976:1990 (Q3), Roti Making Machine (Q3) MSE Exemption for Years of Experience and Turnover
Solar Water Heating System as per IS 12976:1990 (Q3), Roti Making Machine (Q3) MSE Exemption for Years of Experience and Turnover
Solar bollard LED light 3watts with inbuilt Solar panel : 3V 3W, Battery : 3.7V 4Ah, Charging time : 6-8 Hrs., Lighting time :8-10 Hrs. Make - Edisson lights Model - Torus/3W,Havells or similar A w
High Mast Lighting Octagonal Tower With Solar Based LED Street Light (V2) (Q2) (3 (3 ))
REPAIR MAINTENANCE OF GEYSERS SOLAR WATER HEATING SYSTEM AND CONNECTED WORK UNDER GE MIS MHOW